France: Bolloré announces a battery gigafactory in Alsace by 2030

Bolloré will produce new-generation batteries in a gigafactory in Alsace by 2030, creating almost 1,500 jobs.

Share:

Gigafactory Batteries Bolloré Alsace

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The Bolloré group has made official its plans to build a gigafactory in Alsace to produce new-generation batteries. The announcement was made during a visit by French Economy Minister Bruno Le Maire to the Blue Solutions battery plant in Ergué-Gabéric, Brittany. Scheduled to be operational by 2030, the Gigafactory aims to create around 1,500 jobs and produce 25 gigawatt-hours (GWh) of batteries a year, equivalent to 250,000 vehicles.

A new industrial sector

The gigafactory project in Alsace symbolizes the reindustrialization of France. The Minister of the Economy stressed that this project marked an important step in the creation of a new industrial sector in France. At the same time, a pilot line will be built in Ergué-Gabéric from 2026, creating 230 additional jobs. The Brittany region and the Quimper Bretagne Occidentale conurbation will contribute between 13 and 14 million euros to the financing of this pilot line.

New-generation batteries

Blue Solutions’ 4th generation batteries are solid lithium-metal batteries. According to Bolloré, these batteries offer 40% more range than current lithium-ion batteries. They are also claimed to be faster to recharge, with higher energy density and reduced self-discharge. Group CEO Cyrille Bolloré highlighted Bolloré’s unique innovation, claiming that the group is the only one in the world to have industrialized the production of solid lithium-metal batteries after its involvement in the biodiesel field.

Public investment and support

The gigafactory project represents a total investment of over 2.2 billion euros. Details of public funding for this project have not been released by the Ministry of the Economy or the Alsace region. Nonetheless, this project is seen as a key element in France’s reindustrialization strategy, with a production sector for electric batteries that didn’t exist five years ago.

Perspectives and objectives

With this project, France aims to recreate a new industrial sector that could represent some 20,000 industrial jobs within ten years. The gigafactory’s annual production capacity of 25 GWh will support the transition to electric vehicles, responding to growing demand for more sustainable energy solutions.
Bolloré’s gigafactory project in Alsace represents a major step forward in France’s energy transition. The Bolloré Group is positioning itself as a world leader in the field of new-generation batteries, based on the technological innovation of solid-state lithium-metal batteries. The project promises to transform the French industrial landscape and boost the country’s competitiveness in the renewable energies sector.

Canadian company Vision Lithium has completed a private placement of 14 mn flow-through shares totalling $209,000 to support its mineral exploration projects in Québec.
Matrix Renewables has signed a turnkey agreement with Tesla to develop a 1 GWh battery energy storage system in Scotland, marking its first standalone project of this kind in the UK.
China's electricity market overhaul improves the profitability of energy storage, supporting a rapid increase in battery exports as global demand rises with data centres and power grids.
South Korea’s Tilda accelerates its entry into Vietnam with an artificial intelligence-based energy optimisation solution for solar and energy storage systems in the manufacturing sector.
Aegis Critical Energy Defence Corp. and Seetel New Energy have created Cordelia BESS to respond to Ontario’s LT2 call for proposals, aimed at strengthening energy capacity through battery storage.
esVolta finalises investment tax credit transfer for its Black Walnut storage project to Computacenter, marking a first-of-its-kind operation within its California energy portfolio.
Peregrine Energy Solutions has begun construction on a 500 MWh storage project in Texas, relying on Wärtsilä's technology and WHC's engineering expertise to enhance ERCOT grid flexibility.
The world's largest battery energy storage system enters service in Saudi Arabia, with an annual capacity of 2.2 billion kWh spread across three strategic sites in the southwest of the country.
Masdar begins commercial operations at a Stockport battery storage unit and announces two more UK projects, part of a £1bn ($1.25bn) plan for 3GWh of BESS capacity.
Australia-based storage platform Akaysha Energy has launched its first operational project, a 155 MW battery in Queensland, while confirming its expansion to over 1 GWh.
LehmanSoft Japan connected a 2MW/8.1MWh energy storage facility to the grid in Chichibu City, marking its entry into the Japanese stationary storage market.
Akuo launches a large-scale electricity storage project in Boulouparis, with a 200 MWh capacity, to support New Caledonia’s grid stability and reinforce the integration of renewable energies.
Spie and Tesla have signed a framework agreement to install battery electricity storage systems in Europe, focusing on France, Poland and Germany.
The group has won a strategic project with operator Amprion to deploy five 50 MW batteries to ease pressure on the German power grid and optimise electricity transmission.
Vena Energy has begun construction of a 408 MWh battery energy storage system in Tailem Bend, marking a new phase in the deployment of its infrastructure in Australia.
The explosion of battery storage applications in Germany is causing grid congestion and pushing Berlin to revise its regulatory framework to prevent market saturation.
The collapse in storage costs positions batteries as a key lever for dispatchable solar, but dependence on Chinese suppliers creates growing tension between competitiveness and supply chain security.
JA Solar has launched a microgrid combining 5.2 MW of solar and 2.61 MWh of storage at an industrial site in Sicily, marking its first application of the "PV+Storage+X" model in Italy.
Sinexcel has installed a 2MW/8MWh energy storage system in Matsusaka, marking a breakthrough in a regulated market after five years of technical partnerships and gradual deployment in Japan.
Inlyte Energy has successfully completed factory validation testing of its first full-scale iron-sodium battery, witnessed by Southern Company, paving the way for a pilot installation in the United States in early 2026.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.