Arctech secures a 2.3 GW solar project in Saudi Arabia, surpassing 15 GW in the MEA region

Arctech, the global leader in solar tracking and racking solutions, strengthens its position in the MEA region by supplying 2.3 GW of SkyLine II solar trackers for a major project in Saudi Arabia, in partnership with ACWA Power.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

After signing a major agreement with China Energy Engineering Group Co., Ltd., Arctech, a key player in solar technologies, has reached a new milestone with the delivery of 2.3 GW of SkyLine II solar trackers for the PIF4-Haden project of ACWA Power in Saudi Arabia.

Technology and Resilience in Harsh Weather Conditions

Located in a desert region often subjected to strong winds, the PIF4-Haden project benefits from the advanced technology of SkyLine II. The 1P solar tracking system is equipped with a multi-point synchronization mechanism that allows securing the solar panels when wind speeds reach 22 m/s. This feature not only ensures the system’s stability but also improves the overall energy production over the long term.

Optimizing Efficiency and Reducing Costs

SkyLine II is designed to maximize land use efficiency through its modular structure. This modular design allows for greater flexibility in panel installation, thereby reducing the costs of solar plant installations. This technological advancement meets the demands of the PIF4-Haden project, which is part of the “Saudi Vision 2030” initiative, a strategic plan aimed at diversifying Saudi Arabia’s economy and reducing dependence on fossil fuels.

Contribution to Vision 2030

The project is expected to become commercially operational in 2027 and produce around 156.189 billion kilowatt-hours over 25 years, which corresponds to a reduction of nearly 147 million tons of CO2 emissions. With offices in Dubai and Riyadh, as well as a manufacturing base in Jeddah, Arctech is fully committed to this energy transition by providing tailored and comprehensive services for the Middle East and Africa region.

With 16.8 MWp of capacity, the Triticum plant in Bavaria marks a strategic investment for MaxSolar, strengthening the agrivoltaic model in the German energy landscape.
Greencells has signed a partnership with Belgian company 3E to transfer over 3 GW of solar and storage capacity to SynaptiQ, a central monitoring and analytics platform.
Spanish group Grenergy has signed an agreement to sell seven solar projects with a total capacity of 88 MW to Ecopetrol, as part of its asset rotation strategy.
Zenith Energy has launched a tender for the construction of three solar plants totalling 7 MWp in Italy, with expected bank financing covering up to 90% of costs.
JA Solar unveils a pioneering white paper on photovoltaic systems in arid regions, with a module designed to withstand extreme desert conditions and improve long-term energy yield.
Shikoku Electric Power lowers its acquisition threshold for solar projects to 500kWAC and calls for proposals to develop floating plants on reservoirs of at least 15,000m².
Canadian Solar has started delivering non-fossil certificates from a new 20 MWAC solar plant in Okayama under a 25-year virtual power purchase agreement with a Japanese company.
Ecopetrol has reached a conditional agreement to acquire seven companies holding photovoltaic projects across four Colombian departments, for a total potential of 88.2 MWp.
Three photovoltaic plants will receive financing structured by the European Bank for Reconstruction and Development to strengthen Romania's electricity capacity and attract private capital to the sector.
Loiret Energie and Terres d’Energie Développement will invest €15mn in a 31.5-hectare agrivoltaic farm in La Ferté Saint-Aubin, combining electricity production and organic cattle farming.
Canadian Solar Infrastructure Fund makes its first acquisition outside the FIT scheme with a 1.1 MW solar plant in Tsukuba, valued at ¥253.5mn ($1.7mn), under a corporate PPA agreement.
The agreement will enable Bisleri to meet 48% of the electricity needs at its Sahibabad site through solar power supplied by Sunsure, cutting annual CO₂ emissions by nearly 2,700 tons.
Vikram Solar has commissioned a new 5 GW automated plant in Vallam, Tamil Nadu, raising its total capacity to 9.5 GW and marking a key milestone in its industrial expansion strategy in India.
Norwegian group Scatec is developing a 1.1 GW solar plant with 200 MWh of storage for Egypt Aluminium, under a 25-year contract backed by the EIB, AfDB and EBRD.
GreenYellow has signed a major energy deal with Dohome to deploy 10.5 MWp of solar and 13 MWh of storage across 15 sites, marking one of the largest hybrid projects in Thailand’s retail sector.
ENEOS Renewable Energy will develop two solar installations totalling 4MW on a decommissioned JR Hokkaido line, under a power supply agreement signed with the railway company and the regional electric utility.
RWE has commissioned a project combining 200 MW of solar and 100 MW of battery storage in Milam County, Texas, addressing the growing electricity demand and expanding its operations in the United States.
EDP has launched operations of a rooftop solar plant at Johnson Electric’s site in Asti, targeting an annual output of 400 MWh to strengthen the manufacturer’s energy autonomy and stabilise electricity costs.
PowerField increased its operational capacity to 300 MWp by integrating seven new solar parks, developed or acquired before construction, across four Dutch provinces.
Idex has inaugurated a photovoltaic power plant spanning 14,500 m² at Ainterexpo's parking area, developed in partnership with Grand Bourg Agglomération under a 30-year operating model.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.