Faria Renewables acquiert deux parcs éoliens pour un total de 30,8 MW en Grèce

Faria Renewables a finalisé l’acquisition de deux projets éoliens d’une capacité cumulée de 30,8 MW, consolidant son portefeuille d’actifs en Grèce et poursuivant son expansion stratégique sur le marché national.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Faria Renewables a annoncé l’acquisition et l’intégration de deux projets éoliens d’une puissance totale de 30,8 mégawatts (MW), renforçant sa présence sur le marché grec des énergies renouvelables. Cette opération s’inscrit dans une stratégie de transfert ciblé d’actifs, orientée vers des projets déjà structurés et prêts à entrer dans des phases avancées de développement ou d’exploitation.

Un portefeuille diversifié atteignant 3 500 MW

Avec cette acquisition, le portefeuille global de Faria Renewables s’élève désormais à environ 3 500 MW en Grèce, incluant des projets à différents stades de maturité. La société combine dans son développement des projets photovoltaïques (PV), des parcs éoliens terrestres et des solutions de stockage énergétique, dans une logique de complémentarité technologique.

Cette approche multi-technologies permet de répartir les risques tout en maintenant une compétitivité accrue face aux évolutions du marché de l’électricité. Faria Renewables continue ainsi d’élargir sa base d’actifs, en ciblant des infrastructures prêtes à être intégrées dans son modèle opérationnel existant.

Accent mis sur les projets en phase de raccordement

L’entreprise privilégie les projets considérés comme matures ou proches du raccordement au réseau, afin de réduire les incertitudes liées aux autorisations et aux délais de déploiement. Ce choix stratégique vise à sécuriser les revenus futurs tout en accélérant la rentabilité des investissements réalisés.

Parallèlement à l’intégration de nouveaux actifs, Faria Renewables évalue en continu les opportunités de transfert de projets disposant de conditions de raccordement déjà établies. Cette logique permet d’optimiser le rythme de croissance de son portefeuille sans dépendre entièrement du développement interne.

Stratégie de consolidation du marché local

Le renforcement du portefeuille intervient dans un marché énergétique grec caractérisé par une intensification des transactions d’actifs. La capacité à identifier et absorber rapidement des projets avancés devient un facteur clé pour les acteurs souhaitant consolider leur position dans un environnement en mutation.

Faria Renewables affirme poursuivre activement cette stratégie, en capitalisant sur sa structure interne et son expérience dans l’intégration de projets multi-technologies. L’objectif annoncé reste de constituer un portefeuille résilient, capable de répondre aux exigences de flexibilité du réseau électrique tout en assurant la continuité de la production.

The rapid growth of onshore wind in Southeast Asia is at risk due to inflexible public policies and inadequate power transmission infrastructure.
Enefit Green has sold its only wind farm in Finland to Canadian fund TD Greystone Infrastructure Fund, refocusing operations on the Baltic states and Poland in a regional concentration strategy.
McDonald’s UK commits to purchasing all electricity from the Douglas West Extension Wind Farm, a 66 MW project developed by Capital Dynamics in Scotland, under a long-term agreement managed by ENGIE.
Swedish developer OX2 acquires three onshore wind projects totalling 235 MW in Romania, pushing its portfolio beyond 1.1 GW in a rapidly growing market.
Danish group Vestas is expanding its blade plant in Poland and creating more than 300 jobs to supply turbines to Germany, the leading onshore wind market in Europe.
The UK government has approved the development consent for the 480 MW Morecambe offshore wind farm, a project led by Copenhagen Infrastructure Partners and scheduled to enter construction in 2027.
Infinity Power has started work on its 200 MW wind project in Ras Ghareb, strengthening its position in the African market with technical support from China's POWERCHINA Huadong.
A partnership between the European Investment Bank and Crédit Agricole CIB aims to generate up to €8 billion in wind energy investments across the European Union through a bank guarantee mechanism.
With a €600mn ($652mn) contribution, the European Investment Bank becomes the main lender of the BC-Wind offshore wind project developed by Ocean Winds off the Polish coast.
Cadeler has taken delivery of its tenth wind turbine installation vessel, Wind Mover, delivered ahead of schedule and immediately deployed in Europe, strengthening its capabilities amid rising industrial demand.
Levanta Renewables partners with Triconti Windkraft Group to develop an onshore wind farm in Quezon province, scheduled to begin operations in 2028.
BW Ideol Projects Company acquires a minority stake in the Méditerranée Grand Large project, strengthening its partnership with EDF power solutions and Maple Power in the Mediterranean floating offshore wind sector.
Octopus Energy joins a global initiative to accelerate renewable energy deployment in Africa, committing $450mn through its Power Africa programme to supply electricity to more than one million people.
Australian energy provider Snowy Hydro has secured long-term agreements with Aula Energy and TagEnergy, adding 120 MW of wind power and 105 MW of battery storage to its national portfolio.
The He Dreiht offshore wind farm delivers its first MWh as the German auction model stalls, offering EnBW and its institutional investors a strategic showcase.
The Irish government has provisionally awarded development rights for the Tonn Nua offshore site to the Ørsted-ESB joint venture under a 20-year contract supporting a 900 MW project.
Nordex Group will supply six turbines to upgrade a 34.2 MW wind farm in Caparroso, financed by the European Union under the NextGenerationEU plan.
The Spanish group continues its asset rotation strategy by transferring its French onshore wind and solar portfolio to Technique Solaire, reinforcing its focus on offshore and regulated networks.
Japanese group Eurus Energy has completed the environmental assessment for its 60.2MW repowering project in Wakkanai, with commissioning targeted for April 2029.
BayWa r.e. has reached a strategic milestone with the concept certification of its BayFloat floating substructure, validated by DNV according to current floating offshore wind standards.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.