Enhancing hydroelectric flexibility in the United States

The U.S. Department of Energy is investing in improving the flexibility of hydropower, thereby strengthening the integration of renewable energies into the power grid.

Share:

Innovation et flexibilité en hydroélectricité

Subscribe for unlimited access to all energy sector news.

Over 150 multisector articles and analyses every week.

Your 1st year at 99 $*

then 199 $/year

*renews at 199$/year, cancel anytime before renewal.

The recent announcement of $9.5 million in funding from the U.S. Department of Energy’s Water and Power Technology Office (WPTO) marks an important milestone in the development of hydropower. The aim of this funding is to increase the flexibility of hydroelectricity, enabling better management of the variability of energy sources such as wind and solar power in the power system.

Impact of Hydropower on the U.S. Power Grid

Hydropower currently accounts for 28.7% of total renewable electricity generation in the United States, and around 6.2% of the country’s total electricity production. What’s more, its ability to supply electricity immediately or store it to meet demand in real time is a major asset. The increase in this capacity, thanks to this investment, reinforces the role of hydropower in supporting a power grid that integrates an increasing amount of variable renewable energy resources, thus contributing to the United States’ clean energy objectives.

Details of Financing and Project Areas

The funding will support projects in three main areas. The U.S. Department of Energy will allocate up to $4 million to projects that demonstrate hybrid hydropower configurations, such as a hydropower facility combined with another type of generation or an energy storage resource. It will also devote an equivalent sum to projects aimed at advancing technological innovations to improve the flexible capabilities of the US hydroelectric fleet. Finally, the department will allocate up to $1.5 million to projects that quantify the flexible capabilities of hydropower and develop operational strategies to increase this flexibility, with the aim of better serving an evolving power grid.

Synergies and Innovative Technologies in Hydropower

Between four and seven awards are planned as part of the funding opportunity to increase hydropower flexibility. Individual awards will range from $750,000 to $4 million. The Hybrid Hydropower Demonstration area will support demonstrations of hybridized hydropower operations, where hydropower is co-located and co-operated with at least one other non-hydropower generation or storage resource. This area is driven by industry insights and previous research suggesting that synergies between the characteristics of hydropower and other resources can expand capabilities to deliver improved grid services, reduce machine wear and tear, and mitigate environmental impacts.

Strategies for increasing operational flexibility

The area, Technologies for Increasing Flexibility, will support the testing of advanced hydroelectric components, tackling constraints at the component level of a hydroelectric installation. Driven by industry discussions and targeted technical workshops with manufacturers, this area builds on previous research to de-risk promising new technologies so that they can progress towards widespread deployment.

The Operational Flexibility domain develops operational strategies, model enhancements and related tools that enable individual facilities or coordinated sets of facilities (for example, in cascading river systems) to increase their net flexibility. However, informed by previous research by academics, national laboratories and other research organizations, this area will target projects that advance the state of the art while pursuing the incorporation of these advances into actual industry operational practice.

Deadlines and Procedures for Project Proposals

Applicants must submit their concept proposals by 5 p.m. ET on January 18, 2024 to be eligible to submit a full application. The deadline for responses to reviewers’ comments is May 23, 2024. The expected date for DOE selection notifications is August 2024, and the expected timeframe for award negotiations is August to November 2024.

This financing initiative represents a significant step towards the smoother integration of renewable energies into the US power grid. By enhancing the flexibility of hydropower, this project not only supports the country’s clean energy goals, but also paves the way for technological and operational innovations that could redefine the future of renewable energy.

Swedish company Eco Wave Power has completed testing of its technology at the Port of Los Angeles, reaching a tangible milestone with the launch of its floaters to generate electricity from waves.
Georgia Power continues technical upgrades at several hydroelectric plants in Georgia, with approval from the public regulator, to ensure the reliability of the state’s electricity grid.
A landmark auction in Brazil allocates 815 MW to medium-sized hydroelectric plants, with grid injection scheduled from 2030.
ISDN Holdings strengthens its position in Indonesia by acquiring a majority stake in PT Funda, integrating hydropower capabilities across the entire project lifecycle and consolidating its renewable energy investments.
The Port of Suao becomes the first site in Taiwan open to commercial testing of wave energy production, following the allocation of Lot C to I-KE International Ocean Energy Co., partner of Eco Wave Power.
With active projects across four continents and strong liquidity, Eco Wave Power accelerates its expansion strategy while absorbing a rise in operational costs in H1 2025.
Eco Wave Power has completed the full installation of its wave energy system at the Port of Los Angeles, paving the way for initial operational tests scheduled for September.
A 60-gigawatt hydropower dam under construction in Tibet will increase national capacity by 16%, with an estimated cost of $167bn supported by a new state entity.
Eco Wave Power has completed the installation of floaters for its pilot project in Los Angeles, marking a strategic milestone in the validation and commercialisation of its wave energy technology in the US market.
Brookfield Renewable announces an investment of up to $1 billion to increase its stake in the Colombian energy company Isagen to 38%. Qatar Investment Authority (QIA) is also co-investing to raise its stake to 15%.
Beijing has launched the construction of a colossal dam on the Yarlung Tsangpo, with $167.1bn in public investment, drawing attention from New Delhi and downstream states.
Brookfield and Google formalise an unprecedented framework agreement to supply up to 3,000 MW of hydropower, with initial contracts worth more than $3 billion for facilities in Pennsylvania.
Eco Wave Power Global AB announces the completion of floaters manufacturing for its first American pilot plant, marking a major step towards the imminent deployment of wave energy at the Port of Los Angeles.
Eco Wave Power Global AB joins a consortium funded with €2.45mn by the European Interreg Atlantic Area programme to accelerate commercial implementation of wave energy technologies in Atlantic coastal regions.
Minesto has completed a reorganization that led to a 35% reduction in fixed costs and a focus on its future commercial projects. This reorganization includes geographical streamlining, a new management team, and a realignment of product development priorities.
Eco Wave Power shareholders approve renewed authorization to repurchase American Depositary Shares representing up to 10% of the company's total share capital, during the 2025 Annual General Meeting held in Stockholm, Sweden.
Proteus Marine Renewables' AR1100 tidal turbine, with a capacity of 1.1MW, obtains official Japanese certification and starts supplying electricity to the national grid after meeting stringent safety and reliability standards.
Swedish company Minesto will lead a consortium awarded €2.1 million funding to install an autonomous tidal-powered microgrid in the Faroe Islands aimed at off-grid communities.
Eco Wave Power Global AB will officially launch the first U.S. pilot wave energy project at the Port of Los Angeles on September 9, in partnership with AltaSea, an organization specializing in innovative maritime solutions.
The Burundian government officially launches the first phase of the Jiji-Mulembwe hydroelectric complex, a strategic 49.5 MW capacity project aimed at enhancing national energy supply through substantial international financing.

Log in to read this article

You'll also have access to a selection of our best content.

or

Go unlimited with our annual offer: $99 for the 1styear year, then $ 199/year.