ENGIE inaugurates its first wind turbine in Brazil

ENGIE confirms its commitment to the energy transition with the installation of its first wind turbine in the Santo Agostinho complex in Brazil.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

ENGIE has received the green light for its first wind turbine in Brazil. It is the National Agency of Electric Energy (ANEEL) that gave its agreement to the company for the commercial exploitation of its wind turbine of a capacity of 6,2 MW of the wind complex of Santo Agostinho. The latter is located in the municipalities of Lajes and Pedro Avelino in the state of Rio Grande do Norte. In other words, the complex will have an installed capacity of 434 MW once completed, comprising 14 wind farms with a total of 70 wind turbines.

This authorization is an illustration of Brazil’s strategy to develop in renewable energies, particularly in wind energy.

22 months of efforts for ENGIE and the installation of its first wind turbine in Santo Agostinho

The construction of this first wind turbine in Brazil by ENGIE is the result of more than 22 months of efforts to set up the Santo Agostinho wind complex. Indeed, this project represents an investment of about R$ 2.3 billion for ENGIE, the company responsible for its implementation. The Complex further strengthens ENGIE’s objective to develop in renewable energies, with Brazil at the heart of this strategy. In addition, the implementation of Santo Agostinho is intended to meet the Company’s commitments and ensure a competitive advantage in the open contracting environment.

ENGIE Brasil Energia already has over 1.2 GW of installed wind generation capacity in its portfolio. The Serra do Assuruá project, located in the municipality of Gentio do Ouro (BA), will also add an additional 846 MW of power generation capacity, which is in the initial stages of implementation. In addition, the generator fleet will include the 434 MW of Santo Agostinho over the next two years.

Social projects to strengthen ENGIE’s impact in Brazil

Beyond its energy production mission, ENGIE is committed to investing in social projects to promote education, income generation and social well-being in the cities where its projects are located. This initiative is part of its commitment to contribute to the social and economic development of local communities.

In the city of Santo Agostinho, ENGIE has already considered 21 social projects for an amount of about R$ 4 million in private social investment. These projects aim to improve the living conditions of local communities and help them to develop socially and economically.

Among the projects supported by ENGIE in Lajes and Pedro Avelino are the construction of a multipurpose center at a cost of R$1.4 million, as well as the modernization of the 03 de Agosto, Distrito de Firmamento and Rio do Feijão community centers.

ENGIE has received approval from the National Electricity Agency (ANEEL) for the commercial operation of its first wind turbine in Brazil, located in the Santo Agostinho wind complex in the state of Rio Grande do Norte. This complex reinforces ENGIE’s objective to develop in renewable energies, with Brazil at the heart of its strategy. Beyond its energy production mission, ENGIE is committed to investing in social projects to contribute to the social and economic development of local communities.

Swedish developer OX2 acquires three onshore wind projects totalling 235 MW in Romania, pushing its portfolio beyond 1.1 GW in a rapidly growing market.
Danish group Vestas is expanding its blade plant in Poland and creating more than 300 jobs to supply turbines to Germany, the leading onshore wind market in Europe.
The UK government has approved the development consent for the 480 MW Morecambe offshore wind farm, a project led by Copenhagen Infrastructure Partners and scheduled to enter construction in 2027.
Infinity Power has started work on its 200 MW wind project in Ras Ghareb, strengthening its position in the African market with technical support from China's POWERCHINA Huadong.
A partnership between the European Investment Bank and Crédit Agricole CIB aims to generate up to €8 billion in wind energy investments across the European Union through a bank guarantee mechanism.
With a €600mn ($652mn) contribution, the European Investment Bank becomes the main lender of the BC-Wind offshore wind project developed by Ocean Winds off the Polish coast.
Cadeler has taken delivery of its tenth wind turbine installation vessel, Wind Mover, delivered ahead of schedule and immediately deployed in Europe, strengthening its capabilities amid rising industrial demand.
Levanta Renewables partners with Triconti Windkraft Group to develop an onshore wind farm in Quezon province, scheduled to begin operations in 2028.
BW Ideol Projects Company acquires a minority stake in the Méditerranée Grand Large project, strengthening its partnership with EDF power solutions and Maple Power in the Mediterranean floating offshore wind sector.
Octopus Energy joins a global initiative to accelerate renewable energy deployment in Africa, committing $450mn through its Power Africa programme to supply electricity to more than one million people.
Australian energy provider Snowy Hydro has secured long-term agreements with Aula Energy and TagEnergy, adding 120 MW of wind power and 105 MW of battery storage to its national portfolio.
The He Dreiht offshore wind farm delivers its first MWh as the German auction model stalls, offering EnBW and its institutional investors a strategic showcase.
Nordex Group will supply six turbines to upgrade a 34.2 MW wind farm in Caparroso, financed by the European Union under the NextGenerationEU plan.
The Spanish group continues its asset rotation strategy by transferring its French onshore wind and solar portfolio to Technique Solaire, reinforcing its focus on offshore and regulated networks.
Japanese group Eurus Energy has completed the environmental assessment for its 60.2MW repowering project in Wakkanai, with commissioning targeted for April 2029.
BayWa r.e. has reached a strategic milestone with the concept certification of its BayFloat floating substructure, validated by DNV according to current floating offshore wind standards.
A full-scale testing programme will begin in January to assess a blade reinforcement technology developed by Bladena, as ageing offshore wind fleets raise durability challenges.
Africa's first wind project led by a Chinese company, the De Aar plant generates 770 million kWh annually and focuses on developing local talent.
SPIE Wind Connect has been selected by DEME Offshore to carry out all connection and high-voltage cable testing work for the 3.6 GW Dogger Bank offshore wind project off the UK coast.
German group Nordex will supply three turbines to developer BMR for a 21 MW project in North Rhine-Westphalia, bringing BMR's total orders to nearly 110 MW in 2025.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.