Minesto launches its second tidal power plant

Minesto commissions Dragon 4, its second tidal power plant. It contributes to the objectives of the energy transition.

Share:

Subscribe for unlimited access to all the latest energy sector news.

Over 150 multisector articles and analyses every week.

For less than €3/week*

*For an annual commitment

*Engagement annuel à seulement 99 € (au lieu de 149 €), offre valable jusqu'au 30/07/2025 minuit.

Minesto commissions Dragon 4, its second tidal power plant. Located in the Faroe Islands, this plant is part of a larger project aiming at 100% renewable energy by 2030. Second tidal power plant for Minesto Minesto, with this new plant, will supply the municipality of Vestmanna in the Faroe Islands.…

Minesto commissions Dragon 4, its second tidal power plant. Located in the Faroe Islands, this plant is part of a larger project aiming at 100% renewable energy by 2030.

Second tidal power plant for Minesto

Minesto, with this new plant, will supply the municipality of Vestmanna in the Faroe Islands. With an installed capacity of 20 to 40 MW, it will provide, like the first plant, ready-to-use energy. The company, specializing in marine energy technology, a tidal kite technology on the grid.

With this project, Minesto sets itself apart from other tidal plants by its simplicity. Dragon 4 can be easily deployed without the need for a lot of manpower. Thus, a small team can assemble and launch the kite in a few hours, in virtually any tidal condition.

A promising energy plan

This Dragon 4 tidal power plant is the second one launched by Minesto in the Faroe Islands. The first one was born a few months earlier, in May 2022. They are part of a larger plan that includes a total of four sites that would together supply 40% of the country’s energy.

The important observation is the three-month gap between these two installations, which is explained by the configuration tests performed.

Bernt Erik Westre, Director of New Technologies, states:

“At first glance, the two “Dragon 4″ kites look identical, although a few improvements were implemented as part of the product development process. There are only three months between the installation of these two units, and it is gratifying to note that this short period of time is sufficient to evaluate, decide, install and test the upgrades before delivery. It also underscores the ease of manufacturing of our technology.”

Finally, this speed also illustrates the potential of Minesto’s tidal plants.

 

With active projects across four continents and strong liquidity, Eco Wave Power accelerates its expansion strategy while absorbing a rise in operational costs in H1 2025.
Eco Wave Power has completed the full installation of its wave energy system at the Port of Los Angeles, paving the way for initial operational tests scheduled for September.
A 60-gigawatt hydropower dam under construction in Tibet will increase national capacity by 16%, with an estimated cost of $167bn supported by a new state entity.
Eco Wave Power has completed the installation of floaters for its pilot project in Los Angeles, marking a strategic milestone in the validation and commercialisation of its wave energy technology in the US market.
Brookfield Renewable announces an investment of up to $1 billion to increase its stake in the Colombian energy company Isagen to 38%. Qatar Investment Authority (QIA) is also co-investing to raise its stake to 15%.
Beijing has launched the construction of a colossal dam on the Yarlung Tsangpo, with $167.1bn in public investment, drawing attention from New Delhi and downstream states.
Brookfield and Google formalise an unprecedented framework agreement to supply up to 3,000 MW of hydropower, with initial contracts worth more than $3 billion for facilities in Pennsylvania.
Eco Wave Power Global AB announces the completion of floaters manufacturing for its first American pilot plant, marking a major step towards the imminent deployment of wave energy at the Port of Los Angeles.
Eco Wave Power Global AB joins a consortium funded with €2.45mn by the European Interreg Atlantic Area programme to accelerate commercial implementation of wave energy technologies in Atlantic coastal regions.
Minesto has completed a reorganization that led to a 35% reduction in fixed costs and a focus on its future commercial projects. This reorganization includes geographical streamlining, a new management team, and a realignment of product development priorities.
Eco Wave Power shareholders approve renewed authorization to repurchase American Depositary Shares representing up to 10% of the company's total share capital, during the 2025 Annual General Meeting held in Stockholm, Sweden.
Proteus Marine Renewables' AR1100 tidal turbine, with a capacity of 1.1MW, obtains official Japanese certification and starts supplying electricity to the national grid after meeting stringent safety and reliability standards.
Swedish company Minesto will lead a consortium awarded €2.1 million funding to install an autonomous tidal-powered microgrid in the Faroe Islands aimed at off-grid communities.
Eco Wave Power Global AB will officially launch the first U.S. pilot wave energy project at the Port of Los Angeles on September 9, in partnership with AltaSea, an organization specializing in innovative maritime solutions.
The Burundian government officially launches the first phase of the Jiji-Mulembwe hydroelectric complex, a strategic 49.5 MW capacity project aimed at enhancing national energy supply through substantial international financing.
Agilitas Energy purchases two advanced-stage hydroelectric projects in West Virginia and Maryland, marking its entry into hydropower to bolster its capacity on the U.S. power grid.
The Russian company InterRAO anticipates a 4% annual reduction in electricity exports, primarily impacted by a significant decrease in shipments to China due to limited hydroelectric production and rising domestic demand.
The global hydropower plants market is projected to reach USD 318.3 billion by 2032, driven by growing demand for renewable energy, increased adoption of micro-hydropower plants, and heightened government support, according to a recent report.
Port-au-Prince is without electricity after residents of Mirebalais forcibly shut down a hydroelectric plant protesting government inaction amid escalating gang-related violence.
Globeleq acquires a majority stake in Lunsemfwa Hydro Power Company, marking its entry into the Zambian energy market with two hydropower plants and a solar project.

We are making technical adjustments to our item access system.
Temporary display or access problems may occur.
Thank you for your understanding.

Consent Preferences