No cyberattack detected after massive power outage in Spain

The Spanish government confirmed no signs of cyberattack were identified after the 28 April blackout that affected much of the Iberian Peninsula.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

The Spanish government stated that no digital intrusion was detected in the systems of Red Eléctrica Española (REE), the national electricity transmission system operator, following the massive outage on 28 April. This confirmation, delivered by Minister for the Ecological Transition Sara Aagesen during a parliamentary hearing, rules out the hypothesis of a cyberattack being the cause of the event.

Localised technical incidents triggered the event

According to data presented in Parliament, the electricity outage was triggered by two significant oscillations in the power system recorded at 12:03 and 12:19, followed by three successive incidents in the south of the country. These occurred at 12:33 in a substation in Granada, near Badajoz, and in the province of Seville.

The power loss caused by these three incidents is estimated at over 2.2 gigawatts, according to preliminary figures from REE. This failure reportedly led to the automatic disconnection of the entire Iberian Peninsula from the European power grid, cutting electricity supply across Spain and Portugal for several hours.

Technical investigation still underway

Despite confirming the absence of a cyberattack, the government said technical investigations are ongoing to determine the exact causes of the outage. The inquiry commission includes both major Spanish energy companies and independent experts.

Sara Aagesen emphasised that authorities intend to conduct a thorough analysis without rushing to conclusions. She also noted that the two oscillations recorded prior to the incidents have not yet been formally linked to the system failure, though they remain critical elements in the ongoing assessment.

Caution urged against early speculation

Prime Minister Pedro Sánchez had already urged caution the day after the incident, refusing to rule out any hypothesis while the investigation remained active. REE’s Chief Operating Officer, Eduardo Prieto, previously stated that no intrusion had been identified in the operator’s control systems, supporting the latest official declarations.

The government criticised premature statements made by political groups and reiterated the importance of a methodical approach to determining accountability and preventing similar future events. The scale of the blackout, simultaneously affecting two countries, has drawn particular attention within the European energy sector.

Algeria plans to allocate $60 billion to energy projects by 2029, primarily targeting upstream oil and gas, while developing petrochemicals, renewables and unconventional resources.
China set a record for clean technology exports in August, driven by surging sales of electric vehicles and batteries, with more than half of the growth coming from non-OECD markets.
A night-time attack on Belgorod’s power grid left thousands without electricity, according to Russian local authorities, despite partial service restoration the following morning.
The French Academy of Sciences calls for a global ban on solar radiation modification, citing major risks to climate stability and the world economy.
The halt of US federal services disrupts the entire decision-making chain for energy and mining projects, with growing risks of administrative delays and missing critical data.
Facing a potential federal government shutdown, multiple US energy agencies are preparing to suspend services and furlough thousands of employees.
A report reveals the economic impact of renewable energy losses in Chile, indicating that a 1% drop in curtailments could generate $15mn in annual savings.
Faced with growing threats to its infrastructure, Denmark raises its energy alert level in response to a series of unidentified drone flyovers and ongoing geopolitical tensions.
The Prime Minister dismissed rumours of a moratorium on renewables, as the upcoming energy roadmap triggers tensions within the sector.
Kuwait plans to develop 14.05 GW of new power capacity by 2031 to meet growing demand and reduce scheduled outages, driven by extreme temperatures and maintenance delays.
The partnership with the World Bank-funded Pro Energia+ programme aims to expand electricity access in Mozambique by targeting rural communities through a results-based financing mechanism.
The European Commission strengthens ACER’s funding through a new fee structure applied to reporting entities, aimed at supporting increased surveillance of wholesale energy market transactions.
France’s Court of Auditors is urging clarity on EDF’s financing structure, as the public utility confronts a €460bn investment programme through 2040 to support its new nuclear reactor rollout.
The U.S. Department of Energy will return more than $13bn in unspent funds originally allocated to climate initiatives, in line with the Trump administration’s new budget policy.
Under pressure from Washington, the International Energy Agency reintroduces a pro-fossil scenario in its report, marking a shift in its direction amid rising tensions with the Trump administration.
Southeast Asia, facing rapid electricity consumption growth, could tap up to 20 terawatts of solar and wind potential to strengthen energy security.
The President of the Energy Regulatory Commission was elected to the presidency of the Board of Regulators of the Agency for the Cooperation of Energy Regulators for a two-and-a-half-year term.
The Australian government has announced a new climate target backed by a funding plan, while maintaining its position as a major coal exporter, raising questions about its long-term energy strategy.
New 15-year agreement for the exploration of polymetallic sulphides in the Indian Ocean, making India the first country with two licences and the largest allocated perimeter for these deposits.
The Argentine government launches a national and international tender to sell 44% of Nucleo Electrica SA, continuing its policy of economic withdrawal through capital markets.