Post-CfD renewable assets expose investors to increased market risk

The gradual exit from CfD contracts is turning stable assets into infrastructures exposed to higher volatility, challenging expected returns and traditional financing models for the renewable sector.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The expiration of Contracts for Difference (CfD) across Europe is profoundly reshaping the financial profile of renewable assets. These mechanisms, designed to ensure stable revenues for green electricity producers, are giving way to full exposure to wholesale markets, with direct consequences on internal rates of return (IRR) and asset valuation.

End of a secured model and high financial leverage

CfDs enabled the transformation of capital-intensive projects into bankable investments through a contractually guaranteed remuneration over 15 to 20 years. According to simulations published by the Oxford Institute for Energy Studies, a 200 MW solar plant receiving a £65/MWh CfD could support up to 75% debt leverage, while posting an equity IRR above 10%.

However, the shareholder value was heavily back-loaded, with distributions concentrated after the end of the contract. This financial design implicitly relied on long-term stability assumptions for prices and volumes—assumptions now questioned by evolving market fundamentals and regulatory frameworks.

Rising risk as CfDs approach maturity

IRR analyses show that minor negative adjustments of -10% on wholesale prices, combined with a 1% drop in load factor and capture rate, are enough to push equity IRRs below 9%. The P5 – the fifth percentile worst-case scenario – then drops to 4%, or even negative in some simulated price trajectories.

Thirteen years after commissioning, as the CfD nears expiration, IRR distribution widens significantly. At this point, the same asset becomes much riskier without operational changes, due to growing sensitivity of post-CfD cash flows to market volatility.

Impact on financial decisions and secondary operations

Late-stage refinancing or hedging options, such as partial hedges of 30–90% over three rolling years or ten-year refinancing from year 14, can slightly improve the average IRR. However, they increase volatility, with the P5 dropping to -3%, making the structures challenging for lenders.

In this context, legacy holders of these assets—particularly infrastructure funds and highly-leveraged utilities—face difficult trade-offs: selling at a discount, injecting new capital, or restructuring by internalising market risk management.

Reshuffling of investor profiles and resale strategies

The exit of post-CfD assets from traditional portfolios is creating opportunities for new specialised entrants, notably “merchant” funds and trading houses. These actors accept higher volatility in exchange for elevated IRRs, as demonstrated by a year-13 entrant targeting a 12.3% IRR.

At the same time, major industrial buyers—especially data centres and electro-intensive sectors—are increasing their negotiating power in the power purchase agreement (PPA) market, leveraging producers’ need to secure a portion of their revenues over the long term.

Implications for governance and corporate strategy

The changing risk landscape forces companies to revise internal processes. The development of trading desks, redesign of KPIs focused on post-CfD value, and adjustments to remuneration policies are becoming essential. Future profitability depends on active management of the merchant phase.

Moreover, greenfield project backlogs may be affected if shareholders view in-portfolio assets as underperforming. This context could benefit developers with strong balance sheets or “asset-light” strategies less constrained by capital deployment.

Regulatory issues and support scheme stability

CfDs are now mandatory in state aid frameworks under the Climate, Energy and Environmental Aid Guidelines (CEEAG), but their contractual nature has weakened following emergency state interventions, such as the €180/MWh revenue cap and windfall profit taxes.

The combination of regulatory obligation and increased political flexibility creates a hybrid regime where future revenues depend as much on market prices as on unpredictable administrative decisions. In this setting, the perceived risk of regulated renewables is approaching that of highly controlled fossil fuel infrastructure.

Facing a structural electricity surplus, the government commits to releasing a new Multiannual Energy Programme by Christmas, as aligning supply, demand and investments becomes a key industrial and budgetary issue.
A key scientific report by the United Nations Environment Programme failed to gain state approval due to deep divisions over fossil fuels and other sensitive issues.
RTE warns of France’s delay in electrifying energy uses, a key step to limiting fossil fuel imports and supporting its reindustrialisation strategy.
India’s central authority has cancelled 6.3 GW of grid connections for renewable projects since 2022, marking a tightening of regulations and a shift in responsibility back to developers.
The Brazilian government has been instructed to define within two months a plan for the gradual reduction of fossil fuels, supported by a national energy transition fund financed by oil revenues.
The German government may miss the January 2026 deadline to transpose the RED III directive, creating uncertainty over biofuel mandates and disrupting markets.
Italy allocated 82% of the proposed solar and wind capacities in the Fer-X auction, totalling 8.6GW, with competitive purchase prices and a strong concentration of projects in the southern part of the country.
Amid rising public spending, the French government has tasked two experts with reassessing the support scheme for renewable electricity and storage, with proposals expected within three months.
National operator PSE partners with armed forces to protect transformer stations as critical infrastructure faces sabotage linked to foreign interference.
The Norwegian government establishes a commission to anticipate the decline of hydrocarbons and assess economic options for the country in the coming decades.
Kazakhstan plans to allocate 3 GW of wind and solar projects by the end of 2026 through public tenders, with a first 1 GW tranche in 2025, amid efforts to modernise its power system.
Hurricanes Beryl, Helene and Milton accounted for 80% of electricity outages recorded in 2024, marking a ten-year high according to federal data.
The French Energy Regulatory Commission introduces a temporary prudential control on gas and electricity suppliers through a “guichet à blanc” opening in December, pending the transposition of European rules.
The Carney–Smith agreement launches a new pipeline to Asia, removes oil and gas emission caps, and initiates reform of the Pacific north coast tanker ban.
The Canadian government introduces major legislative changes to the Energy Efficiency Act to support its national strategy and adapt to the realities of digital commerce.
Quebec becomes the only Canadian province where a carbon price still applies directly to fuels, as Ottawa eliminated the public-facing carbon tax in April 2025.
New Delhi launches a 72.8 bn INR incentive plan to build a 6,000-tonne domestic capacity for permanent magnets, amid rising Chinese export restrictions on critical components.
The rise of CfDs, PPAs and capacity mechanisms signals a structural shift: markets alone no longer cover 10–30-year financing needs, while spot prices have surged 400% in Europe since 2019.
Germany plans to finalise the €5.8bn ($6.34bn) purchase of a 25.1% stake in TenneT Germany to strengthen its control over critical national power grid infrastructure.
The Ghanaian government is implementing a reform of its energy system focused on increasing the use of local natural gas, aiming to reduce electricity production costs and limit the sector's financial imbalance.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.