France: 100,000 people to be found and trained to support nuclear power

The French nuclear industry must recruit and train 100,000 people over the next ten years to support the revival of the atom. The most sought-after trades will be boiler making (+140%) and civil engineering (+220%).

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The nuclear industry is looking for engineers, boilermakers and welders: the sector has 100,000 people to find and train over the next decade to support the revival of the nuclear industry in France, according to a memorandum submitted to the government on Friday. With at least six EPRs to be built and power plants to be extended, the nuclear industry, which supplied more than 60% of France’s electricity in 2022, is facing huge challenges, both industrial and human.

Announced in February 2022 by Emmanuel Macron after years of procrastination, the relaunch of nuclear power in France is shaping up to be “one of the most important industrial programs for our country since the 1990s,” says Gifen, which brings together the sector’s industrialists, in its report called “Match.” It will therefore be necessary to recruit and train on a massive scale, while the industry is short of manpower and France has not built any reactors since 2002, leaving the sector fallow for years.

The study is to be presented Friday to the Minister of Energy Transition Agnès Pannier-Runacher and her Industry counterpart Roland Lescure, at Tricastin, one of the strongholds of the French nuclear industry, which includes a uranium enrichment site for France and Europe operated by Orano (formerly Areva).

The first observation is that the industry expects to see the volume of work required grow by 25% over the next 10 years, in some 20 operational activity segments. This scope covers in particular the maintenance of the existing nuclear fleet and the construction of the first six EPRs, uranium and waste management activities, the dismantling of old reactors, as well as France’s share of the construction of EDF’s EPRs in Great Britain and India.

In order to carry out these projects, the report confirms a figure already mentioned in recent months: “the foreseeable need” is around 100,000 recruitments over 10 years, for the entire sector which counts 220,000 jobs, including the “core” jobs of operators and their first suppliers, but also second-tier suppliers and support functions (HR, management, sales).

On the front line

In detail, the industry will have to rely on “60,000 full-time equivalent recruitments” in its core businesses, of which “half to meet the renewal of retirements or to other economic sectors,” says the report, which is based on feedback from a hundred companies.

“The bulk of the effort on this growth of employment” will focus in particular on suppliers, and this while “they do not always benefit from the same attractiveness as the large groups”, stressed Olivier Bard, general delegate of Gifen during a presentation to some journalists. “It will be necessary to recruit 2,5 times more than people who leave over the ten years for the suppliers”, he estimated. A total of 20 operational activity segments characteristic of the sector were studied (engineering, civil engineering, testing and control, boiler making-piping-welding, etc.), and their 84 key trades were evaluated to identify needs over 10 years.

The most sought-after jobs? Boilermaking, where recruitment will increase by 140% over 10 years, and even more so in civil engineering (+220%). “We will recruit at all levels, from the pro baccalaureate to engineers,” stressed the Ministry of Energy Transition.

In order to specify these needs, the University of Nuclear Professions will submit its detailed action plan for training and skills to the ministers in early June.

After an initial ramp-up in 2023-2026, an “acceleration” in 2027-2030 “linked in part to the start of construction of new reactors, including the EPR2 in France”, six in number, the activity should reach a plateau in “2031-2033”. However, the needs may be re-evaluated insofar as the forecasts transmitted by the operators “do not yet include certain additional growth factors”, such as the construction of 8 other EPR2 reactors, which are still optional, and the development of new small SMR/AMR type reactors.

South Korea becomes the first country to submit a safeguards technical report to the IAEA for a small modular reactor, setting a precedent for early integration of non-proliferation requirements in nuclear design.
The Environmental Authority criticises the lack of key data on health risks, chemical discharges and construction safety for EDF's two upcoming EPR2 reactors in Seine-Maritime.
Brazil and China have concluded a three-year agreement to secure access to essential radioisotopes for the medical, industrial and scientific sectors, with no financial exchange between the parties.
US-based developer Last Energy will deploy its first domestic microreactor at Texas A&M-RELLIS, marking a strategic step in the advanced modular reactor race.
PGE acquires ZE PAK's stake in the joint venture responsible for developing Poland’s second nuclear site, consolidating a strategic asset within its energy portfolio.
Amazon unveils new visuals of its upcoming nuclear site, marking a key step in its partnership with X-energy to deploy up to 960 MW of modular nuclear capacity in Washington state.
Canadian uranium producer NexGen Energy has completed a A$1bn ($639mn) equity raise split between North American and Australian markets to support the development of its Rook I project.
Tokyo Electric Power Company Holdings is examining the permanent closure of units 1 and 2 at the Kashiwazaki-Kariwa nuclear power plant, the oldest at the site, while continuing efforts to restart unit 6.
The formal expiration of the 2015 nuclear deal with Iran comes as international sanctions have already been reinstated and diplomatic negotiations remain stalled.
Oklo, newcleo and Blykalla partner to develop advanced nuclear fuel infrastructure in the United States, backed by a planned $2bn investment.
enCore Energy has identified three new uranium roll fronts at its Alta Mesa project, with ongoing drilling aimed at defining their extent and accelerating development work.
California-based Radiant will build its first microreactor production facility in Oak Ridge, on a former Manhattan Project site, with production targeted at 50 units per year by 2028.
EDF restarted the Flamanville EPR reactor after repairing non-compliant valves, delaying the target of reaching full power output of 1,620 MW until the end of autumn.
Nano Nuclear and the University of Illinois will begin drilling operations for the KRONOS MMR™ reactor on October 24, marking a key step toward commercialisation of the nuclear project on the Urbana-Champaign campus.
Natura Resources is finalising construction of the MSR-1, an advanced liquid-fuel nuclear reactor, with a planned launch in 2026 on the Abilene Christian University campus.
JPMorganChase commits $10bn in direct investments as part of a $1.5tn plan to boost energy independence and strategic technologies, including next-generation nuclear power.
A roadmap under development aims to establish regulatory and technical foundations for the deployment of small modular reactors, with the goal of strengthening national energy security and attracting private capital.
EDF adjusts its 2025 nuclear production forecast to between 365 and 375 TWh, supported by the performance of its industrial programme START 2025 focused on maintenance efficiency.
The United Nations nuclear agency is urging Ukraine and Russia to establish a local ceasefire to repair damaged power lines at the Zaporizhzhia plant, which remains on alert after losing all external power supply.
Deep Isolation is calling on First Mover States to incorporate radioactive waste management into their joint strategy to ensure the industrial viability of new nuclear reactors.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.