Electricity demand reaches 2,362 MW in Kenya as KenGen focuses on renewables

Kenya registers a historic record in electricity consumption, driven by industrial growth and a strong contribution from geothermal and hydropower plants operated by Kenya Electricity Generating Company PLC.

Share:

Gain full professional access to energynews.pro from 4.90€/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90€/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 €/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99€/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 €/year from the second year.

Electricity consumption in Kenya has reached an unprecedented peak with a record of 2,362.28 megawatts (MW) on the national grid, highlighting the direct impact of industrial dynamism and rapid urbanisation in the country. This level of demand, never seen before, is attributed to the growth of manufacturing output, the expansion of cities and the rise in domestic consumption, according to Kenya Electricity Generating Company PLC (KenGen).

Geothermal and hydropower plants at the forefront
KenGen’s geothermal plants generated 13,678.35 megawatt-hours (MWh) during the period in question, representing 31.85% of the total volume injected into the grid. The company’s hydropower stations supplied 10,915.93 MWh, accounting for 25.42% of the electricity distributed, according to statistics published by the Energy and Petroleum Regulatory Authority (EPRA). Together, these sources covered more than 57% of the country’s daily production, confirming KenGen’s strategic position in the Kenyan energy sector.

Exceptional performance of key dams
The Kiambere power plant stood out by exceeding expectations by 23.31% with a production of 2,908 MWh. Major hydropower sites such as Gitaru, Kamburu, and Masinga also reinforced the electricity supply, despite significant variations in river flows within the cascade system. According to KenGen, the contribution of hydropower remains essential for stabilising energy costs in the country, with hydro being the least expensive source in the national mix.

Need for investment in transmission and energy outlook
Total daily demand reached 42,943.11 MWh, including electricity generated from thermal and wind sources as well as contributions from interconnections with Uganda and Ethiopia. KenGen points out that the stable supply from local resources, mainly geothermal and hydropower, enabled the network to remain stable without reported load shedding.

However, transmission lines such as Muhoroni-Chemosit and Kisumu-Muhoroni exceeded 120% of their capacity, signalling the urgent need for investment in the electricity grid to keep up with national demand growth. KenGen Managing Director Peter Njenga reaffirmed the goal of delivering an additional 1,500 MW over ten years, exclusively from renewable sources.

The Australian government has announced a new climate target backed by a funding plan, while maintaining its position as a major coal exporter, raising questions about its long-term energy strategy.
New 15-year agreement for the exploration of polymetallic sulphides in the Indian Ocean, making India the first country with two licences and the largest allocated perimeter for these deposits.
The Argentine government launches a national and international tender to sell 44% of Nucleo Electrica SA, continuing its policy of economic withdrawal through capital markets.
A report by Rhodium Group anticipates stagnation in US emissions, a result of the political shift favouring fossil fuels since Donald Trump returned to office.
A sudden fault on the national grid cut electricity supply to several regions of Nigeria, reigniting concerns about the stability of the transmission system.
Re-elected president Irfaan Ali announces stricter production-sharing agreements to increase national economic returns.
Coal India issues tenders to develop 5 GW of renewable capacity, split between solar and wind, as part of its long-term energy strategy.
US utilities anticipate a rapid increase in high-intensity loads, targeting 147 GW of new capacity by 2035, with a strategic shift toward deregulated markets.
France opens a national consultation on RTE’s plan to invest €100 billion by 2040 to modernise the high-voltage electricity transmission grid.
Governor Gavin Newsom orders state agencies to fast-track clean energy projects to capture Inflation Reduction Act credits before deadlines expire.
Germany’s energy transition could cost up to €5.4tn ($6.3tn) by 2049, according to the main industry organisation, raising concerns over national competitiveness.
Facing blackouts imposed by the authorities, small businesses in Iran record mounting losses amid drought, fuel shortages and pressure on the national power grid.
Russian group T Plus plans to stabilise its electricity output at 57.6 TWh in 2025, despite a decline recorded in the first half of the year, according to Chief Executive Officer Pavel Snikkars.
In France, the Commission de régulation de l’énergie issues a clarification on ten statements shared over the summer, correcting several figures regarding tariffs, production and investments in the electricity sector.
A group of 85 researchers challenges the scientific validity of the climate report released by the US Department of Energy, citing partial methods and the absence of independent peer review.
Five energy infrastructure projects have been added to the list of cross-border renewable projects, making them eligible for financial support under the CEF Energy programme.
The Tanzanian government launches a national consultation to accelerate the rollout of compressed natural gas, mobilising public and private financing to secure energy supply and lower fuel costs.
The Kuwaiti government has invited three international consortia to submit bids for the first phase of the Al Khairan project, combining power generation and desalination.
Nigeria’s state-owned oil company abandons plans to sell the Port Harcourt refinery and confirms a maintenance programme despite high operating costs.
The publication of the Multiannual Energy Programme decree, awaited for two years, is compromised by internal political tensions, jeopardising strategic investments in nuclear and renewables.

Log in to read this article

You'll also have access to a selection of our best content.