HRS signs new order with Element 2 for a mobile station in Scotland

French manufacturer HRS will supply Element 2 with a mobile HRX14 hydrogen station for Glasgow, marking its fourth installation in the UK and strengthening its position in the British market.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

French hydrogen station designer and manufacturer Hydrogène de France (HRS) has confirmed an order for a mobile HRX14 station from UK-based company Element 2. The new installation, planned for Glasgow, follows a letter of intent signed in July. It will be the first hydrogen refuelling station dedicated to heavy-duty vehicles in Scotland.

A mobile station designed for flexibility

The HRX14 station ordered by Element 2 will feature a refuelling capacity of 14 kg per hour. It is distinguished by its modular design, allowing deployment on-site within ten days. This operational mobility addresses the evolving needs of transport operators, particularly in regions where permanent infrastructure is still under development.

The Scottish order follows a previous project successfully completed in 2024 at Teesside Airport, where an HRS station was installed. The system passed factory acceptance testing in early August, in line with contractual commitments.

Accelerated deployment in the UK

Founded in 2020, Element 2 aims to build a network of 50 hydrogen stations across the UK and Ireland within five years. This plan, called “50 in 5,” seeks to establish infrastructure capable of supporting the growing adoption of hydrogen vehicles, particularly in freight and passenger transport.

The HRX14 station in Glasgow will be the fourth unit deployed by HRS in the UK. The French company is consolidating its international strategy, supported by the technical and operational recognition of its equipment.

A commercial relationship built around modularity

With stations capable of delivering up to one tonne per day already in operation in Europe and the Middle East, HRS is expanding its industrial-scale expertise. A four-tonne-per-day station is currently being manufactured for a European energy company.

According to official statements, the HRX14’s installation flexibility and scalability were decisive in Element 2’s decision. The mobile solution developed in partnership with HRS allows real-world hydrogen vehicle testing while maintaining cost-optimised deployment logic.

Several subsurface stimulation techniques aim to generate hydrogen in situ at low cost. Pilots are advancing, but heterogeneous Technology Readiness Levels (TRL), geological uncertainties, and monitoring requirements are slowing investment.
Viridien takes a strategic stake in Mantle8 to boost natural hydrogen exploration across Europe, the Middle East and Africa by combining geological data and seismic detection technologies.
A partnership between AquaVentus and Hydrogen Scotland aims to connect Scottish offshore wind farms to a cross-border green hydrogen production and export infrastructure in the North Sea.
Electric Hydrogen announces the acquisition of Ambient Fuels and an alliance with Generate Capital to offer up to $400 mn in hydrogen project financing worldwide starting in 2026.
Hynfra PSA strengthens its presence in West Africa with a $1.5bn green ammonia project, backed by the Mauritanian government, with commercial operations expected to start by 2030.
Over 500 hydrogen projects are now under construction or operational worldwide, with total committed investments reaching USD110 billion, representing an increase of USD35 billion in one year.
From 2029, Verso Energy will supply hydrogen produced in Moselle to steel group SHS, supported by a cross-border pipeline and an industrial investment exceeding €100mn.
The success of SGN’s test on a gas pipeline converted to hydrogen confirms Terra Firma Energy’s technological choices, with sites already equipped to accommodate this type of energy investment.
Lhyfe has started supplying Essent with renewable green hydrogen under a multi-year contract, marking a major commercial debut in the Netherlands for the French producer.
The Dutch government grants major funding to RWE to develop an offshore wind-powered electrolysis facility, marking a key step in the OranjeWind project.
ScottishPower pauses its renewable hydrogen projects in the United Kingdom, despite receiving public subsidies, citing a lack of commercial viability under the HAR1 programme.
thyssenkrupp nucera has completed the purchase of key assets from Green Hydrogen Systems, strengthening its position in pressurised alkaline electrolysis for industrial hydrogen production.
GH2 Solar Ltd partners with AHES Ltd to build an electrolyzer plant in Gwalior, targeting 500 MW capacity by 2030 with $19mn government support.
A cooperation agreement, a bilateral carbon-credit mechanism and converging standards lay the ground for India→Japan hydrogen and ammonia flows, with volume targets, price-support schemes and first export projects scaling up.
Hydrogen offtake agreements are multiplying, with Germany and Japan leading, mobilizing producers and industrial buyers in a still nascent but already highly competitive market.
Vema Hydrogen mobilise des experts internationaux pour accélérer la mise sur le marché de son hydrogène minéral, alors que l’entreprise prévoit de forer ses premiers puits pilotes en Amérique du Nord d’ici la fin de l’année.
First Public Hydrogen Authority opens a request for proposals to transport gaseous and liquid hydrogen across California, with a deadline set for September 12.
US-based manufacturer Ohmium unveils a new generation of modular electrolysers integrating all production systems within a reduced footprint, aiming to lower installation and operating costs for green hydrogen.
ABO Energy and Hydropulse join forces to develop decentralised green hydrogen production units in Europe, with Spain and Finland as priority markets.
Next Hydrogen secures two separate loans, including one from its executives, to consolidate liquidity and continue operations while evaluating long-term financial solutions.

Log in to read this article

You'll also have access to a selection of our best content.