Eversource acquire 26 acres to connect renewable energy

Eversource, targets a strategic 26-acre site in Mystic to interconnect renewable energy sources and strengthen the New England power grid.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Eversource, a key energy management player in New England, has finalized the acquisition of a 26-acre parcel on the Mystic property from Constellation Energy. This strategic site is set to become a hub for renewable energy interconnection, offering solutions to the growing challenges of energy transition and grid reliability in the region.

Massachusetts, already a leader in the energy transition, seeks to capitalize on this acquisition by developing infrastructure adapted to various energy sources. The primary goal is to integrate technologies such as onshore and offshore wind energy, hydropower, battery storage, and other low-carbon resources into the existing grid. This initiative aligns with the state’s decarbonization and electrification goals while ensuring continuity of energy service for consumers and major industrial users.

A Strategic Challenge for the Grid

The project also addresses the growing demand for grid optimization in the face of anticipated congestion. The existing infrastructure on the Mystic site offers a unique potential to reduce congestion and improve energy flow management in the region. By working closely with local stakeholders, Massachusetts aims to identify solutions to maximize efficiency and renewable energy integration into the grid.

Eversource is committed to a collaborative approach involving municipal leaders, regulators, and industry experts. One of the identified priorities is to ensure the protection of nearby maritime access, enabling harmonious coexistence between energy development and local usage preservation.

Impact on the Economic and Energy Sectors

In addition to its benefits for the power grid, this project is seen as a driver of economic development in the region. It could provide local employment opportunities, particularly in energy-related technological sectors, and enhance the skills available in the area. Specialized workforce training to support these technological transitions is being considered.

Through this initiative, Massachusetts reaffirms its position as a pioneer in energy transition while addressing regional challenges related to electrification and the growing demand for clean energy. This project also illustrates the increasing efforts of public and private actors to develop innovative solutions to economic, political, and environmental challenges.

The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.