Radioactive waste: the Cigeo project enters a crucial new phase

Management of the most radioactive waste from France's nuclear power plants is advancing apace. The Cigeo project, designed to bury this highly hazardous waste 500 meters underground in the Meuse region of France, has reached a crucial new stage in its development.

Share:

Stockage déchets nucléaires français avance

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The French Nuclear Safety Authority (ASN) and the Institute for Radiation Protection and Nuclear Safety (IRSN) have judged the data provided by the French National Radioactive Waste Management Agency (Andra) to be sufficient to continue investigating the case. This initial positive assessment confirms the soundness of the work Andra has been carrying out for 30 years on this controversial but essential project.
In particular, the experts praised the quality of the geotechnical and hydrogeological analyses carried out on the Bure site in the Meuse region, which was selected as the site for the underground storage facilities following in-depth studies. This instruction follows a decision by the French Constitutional Council in 2023.

Significant progress, but challenges remain

While ASN considers the geotechnical and hydrogeological analyses to be generally satisfactory, the nuclear watchdog stresses the need to take greater account of the potential impact of climate change on above-ground facilities. What’s more, the test program planned for the industrial pilot phase, which is crucial for validating the final technical aspects, has yet to be fully detailed.
IRSN also points to the need for further studies to ensure that Cigeo can effectively accommodate waste from future new-generation nuclear reactors planned by the French government, such as the EPR2. For the time being, only the capacity to store waste from the current fleet and the 6 planned EPR2s has been confirmed.

Timetable takes shape despite challenges

Towards the beginning of 2025, the ASN and IRSN, which will then be merged into a single entity, will give their opinion on Cigeo’s operational safety, a crucial point for the project’s continuation. This new assessment will mark a decisive step forward, enabling Andra to envisage the start of construction work in 2027.
Commissioning of the storage facility for the least radioactive waste (long-lived intermediate-level waste) is scheduled for 2035-2040. On the other hand, the disposal of high-level waste, which is more complex to implement, would not take place until 2080-2090 according to the current schedule.
Despite the major technical challenges still to be met and the protests of some members of civil society, Andra is confident in the measures already taken to ensure maximum safety for this unprecedented project, which is essential for the long-term management of the most dangerous nuclear waste produced in France.

The full-scope simulator for the Lianjiang nuclear project has successfully passed factory acceptance testing, paving the way for its installation at the construction site in China's Guangdong province.
A coalition of Danish industry groups, unions and investors launches a platform in support of modular nuclear power, aiming to develop firm low-carbon capacity to sustain industrial competitiveness.
The United Kingdom and TAE Technologies create a joint venture in Culham to produce neutral beams, a key component of fusion, with strategic backing from Google.
Texas-based developer Natura Resources receives new federal funding to test key components of its 100-megawatt modular reactor in partnership with Oak Ridge National Laboratory.
The Niigata regional assembly is deliberating on restarting unit 6 of the world’s largest nuclear plant, thirteen years after operations ceased following the Fukushima disaster.
Reactor Doel 2 was taken offline, becoming the fifth Belgian reactor to cease operations under the country’s gradual nuclear phase-out policy.
Rolls-Royce SMR has expanded its partnership with ÚJV Řež to accelerate the deployment of small modular reactors, targeting the construction of several units in the Czech Republic and abroad.
The Indian government aims to amend legislation to allow private companies to participate in civil nuclear development, a move positioned as critical to achieving the country’s long-term energy targets.
The VVER-1200 nuclear reactor at Xudabao 4 in China has completed installation of its final passive water tank, marking the end of modular construction for the second phase of the project.
Ottawa and Edmonton commit to a nuclear production roadmap by 2050, through a memorandum of understanding also covering carbon capture and an Indigenous-led pipeline project.
Niamey asserts control over its uranium resources by authorising open market sales of Somaïr’s production, formerly operated by France’s Orano, amid ongoing legal disputes.
Equinix has signed a strategic agreement with French start-up Stellaria to reserve 500 MWe of advanced nuclear capacity to power its future European AI data centres starting in 2035.
Bishkek plans to host a RITM-200N small modular reactor supplied by Rosatom to address electricity shortages and deepen energy ties with Moscow, despite the risks posed by Western sanctions.
The Niigata prefectural assembly will vote on the restart of Unit 6, potentially marking TEPCO’s first reactor relaunch since the 2011 Fukushima disaster.
The Norwegian government has initiated a consultation with neighbouring countries on its modular nuclear power plant project in Aure and Heim, in accordance with the Espoo Convention.
Türkiye and South Korea have signed a memorandum of understanding to jointly explore nuclear power plant projects, marking a strategic step in the long-term development of Türkiye's energy infrastructure.
Asian Development Bank has amended its energy policy to enable funding for civil nuclear projects in developing member countries across the Asia-Pacific region.
First Hydrogen begins research with the University of Alberta to identify molten-salt mixtures simulating nuclear fuels for SMR prototypes.
Framatome has completed the manufacturing of the first nuclear fuel assemblies for the Barakah power plant, marking a key milestone in the supply agreement signed with Emirates Nuclear Energy Company in July.
A government-commissioned report proposes 47 measures to simplify nuclear regulation, reduce decommissioning costs and accelerate delivery of civilian and military projects.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.