France: Bruno Le Maire tempers ambitions for new EPR2 reactors

Bruno Le Maire, French Minister for the Economy and Energy, has expressed reservations about France's ability to build new EPR2 nuclear reactors, stressing the industrial challenges and the need to rebuild the industry.

Share:

France Ambitions Réacteurs Nucléaires EPR2

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Bruno Le Maire has expressed measured caution about France’s ambitions for the construction of EPR2 nuclear reactors to a Senate committee of inquiry. This position marks a reflection on the current and future capabilities of the French nuclear industry, which is being put to the test by far-reaching technical and industrial challenges. Nevertheless, the private sector is investing more in the field, as TotalEnergies has done.

The challenges of rebuilding the nuclear industry

The Minister insisted on the “gigantic scale” of the project represented by the six new EPR2s announced by President Emmanuel Macron in February 2022. He recalled that the industry has gone through tumultuous periods, marked by significant loss of skills and recurrent criticism. This context calls for reconstruction, both in terms of civil engineering and technological aspects.
EDF, a key player in this nuclear revival, recently reached a crucial milestone with the Flamanville EPR reactor, for which fuel loading has just been completed. However, the project is twelve years behind schedule, illustrating the difficulties inherent in such projects.

Limited absorption capacity

Bruno Le Maire pointed out that six EPR2s represent “a reasonable amount of absorption by our nuclear industry”. It made the possibility of building eight additional reactors conditional on EDF demonstrating its ability to complete the first projects on time and on budget. This position tempers our initial ambitions, while leaving the door open to future expansion conditional on convincing results.

Initial preparatory work at Penly

The French government recently gave EDF the go-ahead to start preparatory work on the two future EPR2 reactors at Penly (Seine-Maritime). This decision, formalized by a decree on June 3, marks a concrete step towards achieving the objectives set by Emmanuel Macron. However, the Minister stressed the importance of closely monitoring the progress of these projects to assess the industry’s ability to meet expectations.

Perspectives and reflections

The future of nuclear power in France therefore depends on EDF demonstrating its reliability and efficiency. Bruno Le Maire’s cautious stance reflects a desire to ensure that the projects undertaken are feasible and beneficial for the industry and the country. This pragmatic approach is designed to secure investments and ensure a gradual build-up of skills.
To sum up, the construction of new nuclear reactors in France is a major industrial challenge, requiring a solid rebuilding of the industry and a demonstration of capacity by EDF. Government support is conditional on this proof of success, offering a measured but ambitious outlook for the future of nuclear power in France.

EDF is opening access to its long-term nuclear supply contracts to companies consuming more than 7 GWh per year, an adjustment driven by the gradual end of the Arenh mechanism.
A public-private consortium is developing a 5 MW thermal microreactor designed to operate without refuelling for ten years, marking a strategic step in Brazil's nuclear innovation efforts.
EDF has announced that the Flamanville EPR reactor is now operating at 80% of its capacity. The target of reaching full output by the end of autumn remains confirmed by the utility.
The accelerated approval of the Aurora facility’s nuclear safety plan marks a strategic milestone in rebuilding a domestic nuclear fuel production line in the United States.
The Industrikraft consortium will invest SEK400mn ($42.2mn) to become a shareholder in Videberg Kraft, marking a new phase in Sweden’s nuclear project led by Vattenfall on the Värö Peninsula.
MVM Group has signed an agreement with Westinghouse to secure VVER-440 fuel supplies from 2028, reducing its reliance on Russia and strengthening nuclear cooperation between Budapest and Washington.
The delivery of nuclear fuel by Russian subsidiary TVEL to the Da Lat research reactor marks a key step in strengthening the nuclear commercial partnership between Moscow and Hanoi.
US supplier X-energy has formalised a graphite supply contract with Japan's Toyo Tanso for the construction of its first four small modular reactors, in partnership with Dow and backed by the US Department of Energy.
US-based Enveniam has signed an agreement with LIS Technologies Inc. to oversee the design and construction of a new laser-based uranium enrichment facility on American soil.
Faced with shorter approval timelines, several European nuclear firms, including Newcleo, Orano and Urenco, are considering relocating key industrial investments to the United States.
A consortium led by Swedish giants such as ABB, SSAB and Volvo will invest SEK400mn to support the development of small modular nuclear reactors through a strategic partnership with Vattenfall.
Russia and India are preparing an expanded agreement for the construction of VVER-1200 reactors and modular nuclear power plants, while accelerating work at the strategic Kudankulam site.
Fusion Fuel Cycles has begun work on its UNITY-2 facility, a unique test bench designed to validate the full tritium fuel cycle under fusion conditions, marking a key step toward fusion energy.
Framatome will produce TRISO fuel at Romans-sur-Isère as part of a pilot project for advanced nuclear reactors, in partnership with actors such as Blue Capsule Technology.
Sweden’s parliament has approved a major reform authorising uranium extraction, opening the door to a reassessment of the economic potential of mining projects containing this strategic mineral.
South Africa's regulator has authorised Koeberg Unit 2 to operate until 2045 following maintenance work and a long-term safety assessment.
French nuclear group Orano has confirmed the release of its representative in Niger, detained since May, as tensions remain high with the country’s junta over control of uranium assets.
EDF launches a sovereign digital platform to secure data exchanges between nuclear stakeholders, aiming to accelerate the construction of future EPR2 reactors.
ONE Nuclear Energy publishes a virtual presentation for investors detailing its industrial vision, ahead of its merger with Hennessy Capital Investment Corp. VII expected in the first half of 2026.
A majority of Americans now back nuclear energy, with strong approval for converting coal plants into nuclear sites and increasing public investment in sector technologies.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.