Erex and ENEOS cancel 300MW biomass project in Niigata

Erex will end the environmental assessment of a 300MW biomass project developed with ENEOS in Niigata due to rising costs and a weaker yen.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Japanese biomass power producer Erex will officially terminate the environmental impact assessment of its planned 300MW power plant in Seiro, Niigata Prefecture, on November 26. The decision ends a joint development with ENEOS Corporation, initiated in 2020 on a former golf course site owned by ENEOS.

The project was expected to generate around 2 terawatt-hours annually, primarily using sorghum imported from Vietnam and the Philippines. It was designed to operate outside Japan’s Feed-in-Tariff (FIT) scheme, with construction initially set to begin in 2023 and commissioning planned for fiscal year 2026. However, the need for additional environmental analyses had already delayed construction to FY2026 and commercial operations to FY2029.

Rising construction costs and currency pressure

Since its announcement, the project has faced a marked increase in construction costs. These were further exacerbated by the depreciation of the yen against the US dollar, raising operating expenses for assets dependent on imported biomass fuel. The yen has lost more than 40% of its value since 2020, falling from around 105 to nearly 150 yen per dollar, significantly increasing the cost of foreign-sourced biomass.

Data from the Ministry of the Environment indicates that both companies have opted not to continue the regulatory process required for plant construction. The cancellation was confirmed before any construction permit was granted.

Strategic adjustment in Erex’s biomass portfolio

Erex currently holds a biomass portfolio of 493MW, including six operational plants ranging from 49MW to 149MW. This includes a 20MW facility in Shikoku that remains under long-term shutdown. The withdrawal from the Niigata project may lead to a reallocation of resources to other assets or new developments less exposed to foreign exchange volatility.

No public statements were issued by the companies involved, but the cancellation occurs amid broader reassessments of biomass generation strategies in Japan, particularly for projects operating outside the FIT scheme.

Haffner Energy presents the H6 generation, a biomass‑hydrogen system positioned as competitive against electrolysis, as the company seeks new investors amid financial pressure and a regulatory landscape focused on RFNBO.
Haffner Energy signs its first contract in the United States with OroCarbo to supply two SYNOCA® modules for an integrated biomethanol project scheduled for 2028 in California's Central Valley.
Argentina increased regulated prices for ethanol and biodiesel used in mandatory blending, directly impacting the local industry and domestic fuel market.
80 Mile PLC has completed the full acquisition of Ferrandina in Italy and signed three memorandums of understanding with major energy groups, securing the supply and processing of 120,000 tonnes of biofuels per year.
Fonds Bioénergie acquires a stake in Keridis BioEnergy to accelerate renewable natural gas production from agricultural and food residues across Québec.
The United States recorded a limited 3% increase in its annual biofuels production capacity in 2024, hindered by declining margins and the closure of several facilities.
Enilive aligns conversions in Italy, hubs in Asia and U.S. diversification, with rising HVO margins, integrated pretreatment and HVO/SAF offtakes tied to European requirements, supporting volumes, site utilization and operational guidance.
The Ille-et-Vilaine Departmental Energy Syndicate awarded ENGIE Solutions a €9.5mn ($10.01mn) contract to operate a 4.9 km heating network, scheduled for commissioning in 2027.
Vermont’s energy regulator authorises final review of a 2.2 MW project led by Clean Energy Technologies to convert agricultural waste into renewable electricity.
The increase in Brazil’s biodiesel blend mandate to 15% has reignited calls for stronger regulatory supervision as prices climb and budget constraints limit enforcement.
Waga Energy strengthens its presence in Brazil, betting on a rapidly structuring market where biomethane benefits from an incentive-based regulatory framework and strong industrial investment prospects.
John Cockerill and Axens launch NesaBTF, an industrial torrefaction technology designed to optimise biomass supply, with targeted ambitions in the growing sustainable aviation fuel market.
A R550mn grant enables Johannesburg to launch a waste-to-energy project with a 28 MW capacity under a 25-year public-private partnership model.
ENGIE signs a 15-year agreement with CVE Biogaz for the purchase of biomethane produced in Ludres, under the Biogas Production Certificates mechanism, marking a structuring step for the sector's development in France.
The first phase of a green methanol project in Inner Mongolia has successfully completed biomass gasifier technical tests, marking a key milestone in Goldwind's industrial deployment.
Eni begins the transformation of its Priolo complex in Sicily with a 500,000-tonne biorefinery and a chemical plastic recycling plant, based on its proprietary Hoop® technology.
Waga Energy has launched a biomethane production unit in Davenport, Iowa, in partnership with the Scott County Waste Commission and Linwood Mining and Minerals, with an annual capacity exceeding 60 GWh.
German group Uniper has entered into a long-term supply deal with Five Bioenergy for biomethane produced in Spain, with deliveries scheduled to begin in 2027.
Hanoi is preparing a tax relief plan for biofuel producers to support domestic ethanol output ahead of the E10 mandate rollout planned for 2026.
Lesaffre and ENGIE Solutions have inaugurated a waste heat recovery unit in Marcq-en-Barœul, covering 70% of the site's thermal needs through two industrial heat pumps.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.