First Hydrokinetic Network Scale Converter Deployed in the U.S.

Ocean Energy USA LLC installs a grid-scale hydrokinetic converter at the US Navy test site in Hawaii, marking a major breakthrough in marine energy technologies.

Share:

OE-35 présenté avec le drapeau américains et irlandais

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Ocean Energy USA LLC, a subsidiary of Ocean Energy Group Ireland, announces the successful deployment of its OE-35 hydrokinetic converter in Kaneohe Bay, Hawaii.
The device, with a potential capacity of 1.25 megawatts, represents a significant advance in marine renewable energy.
The OE-35, weighing 826 tonnes and measuring 38 x 18 meters, is installed at the US Navy’s Wave Energy Test Site (WETS) on the windward coast of the island of Oahu.
Following on-site testing and commissioning, the device will be connected to the Hawaiian power grid via an undersea cable in the coming weeks.
It should make an effective contribution to the development of renewable energies in Hawaii.

Background and Financing

The project, valued at 12 million USD, is co-financed by the Office of Energy Efficiency and Renewable Energy of the US Department of Energy and the Sustainable Energy Authority of Ireland (SEAI).
This initiative is part of a cooperation agreement between the US and Irish governments to develop marine hydrokinetic technologies.
The WETS test site, located north of the Mōkapu peninsula, was chosen for its strategic relevance and ideal marine conditions.
The OE-35 was towed from Honolulu to its current location on July 19, marking a crucial milestone in the project.

Technology and Innovation

The OE-35 hydrokinetic converter is designed to transform wave energy into electricity, offering an innovative solution for renewable energy production.
With a production capacity of up to 1.25 megawatts, the device could make a significant contribution to reducing carbon emissions.
Tony Lewis, Ocean Energy’s Technical Director, explains that this project is the result of over fifteen years of design, testing and construction.
The world-class OE-35 device aims to provide a viable and sustainable solution for generating electricity from wave energy.

Perspectives and implications

The successful deployment of the OE-35 paves the way for a new era in marine renewable energy.
By connecting this device to the Hawaiian power grid, Ocean Energy USA LLC is demonstrating the viability and effectiveness of this technology for large-scale use.
It also demonstrates international cooperation in the field of renewable energy, with substantial support from the US and Irish governments.
The results achieved at Kaneohe Bay could serve as a model for similar projects around the world, reinforcing the global commitment to clean energy.
The OE-35 project could also have significant economic implications, creating new opportunities in the shipbuilding, maintenance and marine infrastructure management sectors.
This could stimulate innovation and encourage investment in similar technologies.
The successful installation of the OE-35 by Ocean Energy USA LLC marks a decisive step in the exploitation of hydrokinetic energy.
This project, supported by strong international cooperation, could revolutionize the global energy landscape by providing a sustainable and efficient solution for power generation.

The Cameroonian government plans to build ten low-capacity hydropower plants over the next five years as part of a national programme to strengthen energy infrastructure across the country.
Energyminer begins installation of 124 floating generators on the Rhine in St. Goar, marking the first official permit for a large-scale hydrokinetic park in Germany.
Swedish ocean energy developer Minesto joined a high-level trade mission to South Korea to explore new cooperation opportunities in marine energy.
The Tokyo Bureau of Transportation is seeking a new electricity retailer for the output of its three hydropower plants, with a portion resold to power the city’s transport infrastructure.
Qatar’s sovereign wealth fund has raised its stake to approximately 15% in ISAGEN, one of Colombia’s leading power producers, through a $535mn investment alongside Brookfield.
New Delhi plans to allocate INR6.4tn ($77bn) to develop transmission infrastructure for 76 GW of electricity from the Brahmaputra Basin by 2047, amid growing cross-border pressures.
Moscow strengthens industrial joint ventures with Tajikistan by leveraging hydropower, agriculture, and mining in a strategy based on mutual interest and economic complementarity.
Gabon has signed a memorandum of understanding with Italy’s Todini to develop two hydropower plants in Booué and Tsengué-Lélédi, with an estimated value of $1.78 billion to address electricity shortages.
Le groupe Axian renforce son portefeuille énergétique avec le projet de barrage de Volobe à Madagascar, une initiative estimée à $670mn visant à étendre l’accès à l’électricité dans un pays en proie à de fortes tensions sociales.
Nagano Prefecture has commissioned a new 1.5MW hydropower plant to supply Seiko Epson’s Ina facility under a sleeved power purchase agreement managed by Chubu Electric Power Miraiz.
The Senate's economic affairs committee recommends including the reform of the legal framework for dams in the upcoming energy bill to avoid competitive tendering, following a principle agreement between Paris and Brussels.
The Canadian government is investing nearly CAD17mn ($12.4mn) to support two hydroelectric initiatives led by Indigenous communities in Quebec, aiming to reduce diesel dependency in remote regions.
Federal funding targets FORCE’s PICO platform and an Acadia study on fish–turbine collision risks, aiming to reduce regulatory uncertainty and accelerate industrial adoption in the Bay of Fundy.
The Norwegian operator plans to install a third turbine to capture part of today’s bypassed floodwater without changing the flow on the salmon stretch; commissioning would be at the earliest in 2030. —
Norway’s Statkraft continues its exit from the Indian market with the sale of its Tidong hydropower project to JSW Energy, which strengthens its asset portfolio in Himachal Pradesh.
Eco Wave Power and BladeRanger have unveiled a first-of-its-kind drone-powered maintenance system for onshore wave energy infrastructure, aimed at reducing operational costs and improving system performance.
A TEHA-Enel report highlights that 86% of Italy's hydropower concessions are expiring, threatening key investments and the country's energy security.
Hull Street Energy has signed an agreement to acquire thirteen hydroelectric dams from Consumers Energy, totalling 132 MW, further consolidating its position in the North American hydro sector.
The Grand Ethiopian Renaissance Dam is now fully operational, with a planned capacity of 5,150 MW, marking a key step in the country’s energy deployment.
Sweden's Minesto begins a SEK25mn ($2.26mn) tidal microgrid project in the Faroe Islands, targeting integration with local applications such as electric vehicle charging and industrial processes.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.