Texas Secures $190 Million Energy Storage Project Led by Aypa Power

Aypa Power finalizes $190 million in funding for the Bypass Battery Energy Storage System project in Fort Bend County, aiming to strengthen Texas's energy capacity and address the region’s growing electricity demand.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Aypa Power, backed by Blackstone, has secured $190 million in funding for its Bypass Battery Energy Storage System (BESS) project in Fort Bend County, Texas. With a planned capacity of 200 MW/400 MWh, this infrastructure is designed to meet the region’s increasing energy needs while bolstering the resilience of the grid managed by the Electric Reliability Council of Texas (ERCOT).

An Innovative Financial Structure

The funding includes a $68 million Construction-to-Term Loan and a $91 million Tax Equity Bridge Loan (TEBL), providing a robust foundation for the construction phase. Additionally, $31 million in letters of credit have been issued, with $26 million earmarked for specific project requirements. Morgan Stanley Renewables Inc. contributed $94 million through a hybrid partnership flip structure.

Key financial institutions, including SMBC, Santander, and Siemens Financial Services, played central roles as coordinators and lead agents. This collaboration underscores the financial sector’s capacity to support large-scale critical infrastructure projects.

Economic and Strategic Impact

The Bypass BESS project will deliver significant economic benefits to Fort Bend County, creating hundreds of jobs during the construction phase and generating approximately $20 million in tax revenue over its operational lifespan. Strategically, it aligns with the growing electrification efforts in the United States and strengthens regional energy independence.

The project also stands out as one of the first within ERCOT to secure a long-term supply agreement, offering financial stability and greater visibility on future revenue streams.

Outlook for the Sector

The Texas energy storage market continues to expand rapidly, driven by initiatives like the Bypass BESS project. By integrating large-scale storage solutions, Texas aims to balance renewable energy production fluctuations and meet growing electricity demand.

The financial and strategic lessons from this project could serve as a model for similar initiatives across the United States, highlighting the importance of robust partnerships between developers and financial institutions.

Ameresco has completed a 50 MW battery storage system to support Nucor’s expansion in Arizona, marking one of the largest behind-the-meter industrial projects in the United States.
SUNOTEC expands in the Bulgarian market with seven projects combining battery and solar, totalling 763 MWh of storage and 115 MWp of photovoltaic capacity.
Danish fund Copenhagen Infrastructure IV transfers half of its stake in the UK-based Coalburn 2 project to AIP Management, strengthening AIP's energy storage portfolio in the United Kingdom.
Lyten has completed the acquisition of the Northvolt Dwa site in Poland, Europe’s largest energy storage system factory, and plans to deliver its first commercial units before the end of 2025.
SNG Holdings launched trial operations of a 2MW/6MWh energy storage facility in Gotemba, backed by Digital Grid and PHOTON, ahead of commercial commissioning scheduled for November.
The Winchester project will combine 160 MW of storage with two 80 MW solar plants in Cochise County, with delivery expected in early 2027.
Greenflash Infrastructure has acquired a 200 MW standalone storage project in Texas, marking a strategic asset transfer aimed at reinforcing local grid reliability.
Gotion High-Tech presented in Saudi Arabia a modular 20 MWh storage solution aimed at strengthening the country's energy capacity under its Vision 2030 strategy.
The Japanese developer has commissioned a storage unit in Karatsu and plans to deploy 80 facilities by the end of 2026, relying on agreements with local governments and industrial partners.
Energy Plug, Malahat Battery Technology and Quantum eMotion sign strategic agreement to develop quantum-secured energy storage systems, including a NATO-aligned defence initiative.
Greenflash Infrastructure has finalised the acquisition of Rock Rose, a 200 MW energy storage project located in Fort Bend County, to strengthen its ERCOT market portfolio.
SALA Energy commissions its first grid-scale battery storage facility using sodium-sulfur batteries, supported by both public and private financing.
Utility-scale battery storage system costs continue to fall across Asia-Pacific, but the pace of reductions is expected to slow significantly by 2029, according to Wood Mackenzie projections.
StarCharge has secured a 500MWh energy storage order through a strategic agreement with ENERGY INVESTMENT LLC, strengthening its position in rapidly evolving Eastern European markets.
The Vilvoorde site in Belgium now hosts 400 MWh of operational capacity on a total 800 MWh project, marking a key milestone for electricity storage on the continent.
Idemitsu Kosan has commissioned a 15MW/48MWh energy storage facility in Himeji, marking the start of its deployment in grid-scale storage with Japanese public funding.
The Australian government awarded contracts to 20 renewable and storage projects, surpassing the initial 6GW goal under the fourth round of the Capacity Investment Scheme.
The Padua Complex will deliver 400 MW/1.8 GWh capacity with Tesla's support, at a strategic node of the Texas grid, following legislative action to strengthen energy reliability.
Salt River Project will partner with ESS to install a 50 MWh long-duration energy storage system in Pinal County as part of its capacity expansion plan to meet rising demand.
GoldenPeaks Capital and Envision have signed a memorandum of understanding to deploy up to 1 GWh of next-generation battery energy storage systems across several European markets.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.