EDF inaugurates two solar power plants in Moselle totalling 72 MWp installed

EDF power solutions commissions two new photovoltaic plants in Moselle, together representing a capacity of 72 MWp, capable of annually supplying electricity equivalent to 36,000 inhabitants, or 30% of the population of Metz.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

EDF power solutions has announced the commissioning of two photovoltaic plants located on the Concerted Development Zones (Zones d’Aménagement Concerté – ZAC) of Illange-Bertrange and Farébersviller, in the Moselle department. These new infrastructures, with a total capacity of 72 megawatt-peak (MWp), will generate energy production equivalent to the annual electricity consumption of approximately 36,000 people. The Illange-Bertrange facility is now the largest solar power plant operated by EDF power solutions in Moselle, with a capacity of 60 MWp spread over 40 hectares. The Farébersviller solar plant has a capacity of 12 MWp covering 10 hectares.

A project initiated in consultation with local authorities

Both photovoltaic projects, initiated in 2018, resulted from a collaboration between EDF power solutions, the Departmental Council of Moselle (Conseil Départemental de la Moselle), and the municipalities involved. Building permits were filed in 2019 and subsequently obtained in 2021 and 2022. During construction phases, approximately 200 workers were mobilised and local companies were actively involved in the projects. The construction schedule was specifically adapted to avoid ecologically sensitive periods.

Early consideration given to biodiversity

EDF power solutions emphasises that it collaborated closely with independent research consultancies to integrate biodiversity protection into the projects’ initial design. At the Farébersviller plant, a four-hectare area was deliberately preserved to protect three local protected species: the Large Copper butterfly (Cuivré des marais), the Northern Lapwing bird (Vanneau huppé), and the Geometrid moth (Phalène zonée). At Illange-Bertrange, a one-hectare area was excluded from the installation site specifically to support the development of the Large Copper butterfly.

A reinforced presence in the Grand Est region

The Farébersviller and Illange-Bertrange photovoltaic plants began injecting their low-carbon electricity production into the grid at the end of 2024 and beginning of 2025 respectively. EDF power solutions now operates seven solar power plants in the Grand Est region, with a cumulative capacity of approximately 240 MWp. The company also manages 27 terrestrial wind farms with an installed capacity of 453 MW. These installations are managed by four regional centres dedicated to wind and solar maintenance.

Damien Leveque, Director of Operations, Maintenance, and Asset Management at EDF power solutions, said at the announcement: “This is the result of close collaboration between the region and EDF power solutions to develop renewable energy projects that will enable the Grand Est region to become a positive-energy and low-carbon territory by 2050.”

The Tilley Solar project, led by Indigenous and private partners, has reached full commissioning, adding 23.6 MW to Alberta's power grid and marking an economic milestone for Alexander First Nation.
Waaree Solar Americas will supply next-generation bifacial modules to Sabancı Renewables for two utility-scale solar plants in Texas, strengthening its presence in the North American market.
A court in Illinois has dismissed a lawsuit filed against ECA Solar, removing legal barriers to the construction of a planned solar facility outside the city limits of Morris.
EDF power solutions acquires a 20% stake in Obelisk, a 1.1GW hybrid solar and storage project in Egypt led by Scatec and Norfund, marking a new milestone in its regional strategy.
Mitsubishi HC Capital Energy and Ecokaku will develop 10 MW of non-subsidised solar power plants annually in Japan, targeting direct contracts with industrial buyers through long-term power purchase agreements.
Canadian company NU E Power plans to fund the development of its solar projects in Lethbridge and feasibility studies in Mongolia, Malaysia, and Africa through a $1.8mn private placement.
Citicore Renewable Energy Corporation signed a PHP3.975bn ($71mn) project finance loan with Bank of the Philippine Islands to accelerate the completion of its 113MW solar power plant in Pangasinan province.
U.S. clean energy capacity growth hits quarterly record, but industry players raise concerns over a slowing market amid regulatory instability.
Norwegian producer Scatec launches commercial operation of its 273 MW solar plant in Western Cape under a 20-year power purchase agreement.
Scatec has signed two shareholder agreements for its 1.1GW hybrid project in Egypt, reducing its economic interest while retaining operational control.
The French subsidiary of Solarwatt has filed for court-ordered restructuring, hit by reduced public subsidies and a downturn in the residential solar segment.
Zelestra sells its Latin American platform to Promigas, including 1.4 GW of operational or under-construction assets and 2.1 GW of advanced-stage projects in Chile, Peru and Colombia.
Over 140 solar sector companies have urged Congress to lift a directive from the Department of the Interior blocking permit approvals, putting hundreds of energy projects in the United States at risk.
Un terminal portuaire en Espagne alliera réfrigération industrielle haute performance et production solaire pour optimiser les coûts énergétiques et les capacités logistiques de PTP Ibérica, avec un démarrage prévu d’ici mi-2026.
Toshiba’s subsidiary commits to acquiring non-fossil certificates from a floating solar power plant operated by OTS in Japan, under a virtual power purchase agreement coordinated by Digital Grid.
Terra-Gen has closed $383.3mn in financing for the construction of its Lockhart III and IV solar units, adding 205 MW to California’s grid with commercial operations expected in 2026.
US developer Ecoplexus has closed a $300mn financing deal with KKR and SMBC to support over 13GW of solar and storage projects under development across the country.
EDP will supply 30% of Carrefour Polska’s energy needs through a PPA combining solar and wind, marking a step forward in the development of renewable capacity in Poland.
French public funding will support the construction of ten solar power plants with storage in Mauritania, as the country works to expand its grid to reach universal electricity access by 2030.
Recurrent Energy has received authorisation to develop Tillbridge, a hybrid 1.3 GW solar and battery project in England, strengthening its expansion strategy in the UK market.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.