Ameresco opens a biomethane unit at Lee County landfill with Republic Services

Ameresco commissions a biomethane facility in Lee County, processing 4,500 cubic feet of landfill gas per minute, and directly injects this renewable gas into the transmission network to reduce emissions and strengthen energy security.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Ameresco has announced the commercial start-up of a new renewable natural gas (RNG) production unit at the Lee County landfill site in Illinois, developed in partnership with Republic Services. This commissioning marks the fifteenth such installation jointly developed by the two groups, amid sustained growth in renewable gas projects in the United States.

Direct injection of biomethane into the network

The new facility processes 4,500 standard cubic feet per minute of landfill gas, converting biogas, previously flared, into biomethane injected into the transmission network. Injection into the pipeline began at the end of June 2025, thus making it possible to replace part of the fossil gas with a resource derived from local organic waste.

Environmental targets and local investment

The project aims for an annual reduction of over 61,000 tonnes of carbon dioxide emissions, equivalent to more than 70 mn gallons of gasoline or 1.5 mn barrels of oil not consumed. These results support the energy targets set by the State of Illinois, which aims for 40% renewable energy by 2030 and carbon neutrality in the sector by 2050. Republic Services also plans to recover more than half of the biogas at all its sites by 2030.

The creation of the Lee County unit also brings direct investment to the region and contributes to the security of local energy supply. The renewable gas market is expanding rapidly in the United States, with an increasing number of organic waste recovery sites driven by industrial partnerships.

Marketing of renewable gas and market outlook

The biomethane produced by the Lee County facility is fully purchased by U.S. Energy, which then supplies it to customers looking to reduce their carbon footprint, particularly in transport and industry. This trend responds to growing demand for alternative fuels and more resilient energy solutions amid changing market conditions.

Renewable natural gas projects are gaining ground in energy transition strategies, supported by regulatory frameworks and public emission targets. The sector is seeing the development of partnerships between industrial operators, public stakeholders and fuel distributors, reinforcing the structure of the sector in the United States.

Veolia launches a major project in Pozna aiming to fully replace coal with low-carbon local energy sources in district heating, with a first phase already operational showing 92% efficiency.
Veolia connects its Lapouyade site to RTE's secondary reserve using instant modulation technology, paving the way for rollout across 25 sites.
Erex will end the environmental assessment of a 300MW biomass project developed with ENEOS in Niigata due to rising costs and a weaker yen.
California-based start-up Erg Bio has closed a $6.5mn seed round to industrialise its Aspire™ technology, backed by Azolla Ventures, Chevron Technology Ventures, and Freeflow.
Haffner Energy presents the H6 generation, a biomass‑hydrogen system positioned as competitive against electrolysis, as the company seeks new investors amid financial pressure and a regulatory landscape focused on RFNBO.
Haffner Energy signs its first contract in the United States with OroCarbo to supply two SYNOCA® modules for an integrated biomethanol project scheduled for 2028 in California's Central Valley.
Argentina increased regulated prices for ethanol and biodiesel used in mandatory blending, directly impacting the local industry and domestic fuel market.
80 Mile PLC has completed the full acquisition of Ferrandina in Italy and signed three memorandums of understanding with major energy groups, securing the supply and processing of 120,000 tonnes of biofuels per year.
Fonds Bioénergie acquires a stake in Keridis BioEnergy to accelerate renewable natural gas production from agricultural and food residues across Québec.
The United States recorded a limited 3% increase in its annual biofuels production capacity in 2024, hindered by declining margins and the closure of several facilities.
Enilive aligns conversions in Italy, hubs in Asia and U.S. diversification, with rising HVO margins, integrated pretreatment and HVO/SAF offtakes tied to European requirements, supporting volumes, site utilization and operational guidance.
The Ille-et-Vilaine Departmental Energy Syndicate awarded ENGIE Solutions a €9.5mn ($10.01mn) contract to operate a 4.9 km heating network, scheduled for commissioning in 2027.
Vermont’s energy regulator authorises final review of a 2.2 MW project led by Clean Energy Technologies to convert agricultural waste into renewable electricity.
The increase in Brazil’s biodiesel blend mandate to 15% has reignited calls for stronger regulatory supervision as prices climb and budget constraints limit enforcement.
Waga Energy strengthens its presence in Brazil, betting on a rapidly structuring market where biomethane benefits from an incentive-based regulatory framework and strong industrial investment prospects.
John Cockerill and Axens launch NesaBTF, an industrial torrefaction technology designed to optimise biomass supply, with targeted ambitions in the growing sustainable aviation fuel market.
A R550mn grant enables Johannesburg to launch a waste-to-energy project with a 28 MW capacity under a 25-year public-private partnership model.
ENGIE signs a 15-year agreement with CVE Biogaz for the purchase of biomethane produced in Ludres, under the Biogas Production Certificates mechanism, marking a structuring step for the sector's development in France.
The first phase of a green methanol project in Inner Mongolia has successfully completed biomass gasifier technical tests, marking a key milestone in Goldwind's industrial deployment.
Eni begins the transformation of its Priolo complex in Sicily with a 500,000-tonne biorefinery and a chemical plastic recycling plant, based on its proprietary Hoop® technology.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.