ADNOC Gas Cancels Das Island Expansion Project

ADNOC Gas has suspended the expansion project of Das Island LNG, redirecting its investments towards other strategic initiatives. This decision comes as part of its strategy to increase production capacity and meet the growing global LNG demand.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

ADNOC Gas officially announced the suspension of expansion operations at its Das Island LNG export facility. This decision marks a significant turning point in the company’s plans to modernize and expand its natural gas liquefaction capabilities. The project, known as LNG 2.0, aimed to electrify LNG trains to reduce greenhouse gas (GHG) emissions and increase the production of ethane and LNG.

The LNG 2.0 project also included efforts to debottleneck LNG trains and increase ethane extraction and export. The goal was to add 1.2 million metric tons per annum of ethane, 0.9 million metric tons per annum of LNG, and 1.1 million metric tons per annum of C3+ by 2028. Despite these ambitions, ADNOC Gas decided not to proceed with the project at this stage.

Strategic Reorientation of ADNOC Gas

ADNOC Gas, a subsidiary of the state-owned Abu Dhabi National Oil Company (ADNOC), emphasized that it will continue to invest in Das Island, recognizing its strategic importance in its LNG portfolio. This reorientation allows the company to focus on other priority projects while maintaining essential operations at Das Island. The decision is part of a broader strategy to increase the company’s production capacity by 30% over the next five years and expand its LNG capacity by 8.3% by 2028.

The Das Island site, operational since 1977, is one of the world’s oldest LNG facilities, ranking third in terms of overall longevity. With a liquefaction capacity of 6 million metric tons per annum (MMtpa), Das Island plays a crucial role in the United Arab Emirates’ LNG exports. The suspension of the LNG 2.0 project does not compromise current operations but indicates a shift in investment priorities.

New Initiatives and Future Projects

In June 2024, ADNOC Gas announced the final investment decision (FID) for the Ruwais LNG project, a two-train, 9.6 MMtpa liquefaction facility located in Ruwais, Abu Dhabi emirate. This project is currently under construction and is expected to begin production by late 2028. ADNOC Gas plans for this new addition to complement its existing portfolio and meet the growing global LNG demand.

ADNOC Gas has also allocated 40% minority stakes in the Ruwais LNG project to BP, Mitsui, Shell, and TotalEnergies, with each receiving a 10% stake while ADNOC retains a 60% majority stake. ADNOC maintains a majority stake to strengthen its strategic partnerships with these major energy companies. These partnerships are essential for securing the long-term offtake agreements necessary for the project’s viability.

Offtake Agreements and Market Outlook

By July 2024, ADNOC signed 70% of the required offtake agreements for the Ruwais LNG project, with additional announcements expected. These agreements include heads of agreements with Shell and Mitsui for 1 MMtpa and 0.6 MMtpa, respectively. Additionally, agreements are underway with Germany’s EnBW and SEFE and China’s ENN. These agreements already total 4.2 MMtpa, approximately 44% of the project’s total capacity, leaving 2.5 MMtpa to be secured to meet production targets.

Analysis by Commodity Insights in August 2024 suggests that ADNOC Gas has signed additional undisclosed agreements, bringing the total offtake contracts to 5.7 MMtpa. This advance on sales targets strengthens ADNOC Gas’s position in the global LNG market and illustrates its ability to attract leading partners to support its ambitious projects.

Impact on the LNG Market and UAE Strategy

The suspension of the LNG 2.0 project and the focus on initiatives such as the Ruwais project demonstrate ADNOC Gas’s commitment to adapting its strategy based on the dynamics of the global LNG market. The emphasis on increasing production capacity and expanding existing facilities reflects the United Arab Emirates’ determination to reinforce its position as a global leader in the LNG sector.

By aiming for energy self-sufficiency by 2030, the UAE is heavily investing in projects that not only increase its LNG export capacity but also improve the efficiency and sustainability of its energy operations. These efforts are essential to meet the growing energy demand while minimizing the carbon footprint of liquefaction and export activities.

The Iraqi government and Kurdish authorities have launched an investigation into the drone attack targeting the Khor Mor gas field, which halted production and caused widespread electricity outages.
PetroChina internalises three major gas storage sites through two joint ventures with PipeChina, representing 11 Gm³ of capacity, in a CNY40.02bn ($5.43bn) deal consolidating control over its domestic gas network.
The European Union is facilitating the use of force majeure to exit Russian gas contracts by 2028, a risky strategy for companies still bound by strict legal clauses.
Amid an expected LNG surplus from 2026, investors are reallocating positions toward the EU carbon market, betting on tighter supply and a bullish price trajectory.
Axiom Oil and Gas is suing Tidewater Midstream for $110mn over a gas handling dispute tied to a property for sale in the Brazeau region, with bids due this week.
Tokyo Gas has signed a 20-year agreement with US-based Venture Global to purchase one million tonnes per year of liquefied natural gas starting in 2030, reinforcing energy flows between Japan and the United States.
Venture Global accuses Shell of deliberately harming its operations over three years amid a conflict over spot market liquefied natural gas sales outside long-term contracts.
TotalEnergies ends operations of its Le Havre floating LNG terminal, installed after the 2022 energy crisis, due to its complete inactivity since August 2024.
Golar LNG has completed a $1.2bn refinancing for its floating LNG unit Gimi, securing extended financing terms and releasing net liquidity to strengthen its position in the liquefied natural gas market.
Woodside Energy and East Timor have reached an agreement to assess the commercial viability of a 5 million-tonne liquefied natural gas project from the Greater Sunrise field, with first exports targeted between 2032 and 2035.
In California, electricity production from natural gas is falling as solar continues to rise, especially between noon and 5 p.m., according to 2025 data from local grid authorities.
NextDecade has launched the pre-filing procedure to expand Rio Grande LNG with a sixth train, leveraging a political and commercial context favourable to US liquefied natural gas exports.
Condor Energies has completed drilling its first horizontal well in Uzbekistan, supported by two recompletions that increased daily production to 11,844 barrels of oil equivalent.
WhiteWater expands the Eiger Express pipeline in Texas, boosting its transport capacity to 3.7 billion cubic feet per day following new long-term contractual commitments.
The challenge to permits granted for the NESE project revives tensions between gas supply imperatives and regulatory consistency, as legal risks mount for regulators and developers.
Brasilia is preparing a regulatory overhaul of the LPG sector to break down entry barriers in a market dominated by Petrobras and four major distributors, as the Gás do Povo social programme intensifies pressure on prices.
The lifting of force majeure on the Rovuma LNG project puts Mozambique back on the global liquefied natural gas map, with a targeted capacity of 18 Mt/year and a narrowing strategic window to secure financing.
BW Energy has identified liquid hydrocarbons at the Kudu gas field in Namibia, altering the nature of the project initially designed for electricity production from dry gas.
Rising oil production in 2024 boosted associated natural gas to 18.5 billion cubic feet per day, driven by increased activity in the Permian region.
Sonatrach has concluded a new partnership with TotalEnergies, including a liquefied natural gas supply contract through 2025, amid a strategic shift in energy flows towards Europe.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.