NextDecade secures $6.7bn funding for fifth LNG train in Texas

NextDecade confirmed a final investment decision for Train 5 at Rio Grande LNG, backed by full $6.7bn funding, marking its second decision in a month.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

NextDecade Corporation announced it has reached a positive Final Investment Decision (FID) for Train 5 of its Rio Grande LNG project, located in South Texas. This decision comes just one month after a previous FID, strengthening progress on the liquefied natural gas terminal. At the same time, the company completed the financial close required for the construction of the train and related infrastructure.

Bechtel awarded EPC contract as capacity expands

Engineering firm Bechtel Energy Inc. received full notice to proceed under a lump-sum, turnkey Engineering, Procurement and Construction (EPC) contract. Train 5 is expected to add 6 million tonnes per annum (MTPA) of liquefied natural gas (LNG) production capacity, bringing the total capacity under construction at the site to 30 MTPA. The target date for the first commercial delivery under Train 5 LNG Sale and Purchase Agreements (SPAs) is set for the first half of 2031.

The project is underpinned by 20-year SPAs with JERA, EQT Corporation and ConocoPhillips, covering 4.5 MTPA. These contracts provide long-term commercial visibility for Train 5 operations.

Financial structure and investment breakdown

Total project cost is expected to reach approximately $6.7bn, including EPC costs, owner’s costs, contingencies, financing fees and interest during construction. Financing comprises a $3.59bn term loan at the Rio Grande LNG Train 5, LLC level, $0.50bn in private placement notes, and $2.58bn in equity commitments split evenly between NextDecade and its financial partners.

These partners include Global Infrastructure Partners (part of BlackRock), GIC, and Mubadala Investment Company. The financial investors are entitled to a preferred return, after which NextDecade’s economic interest in Train 5 will increase from 50% to 70%.

Equity financing structure preserves share dilution

NextDecade stated its $1.29bn equity contribution to Train 5 will not materially dilute its outstanding common shares. The company allocated $233mn in cash and raised $1.33bn in term loans, divided between a $729mn delayed draw facility with a variable rate, and a $600mn subordinated loan at a fixed 13% interest rate, with interest payable in kind until one year after Train 5’s completion.

All financing commitments for Train 5 have been executed, with provisions allowing for early repayment without penalty. The structure supports immediate commencement of works and aligns with the project’s timeline.

Turkmenistan is leveraging the Global Gas Centre to build commercial links in Europe and South Asia, as it responds to its current dependence on China and a shifting post-Russian gas market.
The Marmara Ereğlisi liquefied natural gas (LNG) terminal operated by BOTAŞ is increasing its regasification capacity, consolidating Türkiye’s role as a regional player in gas redistribution toward the Balkans and Southeast Europe.
Budapest contests the European agreement to ban Russian natural gas imports by 2027, claiming the measure is incompatible with its economic interests and the European Union's founding treaties.
The European Union has enshrined in law a complete ban on Russian gas by 2027, forcing utilities, operators, traders and states to restructure contracts, physical flows and supply strategies under strict regulatory pressure.
The partial exploitation of associated gas from the Badila field by Perenco supplies electricity to Moundou, highlighting the logistical and financial challenges of gas development in Chad.
A new regulation requires gas companies to declare the origin, volume and duration of their contracts, as the EU prepares to end Russian imports.
Saudi Aramco has launched production at the unconventional Jafurah gas field, initiating an investment plan exceeding $100bn to substitute domestic crude and increase exportable flows under OPEC+ constraints.
By mobilising long-term contracts with BP and new infrastructure, PLN is driving Indonesia’s shift toward prioritising domestic LNG use, at the centre of a state-backed investment programme supported by international lenders.
TotalEnergies, TES and three Japanese companies will develop an industrial-scale e-gas facility in the United States, targeting 250 MW capacity and 75,000 tonnes of annual output by 2030.
Argentinian consortium Southern Energy will supply up to two million tonnes of LNG per year to Germany’s Sefe, marking the first South American alliance for the European importer.
The UK government has ended its financial support for TotalEnergies' liquefied natural gas project in Mozambique, citing increased risks and a lack of national interest in continuing its involvement.
Faced with a climate- and geopolitically-constrained winter, Beijing announces expected record demand for electricity and gas, placing coal, LNG and UHV grids at the centre of a national energy stress test.
The Iraqi government and Kurdish authorities have launched an investigation into the drone attack targeting the Khor Mor gas field, which halted production and caused widespread electricity outages.
PetroChina internalises three major gas storage sites through two joint ventures with PipeChina, representing 11 Gm³ of capacity, in a CNY40.02bn ($5.43bn) deal consolidating control over its domestic gas network.
The European Union is facilitating the use of force majeure to exit Russian gas contracts by 2028, a risky strategy for companies still bound by strict legal clauses.
Amid an expected LNG surplus from 2026, investors are reallocating positions toward the EU carbon market, betting on tighter supply and a bullish price trajectory.
Axiom Oil and Gas is suing Tidewater Midstream for $110mn over a gas handling dispute tied to a property for sale in the Brazeau region, with bids due this week.
Tokyo Gas has signed a 20-year agreement with US-based Venture Global to purchase one million tonnes per year of liquefied natural gas starting in 2030, reinforcing energy flows between Japan and the United States.
Venture Global accuses Shell of deliberately harming its operations over three years amid a conflict over spot market liquefied natural gas sales outside long-term contracts.
TotalEnergies ends operations of its Le Havre floating LNG terminal, installed after the 2022 energy crisis, due to its complete inactivity since August 2024.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.