The final shipment of vitrified nuclear waste between France and Germany has reached Philippsburg. This transfer concludes recycling contracts signed since 1977 with four German operators.
The final shipment of vitrified nuclear waste between France and Germany has reached Philippsburg. This transfer concludes recycling contracts signed since 1977 with four German operators.
EnBW wins seven solar farm projects totalling 184 MW in the Bundesnetzagentur's open call for tenders, strengthening its position in the German solar market.
EnBW wins seven solar farm projects totalling 184 MW in the Bundesnetzagentur's open call for tenders, strengthening its position in the German solar market.
EnBW completes installation of the 64 foundations for the He Dreiht wind farm, marking a major step forward in this 960 MW project in the North Sea, planned to power 1.1 million homes by the end of 2025.
EnBW completes installation of the 64 foundations for the He Dreiht wind farm, marking a major step forward in this 960 MW project in the North Sea, planned to power 1.1 million homes by the end of 2025.