Russia says it has arrested Ukrainian “saboteurs” who were targeting nuclear plants

Ukrainian "saboteurs" were planning attacks on Russian nuclear power plants, but were arrested by Russian security services with seized explosives.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The Russian security services (FSB) claimed on Thursday to have arrested “saboteurs” linked to the Ukrainian secret services who were planning attacks to disrupt the operation of Russian nuclear power plants.

“A sabotage group of the Ukrainian Foreign Intelligence Service (…) attempted to blow up about 30 power lines of the nuclear power plants in Leningrad and Kalinin” in the northwest of the country in early May, the FSB said in a statement. “According to the idea of the Ukrainian special services, this was to lead to the shutdown of nuclear reactors, disrupt the normal operation of nuclear power plants and cause significant damage to the economy and reputation of Russia,” the same source said.

The saboteurs “managed to blow up the pylon of a high-voltage line and to lay mines at the foot of four other high-voltage lines of the Leningrad nuclear power plant”, located in the eponymous region, about thirty kilometers from St. Petersburg, the FSB said. Explosive devices were also planted near seven towers of high-voltage lines connected to the Kalinin power plant, he continued.

Two “Ukrainian citizens, Alexander Maystruk, born in 1978 (…), and Eduard Usatenko, born in 1974” have been arrested in connection with these attacks and face up to 20 years in prison, the statement said. A search was launched for a third man, Yuri Kishchak, a Russian-Ukrainian born in 1963, according to the same source. “Two Russian accomplices of the saboteurs have also been identified and arrested,” according to the FSB, which accuses them in particular of having provided means of communication and vehicles with false license plates.

The Russian special services also seized 36.5 kilos of explosives and about 60 detonators from the “saboteurs”, according to the statement. An investigation for “sabotage” and “trafficking in explosives” has been opened.

In early May, just days before the celebrations of “Victory Day” over Nazi Germany in Russia, the country was rocked by a series of attacks and sabotage, including the derailment of two freight trains and a fire in an oil depot caused by a drone attack. The Russian authorities also reported in early May that a high-voltage line had been damaged in the Leningrad region, without providing details at the time.

NextEra Energy has lifted its earnings estimates for 2025 and 2026, supported by power demand linked to long‑term contracts previously signed with Google and Meta to supply their artificial intelligence data centres with low‑carbon electricity.
London launches a complete regulatory overhaul of its nuclear industry to shorten authorisation timelines, expand eligible sites, and lower construction and financing costs.
Finland's Ministry of Economic Affairs extends the deadline to June 2026 for the regulator to complete its review of the operating licence for the Olkiluoto spent nuclear fuel repository.
Framatome will replace several digital control systems at the Columbia plant in the United States under a contract awarded by Energy Northwest.
The conditional green light from the nuclear regulator moves Cigéo into its final regulatory stage, while shifting the risks towards financing, territorial negotiations and industrial execution.
The drone strike confirmed by the IAEA on the Chernobyl site vault exposes Ukraine to a nuclear risk under armed conflict, forcing the EBRD to finance partial restoration while industry standards must now account for drone threats.
Deep Fission is installing a 15 MWe pressurised reactor 1.6 km underground at Great Plains Industrial Park, under the Department of Energy’s accelerated pilot programme, targeting criticality by July 4, 2026.
EDF commits to supply 33 MW of nuclear electricity to Verkor over 12 years, enabling the battery manufacturer to stabilise energy costs ahead of launching its first Gigafactory.
The full-scope simulator for the Lianjiang nuclear project has successfully passed factory acceptance testing, paving the way for its installation at the construction site in China's Guangdong province.
A coalition of Danish industry groups, unions and investors launches a platform in support of modular nuclear power, aiming to develop firm low-carbon capacity to sustain industrial competitiveness.
The United Kingdom and TAE Technologies create a joint venture in Culham to produce neutral beams, a key component of fusion, with strategic backing from Google.
Texas-based developer Natura Resources receives new federal funding to test key components of its 100-megawatt modular reactor in partnership with Oak Ridge National Laboratory.
The Niigata regional assembly is deliberating on restarting unit 6 of the world’s largest nuclear plant, thirteen years after operations ceased following the Fukushima disaster.
Reactor Doel 2 was taken offline, becoming the fifth Belgian reactor to cease operations under the country’s gradual nuclear phase-out policy.
Rolls-Royce SMR has expanded its partnership with ÚJV Řež to accelerate the deployment of small modular reactors, targeting the construction of several units in the Czech Republic and abroad.
The Indian government aims to amend legislation to allow private companies to participate in civil nuclear development, a move positioned as critical to achieving the country’s long-term energy targets.
The VVER-1200 nuclear reactor at Xudabao 4 in China has completed installation of its final passive water tank, marking the end of modular construction for the second phase of the project.
Ottawa and Edmonton commit to a nuclear production roadmap by 2050, through a memorandum of understanding also covering carbon capture and an Indigenous-led pipeline project.
Niamey asserts control over its uranium resources by authorising open market sales of Somaïr’s production, formerly operated by France’s Orano, amid ongoing legal disputes.
Equinix has signed a strategic agreement with French start-up Stellaria to reserve 500 MWe of advanced nuclear capacity to power its future European AI data centres starting in 2035.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.