The offshore wind sector is on course to exceed 520 GW of installed capacity by 2040, despite logistical challenges, with a strong concentration in Europe thanks to floating wind.
The offshore wind sector is on course to exceed 520 GW of installed capacity by 2040, despite logistical challenges, with a strong concentration in Europe thanks to floating wind.
AlphaReal has completed construction of a 13.5 MW wind farm on a former landfill site in Rigmuir, Scotland, strengthening its portfolio of renewable assets.
AlphaReal has completed construction of a 13.5 MW wind farm on a former landfill site in Rigmuir, Scotland, strengthening its portfolio of renewable assets.
An international study shows that only integrated strategies combining taxes, regulations and incentives can effectively reduce global greenhouse gas emissions.
An international study shows that only integrated strategies combining taxes, regulations and incentives can effectively reduce global greenhouse gas emissions.
BP returns to Iraq after five years, signing a preliminary agreement with the government to restart production from the Kirkuk fields via a profit-sharing model.
BP returns to Iraq after five years, signing a preliminary agreement with the government to restart production from the Kirkuk fields via a profit-sharing model.
SPIE, through its subsidiary Correll, signs two framework contracts with Vattenfall for the maintenance of high-voltage submarine cables for its offshore wind farms in Europe, confirming its key role in energy infrastructure.
SPIE, through its subsidiary Correll, signs two framework contracts with Vattenfall for the maintenance of high-voltage submarine cables for its offshore wind farms in Europe, confirming its key role in energy infrastructure.
BP returns to Iraq after five years, signing a preliminary agreement with the government to restart production from the Kirkuk fields via a profit-sharing model.
BP returns to Iraq after five years, signing a preliminary agreement with the government to restart production from the Kirkuk fields via a profit-sharing model.
Boralex secures $95 million for Témiscouata II, a strategic wind farm in Québec, thanks to a financing package developed by Desjardins that includes ESG criteria.
Boralex secures $95 million for Témiscouata II, a strategic wind farm in Québec, thanks to a financing package developed by Desjardins that includes ESG criteria.