ISDN acquires 51% of PT Funda to expand its hydropower assets in Indonesia

ISDN Holdings strengthens its position in Indonesia by acquiring a majority stake in PT Funda, integrating hydropower capabilities across the entire project lifecycle and consolidating its renewable energy investments.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

ISDN Holdings Limited, a Singapore-based company active in industrial automation and renewable energy, has completed the acquisition of 51% of Indonesian company PT Funda Konstruksi Engineering. The transaction amounts to IDR 25.5 billion, or approximately SGD 2 million. This investment allows ISDN to broaden its operational coverage across the full lifecycle of hydropower projects, from engineering to operations.

Founded in February 2024, PT Funda operates in engineering, procurement, and construction (EPC), as well as in operations and maintenance (O&M) services. The company is led by a team of engineers with over twenty years of experience in hydropower project execution. Their portfolio includes the design and completion of more than 70 projects across Asia, totaling an installed capacity of 4,500 megawatts.

Access to a strategic project pipeline
In the Indonesian market, the PT Funda team has been active since 2014, having delivered four grid-connected projects totaling 57 megawatts, including the Lau Biang 1 plant, also operated by ISDN. Prior to the acquisition, PT Funda had already been appointed as the EPC contractor for the Lau Biang 3 project. The company currently holds a pipeline of more than ten projects in various stages of preparation, representing over 300 megawatts in projected capacity.

This strategic equity stake provides ISDN with direct access to upcoming projects while integrating critical technical expertise into its energy development roadmap. The aim is to strengthen local capabilities and capture value across all infrastructure development stages.

A regulatory environment conducive to investment
The deal comes amid an acceleration of Indonesia’s energy policy. The national master plan, Rencana Umum Penyediaan Tenaga Listrik (RUPTL) 2025–2034, outlines plans to add 42.6 gigawatts of renewable capacity and 10.3 gigawatts of storage by 2034. Hydropower accounts for 27.5% of this projected capacity expansion, making it the country’s second-largest priority energy source.

These projections create a favorable environment for operators capable of rapidly deploying capital and delivering integrated technical solutions. By internalizing the capabilities of a player like PT Funda, ISDN seeks to accelerate project rollout while improving cost and timeline control in infrastructure execution.

Strengthening the integrated investment model
Integrating PT Funda enables ISDN to adopt an operational model more oriented toward long-term financial stability. Maintenance and operations services are expected to generate recurring revenues, reducing exposure to fluctuations linked to the construction phase alone. This hybrid model—combining development, construction, and operation—aligns with market expectations for more predictable returns.

This investment marks a step forward in ISDN’s expansion strategy in Indonesia, which represents a key market within its energy portfolio. By consolidating its local assets and securing internalized engineering capacity, the company aims to sustain growth in a segment experiencing strong demand momentum.

The Norwegian operator plans to install a third turbine to capture part of today’s bypassed floodwater without changing the flow on the salmon stretch; commissioning would be at the earliest in 2030. —
Norway’s Statkraft continues its exit from the Indian market with the sale of its Tidong hydropower project to JSW Energy, which strengthens its asset portfolio in Himachal Pradesh.
Eco Wave Power and BladeRanger have unveiled a first-of-its-kind drone-powered maintenance system for onshore wave energy infrastructure, aimed at reducing operational costs and improving system performance.
A TEHA-Enel report highlights that 86% of Italy's hydropower concessions are expiring, threatening key investments and the country's energy security.
Hull Street Energy has signed an agreement to acquire thirteen hydroelectric dams from Consumers Energy, totalling 132 MW, further consolidating its position in the North American hydro sector.
The Grand Ethiopian Renaissance Dam is now fully operational, with a planned capacity of 5,150 MW, marking a key step in the country’s energy deployment.
Sweden's Minesto begins a SEK25mn ($2.26mn) tidal microgrid project in the Faroe Islands, targeting integration with local applications such as electric vehicle charging and industrial processes.
The Grand Renaissance Dam, set to be inaugurated in September, aims to produce 5,000 megawatts and could generate up to $1 billion per year for Ethiopia, according to the government.
A principle agreement between Paris and Brussels opens the way to reforming the legal framework of hydroelectric concessions in France, ending a deadlock that lasted over ten years.
Swedish company Eco Wave Power has completed testing of its technology at the Port of Los Angeles, reaching a tangible milestone with the launch of its floaters to generate electricity from waves.
Georgia Power continues technical upgrades at several hydroelectric plants in Georgia, with approval from the public regulator, to ensure the reliability of the state’s electricity grid.
A landmark auction in Brazil allocates 815 MW to medium-sized hydroelectric plants, with grid injection scheduled from 2030.
The Port of Suao becomes the first site in Taiwan open to commercial testing of wave energy production, following the allocation of Lot C to I-KE International Ocean Energy Co., partner of Eco Wave Power.
With active projects across four continents and strong liquidity, Eco Wave Power accelerates its expansion strategy while absorbing a rise in operational costs in H1 2025.
Eco Wave Power has completed the full installation of its wave energy system at the Port of Los Angeles, paving the way for initial operational tests scheduled for September.
A 60-gigawatt hydropower dam under construction in Tibet will increase national capacity by 16%, with an estimated cost of $167bn supported by a new state entity.
Eco Wave Power has completed the installation of floaters for its pilot project in Los Angeles, marking a strategic milestone in the validation and commercialisation of its wave energy technology in the US market.
Brookfield Renewable announces an investment of up to $1 billion to increase its stake in the Colombian energy company Isagen to 38%. Qatar Investment Authority (QIA) is also co-investing to raise its stake to 15%.
Beijing has launched the construction of a colossal dam on the Yarlung Tsangpo, with $167.1bn in public investment, drawing attention from New Delhi and downstream states.
Brookfield and Google formalise an unprecedented framework agreement to supply up to 3,000 MW of hydropower, with initial contracts worth more than $3 billion for facilities in Pennsylvania.

Log in to read this article

You'll also have access to a selection of our best content.

[wc_register_modal]