EBRD finances wind power in Uzbekistan

The EBRD is arranging $74 million in financing for the development of the Zarafshan wind farm in Uzbekistan.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

EBRD provided an asset-based loan and a revolving credit facility to a wind farm project in Uzbekistan, the Zarafshan Wind Farm. The EBRD-funded project would avoid the equivalent of 757,000 tons of carbon dioxide emissions per year. It is investing in the largest wind power program in Central Asia.

Future Energy Company PSJC, a holding company indirectly owned by the Abu Dhabi government, owns Zarafshan Limited Liability Company.

EBRD announces innovative large-scale funding

The total funding amounts to $74 million. The EBRD will lend $42 million while the Dutch Entrepreneurial Development Bank will finance $10 million.

Parallel loans will be provided by the International Finance Corporation (IFC), the Asian Development Bank (ADB) and the Japan International Cooperation Agency (JICA). Natixis, First Abu Dhabi Bank (FAB) and Etihad Credit Insurance (ECI) will also finance the transaction.

In addition, the EBRD will implement a $22 million revolving credit facility guaranteed by Madsar, Abu Dhabi’s renewable energy development company.

State-of-the-art technologies

The EBRD-funded project will result in the testing of innovative wind energy technologies. A high-resolution aerial camera system assisted by artificial intelligence will help protect endangered species.

The EBRD is thus contributing to the first deployment of Identiflight technology in Central Asia. The program will monitor and detect birds near the turbines. The system will automatically stop the turbines if there is a risk of collision.

Uzbekistan’s energy transition

The EBRD’s investment comes amidst the reform of the energy sector since 2017. The Central Asian country intends to increase its energy security and diversify its energy mix. The use of investments from private sector actors is one of the levers mobilized for a significant development of the renewable energy sector.

Uzbekistan plans to reach 12 GW of solar and wind power capacity by 2030. This wind power project of a unique scale in Central Asia is, consequently, a priority of the Uzbek authorities. To date, EBRD has invested nearly $3.5 billion in 111 projects in Uzbekistan.

Alerion Clean Power enters the Irish market through the acquisition of an onshore wind farm in County Tipperary, as part of its 2025–2028 industrial plan.
Driven by China's acceleration, global wind capacity is expected to reach 170 GW in 2025, paving the way for a doubling of installed capacity by 2032.
Ocean Winds reaches a new milestone with the installation of the first foundation at the Dieppe – Le Tréport offshore wind farm, which will comprise 62 turbines supplying nearly 850,000 people.
Pennavel and BrestPort strengthen their partnership around the South Brittany floating wind project, aiming to structure industrial operations from 2030 at the EMR terminal of the port of Brest.
Van Oord has completed the installation of 109 inter-array cables at the Sofia offshore wind farm, marking a major logistical milestone for this North Sea energy infrastructure project.
Italian producer ERG will supply 1.2 TWh of energy to Rete Ferroviaria Italiana starting in October, marking a step forward in structuring the national PPA market.
The Chinese turbine manufacturer has signed a strategic agreement with Mensis Enerji to develop an initial 4.5 GW wind power portfolio in Turkey, strengthening its position in a fast-growing regional market.
The Trump administration plans to revoke federal approval of the New England Wind project, jeopardising offshore wind contracts representing 2,600 MW of capacity off the northeastern US coast.
Orsted and two U.S. states have taken federal legal action to contest the abrupt halt of the Revolution Wind project, a $5 billion offshore venture now at risk of prolonged suspension.
SPIE Wind Connect will carry out subsea connections for phase II of the TPC project, a major development in Taiwan’s offshore wind sector with a projected annual capacity of 1,000 GWh.
Envision Energy launches its first project in Turkey in partnership with Yildizlar Group, adding 232 MW to the national wind capacity in Karaman province.
ABO Energy maintains its annual targets despite a drop in half-year profit, relying on cost-cutting measures and early project sales to secure cash flow.
Energiekontor has closed financing for two wind projects in Verden, with a combined 94 MW, with construction starting this year and commissioning scheduled for 2027.
South Korea has rejected all projects using foreign turbines in its 2025 offshore wind auction, marking a strategic shift in favour of local industry and energy security.
The Danish Energy Agency confirmed the rejection of 37 feasibility study permit applications, citing European Union state aid rules and lack of competition.
With an AUD$3 billion investment, ACEN launches one of Tasmania’s largest private projects, aiming for commissioning in 2030 and annual supply for 500,000 households.
In France, a 12.9 MW wind farm financed by local actors has been commissioned in Martigné-Ferchaud, showcasing an unprecedented model of shared governance between citizens, local authorities and public investment companies.
The governors of five states urged the Trump administration to maintain permits for threatened offshore wind projects, citing massive investments and jobs at stake in a nascent industry.
Green Wind Renewables is developing a 450 MW wind farm in the Wheatbelt region of Australia, with up to 75 turbines and an estimated annual output of 1.5 TWh.
German group RWE has commissioned five new power plants in France, adding 83 MW to its portfolio, following repeated successes in tenders organised by the Energy Regulatory Commission.

Log in to read this article

You'll also have access to a selection of our best content.