Cordelio Power starts operations at 135 MW wind farm in Arkansas with Microsoft

Cordelio Power has launched commercial operations of the Crossover wind farm in Arkansas, securing a 20-year power purchase agreement with Microsoft and closing $811mn in financing from North American banks.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Energy developer Cordelio Power has announced the commercial operation of the 135-megawatt (MW) Crossover wind farm located in Cross County, Arkansas. This is the first utility-scale wind project to become operational in the state. The project represents a strategic milestone for Cordelio, which aims to expand its presence in the central United States energy market.

A power purchase agreement signed with Microsoft

All electricity generated by Crossover will be sold to Microsoft Corporation under a 20-year power purchase agreement. This contract provides long-term financial visibility for the developer. In addition, the project will generate estimated annual payments of $950,000 to Cross County and over $50mn to local landowners over the life of the site.

The project was built by U.S.-based M.A. Mortenson under a turnkey engineering, procurement and construction contract. The turbines were supplied by Danish manufacturer Vestas Wind Systems, with the V163-4.5 MW model assembled in the United States. Vestas will also be responsible for long-term maintenance under a service agreement.

Financing structured by major North American banks

Project financing was structured with a $375mn construction loan and a $173mn term loan. These loans were provided by Sumitomo Mitsui Banking Corporation (SMBC), Crédit Agricole Corporate and Investment Bank, National Bank of Canada, Royal Bank of Canada, and Bank of Montreal.

In parallel, U.S. Bank contributed equity through a $263mn tax equity investment. The transaction was carried out by U.S. Bancorp Impact Finance, the bank’s environmental impact investment arm.

The project was originally developed by Steelhead Americas, the North American development arm of Vestas, and acquired by Cordelio Power in late 2023. Legal matters related to the acquisition were advised by the law firm Latham & Watkins.

Regional deployment and economic implications

The project marks progress in deploying energy infrastructure in a state previously absent from the U.S. wind energy map. Cordelio stated that Crossover is a step toward additional developments in Arkansas, though no detailed timeline was provided.

According to the published data, the Crossover site will also contribute to local job creation, although the exact number of positions resulting from the site’s operation was not disclosed.

The Kagurayama onshore wind farm (61.1 MW) begins operations under a secured 2017 FIT tariff, despite grid injection limits and a multi-stakeholder local governance model.
The Trump administration has ordered the immediate halt of five major offshore wind construction sites in the Atlantic, citing national security threats and drawing mixed reactions from industry and political circles.
Policy reversals, reduced performance and corporate disengagement marked an unprecedented slowdown in wind power in 2025, although China continued its expansion at a steady pace.
The Québec government has approved three wind projects totalling 792 MW to meet growing energy demand and support regional economies in Bas-Saint-Laurent and Capitale-Nationale.
French group ENGIE has officially commissioned the Serra do Assuruá complex in the State of Bahia, making it its largest onshore wind project worldwide.
RWE signed a 15-year power purchase agreement with Indiana Michigan Power for the Prairie Creek project, aimed at supporting Indiana’s growing electricity demand starting in 2028.
EDP has signed a long-term electricity supply agreement with Energa for a 322 MW hybrid portfolio combining wind and solar, marking one of the largest contracts of its kind in Poland.
Ocean Winds has deployed a LiDAR buoy off Gippsland to collect accurate data on wind and currents, a key step in its 1.3 GW offshore wind project in Australia.
A consortium led by EDF power solutions has signed a 20-year agreement with Nama PWP to develop a 120 MW wind farm in southeastern Oman, with commissioning scheduled for Q3 2027.
Casa dos Ventos awards Vestas the supply, construction and maintenance of a 184-turbine complex in the state of Piauí, with an investment exceeding $1.01bn.
Warsaw tests long-term support for offshore wind with a structured tender to maximise competition, reduce financial risk and reassure a supply chain under pressure across Europe.
TotalEnergies has sold 50% of a portfolio of wind and solar projects in Greece to Asterion Industrial Partners, valued at €508mn ($554mn), while retaining operational control and the main share of electricity marketing.
Italy’s offshore wind rollout remains at a standstill, freezing over 18 GW of pending projects and weakening national renewable energy targets.
German manufacturer Nordex has secured an order for 34 turbines for a 200 MW project in the Canadian province of New Brunswick, marking its first entry into this region.
OX2 has started construction on three new onshore wind farms in Finland, bringing its total installed capacity in the country to 750 MW, a record level for a private energy sector player.
Italian group Enel has acquired two onshore wind farms in Germany for an enterprise value of €80mn ($86.5mn), strengthening its presence in a stable and strategic market as part of a targeted asset transfer.
EDF power solutions announces commercial operation of the San Kraal wind farm, the first unit of the 420MW Koruson 1 project, with full commissioning expected in early 2026.
Q ENERGY has announced the entry of three local and citizen-based partners into the capital of the Ventajou wind farm, marking its first strategic equity opening to institutional and community investors.
The Norwegian government has allocated two areas of the Utsira Nord project to the Equinor–Vårgrønn and EDF–Deep Wind Offshore consortia, launching a preparatory phase before a competitive state aid auction.
German group RWE has replaced 27 old turbines with three new high-performance units at its Muel wind farm, doubling energy output and earning ZeroWaste certification.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.