Saudi Aramco invests $25 billion in production expansion

Saudi Aramco announces $25 billion in contracts to boost gas production, aiming for a 60% increase in sales by 2030.

Share:

Expansion production gaz Saudi Aramco

Subscribe for unlimited access to all energy sector news.

Over 150 multisector articles and analyses every week.

Your 1st year at 99 $*

then 199 $/year

*renews at 199$/year, cancel anytime before renewal.

Saudi Aramco has awarded contracts totaling $25 billion to expand its natural gas production, responding to the expected increase in energy demand in Saudi Arabia. These contracts cover key projects in the unconventional Jafurah gas field, and are aimed at boosting production capacity to meet national targets. The sale of a large number of shares to foreign investors has undoubtedly encouraged these new investments.
Phase two of the Jafurah development has received sixteen contracts worth $12.4 billion. This field, rich in 229 trillion cubic feet of crude gas and 75 billion barrels of condensate, is central to Saudi Aramco‘s expansion strategy. At the same time, fifteen contracts worth $8.8 billion were signed for phase three of the expansion of the company’s master gas system, which distributes gas to customers across the country.

Increased infrastructure and capacity

Projects include the addition of 23 drilling rigs for $2.4 billion and two directional drilling contracts totalling $612 million. Thirteen well connection contracts at Jafurah, worth $1.63 billion, have also been awarded between December 2022 and May 2024. These developments are designed to increase Saudi Aramco’s gas production capacity, adding significant volumes of ethane, natural gas liquids (NGL) and condensate.
The Jafurah project is scheduled to start up in the third quarter of 2025, with a total investment of over $100 billion, targeting sales of 2 billion cubic feet per day (Bcf/d) by 2030. Saudi Aramco expects to increase its gas sales by at least 60% by 2030, compared with the 2021 baseline.

Compression and fractionation projects

The contracts cover the construction of gas compression facilities and associated pipelines, as well as the expansion of the Jafurah gas plant with gas processing trains, utilities, sulfur and export facilities. They also include the construction of new natural gas liquids fractionation facilities from Riyas to Jubail, with fractionation trains, storage and export services to process NGL received from Jafurah.
Saudi Aramco CEO Amin Nasser said these contract awards show the company’s confidence in the future of gas as an important energy source and vital raw material for downstream industries. The projects are expected to increase the company’s capacity by 3.15 Bcf/d by 2028, and to install 4,000 km of pipelines, as well as 17 gas compression trains.
These developments underline Saudi Aramco’s commitment to meeting the growing demand for natural gas and supporting the country’s energy goals. Current investments strengthen Saudi Aramco’s position as a world leader in the energy industry.

CTCI strengthens its position in Taiwan with a new EPC contract for a regasification unit at the Kaohsiung LNG terminal, with a capacity of 1,600 tonnes per hour.
Exxon Mobil forecasts sustained growth in global natural gas demand by 2050, driven by industrial use and rising energy needs in developing economies.
Capstone Green Energy received a 5.8-megawatt order for its natural gas microturbines, to be deployed across multiple food production facilities in Mexico through regional distributor DTC Machinery.
Private firm Harvest Midstream has signed a $1 billion acquisition deal with MPLX for gas processing and transport infrastructure across three western US states.
Sempra Infrastructure and EQT Corporation have signed a 20-year liquefied natural gas purchase agreement, consolidating Phase 2 of the Port Arthur LNG project in Texas and strengthening the United States’ position in the global LNG market.
Subsea7 was selected to lead phase 3 of the Sakarya gas field, a strategic contract for Türkiye’s energy supply valued between $750mn and $1.25bn.
Tokyo protests against Chinese installations deemed unilateral in a disputed maritime zone, despite a bilateral agreement stalled since 2010.
Bp has awarded Baker Hughes a long-term service agreement for the Tangguh liquefied natural gas plant, covering spare parts, maintenance and technical support for its turbomachinery equipment.
Chinese group Sinopec has launched a large-scale seismic imaging campaign across 3,000 km² in Mexico using nodal technology from Sercel, owned by Viridien, delivered in August to map areas with complex terrain.
CNOOC Limited has signed two production sharing contracts with SKK Migas to explore the Gaea and Gaea II blocks in West Papua, alongside EnQuest and Agra.
Australian group Macquarie partners with AMIGO LNG for an annual supply of 0.6 million tonnes of liquefied natural gas over fifteen years, with operations expected to start in 2028 from the Guaymas terminal in Mexico.
A consortium led by ONEOK is developing a 450-mile pipeline to transport up to 2.5 billion cubic feet of gas per day from the Permian Basin to the Gulf Coast.
AMIGO LNG has awarded Drydocks World a major EPC contract to build the world’s largest floating LNG liquefaction terminal, aimed at strengthening exports to Asia and Latin America.
The Alberta Utilities Commission approves the Need Assessment Application for the Yellowhead Pipeline, marking a key step for Canadian Utilities, a subsidiary of ATCO. The project foresees significant economic benefits for the province.
Nigeria LNG signs major deals with oil groups to ensure gas supply to its liquefaction infrastructure over two decades.
The European Union and Washington have finalized an agreement setting $750 billion in U.S. gas, oil and nuclear purchases, complemented by $600 billion in European investments in the United States by 2028.
Sempra Infrastructure and ConocoPhillips signed a 20-year LNG sales agreement for 4 Mtpa, confirming their joint commitment to expanding the Port Arthur LNG liquefaction terminal in Texas.
Russian pipeline gas exports to China rose by 21.3% over seven months, contrasting with a 7.6% drop in oil shipments during the same period.
MCF Energy continues operations at the Kinsau-1A drilling site, targeting a promising Jurassic formation first tested by Mobil in 1983.
The group announces an interim dividend of 53 cps, production of 548 Mboe/d, a unit cost of $7.7/boe and major milestones on Scarborough, Trion, Beaumont and Louisiana LNG, while strengthening liquidity and financial discipline.

Log in to read this article

You'll also have access to a selection of our best content.

or

Go unlimited with our annual offer: $99 for the 1styear year, then $ 199/year.