Nuclear Future: IAEA Reassurance at Bure

The IAEA's inspection of Andra's Bure laboratory reveals France's deep commitment to the safe management of nuclear waste.

Share:

Avenir Nucléaire Sécurisé à Bure

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The recent visit of Rafael Grossi, Director General of the International Atomic Energy Agency (IAEA), to Andra’s Bure laboratory highlights the growing importance of nuclear waste management. This project, known as Cigéo, represents a significant milestone in France’s energy strategy and underlines its pioneering role in the global nuclear sector.

IAEA perspective on the Andra Laboratory

During his visit, Mr Grossi expressed great confidence in the laboratory’s capabilities, calling it “impressive” and a “clear demonstration” of France’s seriousness in the nuclear field. Drawing comparisons with similar sites in Finland and Sweden, he emphasized that the Andra laboratory is becoming a world benchmark in radioactive waste management.

Advanced Technologies and Long-Term Security

The Andra laboratory, which does not currently store any radioactive waste, is used as a test site for various technologies designed to ensure the safe, long-term storage of radioactive waste. According to Mr Grossi, these technological advances offer

“technically and scientifically proven guarantees”.

underlining France’s commitment to responsible nuclear waste management.

Controversies and Social Challenges

Despite the IAEA’s approval, the Cigéo project has met with opposition, including demonstrations against what some see as the government’s “power grab”. Grossi refutes these allegations, asserting that the project rather represents a

“scientific, human and financial investment”.

from a nuclear-dependent society to sustainable development.

Rencontres et Perspectives Politiques

Mr. Grossi’s meeting with President Emmanuel Macron and recent “important announcements” on nuclear power in France mark a decisive moment for the project. These developments coincide with the French Constitutional Council’s decision to preserve the right of future generations to a healthy environment, underlining the relevance of the Cigéo project in this context.

The IAEA’s visit to Bure represents a turning point in nuclear waste management, combining technological advances with a political commitment to a sustainable future.

The UK's Office for Nuclear Regulation has granted formal consent to EDF Energy to decommission the Hinkley Point B nuclear power plant in Somerset, England, following its permanent shutdown in August 2022.
Illinois and New York take significant steps to develop additional nuclear capacity, aiming to strengthen their power generation while diversifying their sources.
US company Intuitive Machines has secured an additional contract to develop compact nuclear technology for lunar missions and extended space infrastructure.
Centrales Nucleares Almaraz-Trillo has officially requested the extension of operations for reactors Almaraz I and II until 2030, challenging the original timeline for the shutdown of Spain’s nuclear fleet.
US-based Amentum has secured strategic roles on a 15-year decommissioning framework in the United Kingdom, potentially worth up to £1.4bn ($1.9bn), through multiple projects at the Sellafield site.
Finland’s Olkiluoto nuclear plant will receive a €90mn ($104mn) loan from the European Investment Bank to upgrade units I and II as part of a programme aiming to extend their operational lifespan.
Electrabel has entrusted Framatome with upgrading the control system of the Tihange 3 reactor, reinforcing Belgium’s nuclear extension strategy launched in 2023.
Hitachi joins Washington and Tokyo in strategic projects to modernise the US grid and back artificial intelligence expansion through nuclear and electrification investments.
NANO Nuclear restructures its Canadian operations under the name True North Nuclear to accelerate regulatory and industrial development of its KRONOS MMR™ microreactor.
Cameco and Brookfield have signed a strategic agreement with the US government to build new Westinghouse reactors, a project valued at a minimum of $80bn, including an unprecedented public participation mechanism.
Talks are underway between Astana and Helsinki to consider the delivery of Kazakh uranium for Finnish nuclear power plants, amid efforts to diversify energy export markets.
NextEra Energy announces an agreement with Google to restart a nuclear plant in Iowa, with operations expected to resume as early as 2029 and full site ownership secured.
The environmental review of TerraPower’s Natrium project in Wyoming has been completed, paving the way for a construction permit for this advanced nuclear reactor.
Santee Cooper has selected Brookfield Asset Management to lead a feasibility study aimed at completing two unfinished AP1000 reactors, without relying on public funds or raising consumer rates.
Endesa, Iberdrola and Naturgy have officially requested the Spanish government to delay the closure of the Almaraz nuclear power plant, originally scheduled for 2028, reigniting the debate on nuclear power's role in the national energy mix.
The reactor vessel for Unit 1 at Egypt’s El Dabaa nuclear plant has been delivered following a 20-day maritime transport from Saint Petersburg, marking a critical milestone in the country’s energy project.
Ontario Power Generation secures CAD3bn ($2.1bn) in public equity financing to construct four modular reactors at Darlington, aiming to ease private sector entry into next-generation nuclear infrastructure.
French developer Newcleo launches a joint venture with Nextchem through a EUR70 mn contract to design the conventional island of its upcoming 200 MW modular nuclear reactors.
NANO Nuclear strengthens its North American strategy by acquiring Global First Power in Canada, securing regulatory rights for its KRONOS MMR™ project at Chalk River.
South Korea becomes the first country to submit a safeguards technical report to the IAEA for a small modular reactor, setting a precedent for early integration of non-proliferation requirements in nuclear design.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.