Port of Long Beach Launches Pier Wind Project

The Port of Long Beach is considering building an offshore floating wind farm facility known as Pier Wind. This ambitious project will help California meet its renewable energy goals and combat climate change, while creating jobs and career opportunities for local communities.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The Port of Long Beach plans to build an ambitious facility to help California and the nation meet renewable energy goals in the coming decades. The floating offshore wind farm project, called Pier Wind, would support the manufacture and assembly of offshore wind turbines as tall as the Eiffel Tower. It would be the largest such facility in a U.S. port specifically designed to accommodate offshore wind turbine assembly.

Reducing the cost of wind energy

The Pier Wind project will help California harness the power of offshore wind to produce renewable energy while improving air quality by reducing reliance on fossil fuels. It will also contribute to the state’s goal of producing 25 gigawatts of offshore wind energy by 2045 and help reduce the national cost of offshore wind energy by 70% by 2035.

The facility would encompass up to 400 acres of newly constructed land located southwest of the Long Beach Gateway International Bridge in the Harbor District. The Port’s concept study provides information for further planning and discussion with state and federal officials, developers and funders for the $4.7 billion project.

Start of construction in 2027

Pier Wind will also create new jobs and career opportunities for the communities closest to the port that have been disproportionately affected by climate change and port operations. Community members will participate in and benefit from California’s transition away from fossil fuels and toward a green economy.

Construction could begin in January 2027, with the first 100 acres operational in early 2031, the next 100 acres operational in late 2031, and the final 200 acres operational in 2035. The Pier Wind project represents an important effort to combat climate change by encouraging the adoption of renewable energy and creating jobs in communities affected by the negative consequences of fossil fuel development.

Danish Ørsted has signed an agreement with Apollo to sell a 50% stake in its Hornsea 3 offshore wind farm in the UK, in a strategic transaction valued at approximately DKK 39 billion ($5.43bn).
Eneco takes over Prowind’s wind project development business in the Netherlands, adding 260 MW to its portfolio. Prowind refocuses on the German market, where demand is growing rapidly.
The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.