Iran begins enriching uranium to 60% at Fordo plant

Iran has begun producing 60% enriched uranium at its Fordo plant, in a new departure from its commitments.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Iran has begun producing 60% enriched uranium at its Fordo plant, in a new departure from its commitments to the major powers, in response to a critical resolution adopted by the International Atomic Energy Agency (IAEA).

This 60% threshold announced on Tuesday far exceeds the 3.67% threshold set by the 2015 agreement between Tehran and the West to prevent Iran from acquiring atomic weapons. Uranium enriched to 90% is needed to produce an atomic bomb.

Under the terms of the agreement, Iran agreed to freeze its enrichment activities at Fordo, an underground plant located 180 kilometers south of Tehran.

However, the site had been re-commissioned in 2019 and recently modified to achieve greater efficiency.

“The production of 60% enriched uranium at Fordo has started since Monday,” the head of the Atomic Energy Organization of Iran (AEOI), Mohammad Eslami, announced on Tuesday, as quoted by the Isna news agency.

“We have said that political pressure does not change anything and that the adoption of a resolution (at the IAEA) will elicit a serious response” from Iran, he added.

The 2015 pact, known by its acronym JCPOA, offers Iran relief from international sanctions in exchange for guarantees that Tehran will not acquire an atomic weapon, a goal the Islamic Republic has always denied pursuing.

But following the U.S. withdrawal from the JCPOA in 2018 under Donald Trump and the reinstatement of U.S. sanctions that stifle its economy, Tehran has been steadily moving away from its obligations.

As the main measure of this disengagement, Tehran began the process of producing 20% enriched uranium in the Fordo plant in January 2021.

Then in April 2021, Iran announced that it had begun to produce uranium enriched to 60% at the Natanz site (center), approaching the 90% threshold.

On Sunday, Iran announced that it had taken retaliatory measures against the IAEA following a resolution criticizing Tehran’s lack of cooperation, presented by the United States and three European countries (United Kingdom, France and Germany).

This resolution voted last Thursday by the Board of Governors of the UN agency is the second this year, after the one in June. Russia and China voted against.

The reason for the two resolutions is the same: the lack of “technically credible” answers from Tehran concerning traces of enriched uranium found at three undeclared sites.

Second action

This issue is one of the main points on which the negotiations started in April 2021 in Vienna to revive the 2015 agreement are stalling.

After positive signals in August, talks have now stalled.

Tehran is calling for a closure of the IAEA investigation in order to reach a compromise with its direct interlocutors (Germany, France, Great Britain, China and Russia), while the United States is indirectly involved.

At the end of October, the head of US diplomacy, Antony Blinken, said he had little hope of a rapid outcome to the talks.

Iran had announced on Sunday that the retaliatory measures had been implemented the same day “in the presence of IAEA inspectors” at the sites of Natanz and Fordo.

“In a second action in response to the resolution, Iran injected gas into two more IR-2m and IR-4 cascades (of centrifuges) at the Natanz site,” Isna news agency reported Tuesday.

In a report accessed by AFP, the IAEA reports accumulated stocks of enriched uranium of 3,673.7 kilograms as of October 22, a total 267.2 kilograms lower compared to August but well above the 202.8-kilogram cap to which the Islamic Republic committed in 2015.

Above all, Iran is still enriching at high levels, far from the limit set at 3.67%: it has 386.4 kg at 20% (compared to 331.9 kg previously) and 62.3 kg at 60% (compared to 55.6 kg).

This increase in power is also taking place at a time when the IAEA is facing a clear restriction of its inspections.

A resumption of dialogue seems all the more difficult as Iran has been shaken by popular protest since the death on September 16 of a 22-year-old woman, Mahsa Amini, who died after her arrest by the vice police.

Start-up SEATOM has been selected to join NATO's DIANA programme with its micro nuclear reactor designed for extreme environments, reinforcing its position in dual-use marine and military energy technologies.
The Estonian Ministry of Economic Affairs has opened a tender to select a site and conduct initial environmental studies for a 600 MW nuclear power plant, marking a decisive step for the country’s energy future.
The European Commission has approved Poland's financial support plan for its first nuclear power plant, a €42bn project backed by public funding, state guarantees, and a contract for difference mechanism.
Six European nuclear authorities have completed the second phase of a joint review of the Nuward modular reactor, a key step toward aligning regulatory frameworks for small nuclear reactors across Europe.
Driven by off-grid industrial heat demand and decarbonisation mandates, the global small modular reactor market is set to grow 24% annually through 2030, with installed capacity expected to triple within five years.
US fusion energy leaders have called on the federal government to redirect public funding towards their projects, arguing that large-scale investment is needed to stay competitive with China.
Santee Cooper has approved a memorandum of understanding with Brookfield Asset Management to assess the feasibility of restarting two unfinished nuclear reactors, with a potential $2.7 billion payment and 550 MW capacity stake.
Helical Fusion has signed a landmark agreement with Aoki Super to supply electricity from fusion, marking a first in Japan’s energy sector and a commercial step forward for the helical stellarator technology.
India’s nuclear capacity is expected to grow by more than 13,000 MW by 2032, driven by ongoing heavy water reactor construction, new regional projects and small modular reactor development by the Bhabha Atomic Research Centre.
NextEra Energy has lifted its earnings estimates for 2025 and 2026, supported by power demand linked to long‑term contracts previously signed with Google and Meta to supply their artificial intelligence data centres with low‑carbon electricity.
London launches a complete regulatory overhaul of its nuclear industry to shorten authorisation timelines, expand eligible sites, and lower construction and financing costs.
Finland's Ministry of Economic Affairs extends the deadline to June 2026 for the regulator to complete its review of the operating licence for the Olkiluoto spent nuclear fuel repository.
Framatome will replace several digital control systems at the Columbia plant in the United States under a contract awarded by Energy Northwest.
The conditional green light from the nuclear regulator moves Cigéo into its final regulatory stage, while shifting the risks towards financing, territorial negotiations and industrial execution.
The drone strike confirmed by the IAEA on the Chernobyl site vault exposes Ukraine to a nuclear risk under armed conflict, forcing the EBRD to finance partial restoration while industry standards must now account for drone threats.
Deep Fission is installing a 15 MWe pressurised reactor 1.6 km underground at Great Plains Industrial Park, under the Department of Energy’s accelerated pilot programme, targeting criticality by July 4, 2026.
EDF commits to supply 33 MW of nuclear electricity to Verkor over 12 years, enabling the battery manufacturer to stabilise energy costs ahead of launching its first Gigafactory.
The full-scope simulator for the Lianjiang nuclear project has successfully passed factory acceptance testing, paving the way for its installation at the construction site in China's Guangdong province.
A coalition of Danish industry groups, unions and investors launches a platform in support of modular nuclear power, aiming to develop firm low-carbon capacity to sustain industrial competitiveness.
The United Kingdom and TAE Technologies create a joint venture in Culham to produce neutral beams, a key component of fusion, with strategic backing from Google.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.