Iran begins enriching uranium to 60% at Fordo plant

Iran has begun producing 60% enriched uranium at its Fordo plant, in a new departure from its commitments.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Iran has begun producing 60% enriched uranium at its Fordo plant, in a new departure from its commitments to the major powers, in response to a critical resolution adopted by the International Atomic Energy Agency (IAEA).

This 60% threshold announced on Tuesday far exceeds the 3.67% threshold set by the 2015 agreement between Tehran and the West to prevent Iran from acquiring atomic weapons. Uranium enriched to 90% is needed to produce an atomic bomb.

Under the terms of the agreement, Iran agreed to freeze its enrichment activities at Fordo, an underground plant located 180 kilometers south of Tehran.

However, the site had been re-commissioned in 2019 and recently modified to achieve greater efficiency.

“The production of 60% enriched uranium at Fordo has started since Monday,” the head of the Atomic Energy Organization of Iran (AEOI), Mohammad Eslami, announced on Tuesday, as quoted by the Isna news agency.

“We have said that political pressure does not change anything and that the adoption of a resolution (at the IAEA) will elicit a serious response” from Iran, he added.

The 2015 pact, known by its acronym JCPOA, offers Iran relief from international sanctions in exchange for guarantees that Tehran will not acquire an atomic weapon, a goal the Islamic Republic has always denied pursuing.

But following the U.S. withdrawal from the JCPOA in 2018 under Donald Trump and the reinstatement of U.S. sanctions that stifle its economy, Tehran has been steadily moving away from its obligations.

As the main measure of this disengagement, Tehran began the process of producing 20% enriched uranium in the Fordo plant in January 2021.

Then in April 2021, Iran announced that it had begun to produce uranium enriched to 60% at the Natanz site (center), approaching the 90% threshold.

On Sunday, Iran announced that it had taken retaliatory measures against the IAEA following a resolution criticizing Tehran’s lack of cooperation, presented by the United States and three European countries (United Kingdom, France and Germany).

This resolution voted last Thursday by the Board of Governors of the UN agency is the second this year, after the one in June. Russia and China voted against.

The reason for the two resolutions is the same: the lack of “technically credible” answers from Tehran concerning traces of enriched uranium found at three undeclared sites.

Second action

This issue is one of the main points on which the negotiations started in April 2021 in Vienna to revive the 2015 agreement are stalling.

After positive signals in August, talks have now stalled.

Tehran is calling for a closure of the IAEA investigation in order to reach a compromise with its direct interlocutors (Germany, France, Great Britain, China and Russia), while the United States is indirectly involved.

At the end of October, the head of US diplomacy, Antony Blinken, said he had little hope of a rapid outcome to the talks.

Iran had announced on Sunday that the retaliatory measures had been implemented the same day “in the presence of IAEA inspectors” at the sites of Natanz and Fordo.

“In a second action in response to the resolution, Iran injected gas into two more IR-2m and IR-4 cascades (of centrifuges) at the Natanz site,” Isna news agency reported Tuesday.

In a report accessed by AFP, the IAEA reports accumulated stocks of enriched uranium of 3,673.7 kilograms as of October 22, a total 267.2 kilograms lower compared to August but well above the 202.8-kilogram cap to which the Islamic Republic committed in 2015.

Above all, Iran is still enriching at high levels, far from the limit set at 3.67%: it has 386.4 kg at 20% (compared to 331.9 kg previously) and 62.3 kg at 60% (compared to 55.6 kg).

This increase in power is also taking place at a time when the IAEA is facing a clear restriction of its inspections.

A resumption of dialogue seems all the more difficult as Iran has been shaken by popular protest since the death on September 16 of a 22-year-old woman, Mahsa Amini, who died after her arrest by the vice police.

NANO Nuclear strengthens its North American strategy by acquiring Global First Power in Canada, securing regulatory rights for its KRONOS MMR™ project at Chalk River.
South Korea becomes the first country to submit a safeguards technical report to the IAEA for a small modular reactor, setting a precedent for early integration of non-proliferation requirements in nuclear design.
The Environmental Authority criticises the lack of key data on health risks, chemical discharges and construction safety for EDF's two upcoming EPR2 reactors in Seine-Maritime.
Brazil and China have concluded a three-year agreement to secure access to essential radioisotopes for the medical, industrial and scientific sectors, with no financial exchange between the parties.
US-based developer Last Energy will deploy its first domestic microreactor at Texas A&M-RELLIS, marking a strategic step in the advanced modular reactor race.
PGE acquires ZE PAK's stake in the joint venture responsible for developing Poland’s second nuclear site, consolidating a strategic asset within its energy portfolio.
Amazon unveils new visuals of its upcoming nuclear site, marking a key step in its partnership with X-energy to deploy up to 960 MW of modular nuclear capacity in Washington state.
Canadian uranium producer NexGen Energy has completed a A$1bn ($639mn) equity raise split between North American and Australian markets to support the development of its Rook I project.
Tokyo Electric Power Company Holdings is examining the permanent closure of units 1 and 2 at the Kashiwazaki-Kariwa nuclear power plant, the oldest at the site, while continuing efforts to restart unit 6.
The formal expiration of the 2015 nuclear deal with Iran comes as international sanctions have already been reinstated and diplomatic negotiations remain stalled.
Oklo, newcleo and Blykalla partner to develop advanced nuclear fuel infrastructure in the United States, backed by a planned $2bn investment.
enCore Energy has identified three new uranium roll fronts at its Alta Mesa project, with ongoing drilling aimed at defining their extent and accelerating development work.
California-based Radiant will build its first microreactor production facility in Oak Ridge, on a former Manhattan Project site, with production targeted at 50 units per year by 2028.
EDF restarted the Flamanville EPR reactor after repairing non-compliant valves, delaying the target of reaching full power output of 1,620 MW until the end of autumn.
Nano Nuclear and the University of Illinois will begin drilling operations for the KRONOS MMR™ reactor on October 24, marking a key step toward commercialisation of the nuclear project on the Urbana-Champaign campus.
Natura Resources is finalising construction of the MSR-1, an advanced liquid-fuel nuclear reactor, with a planned launch in 2026 on the Abilene Christian University campus.
JPMorganChase commits $10bn in direct investments as part of a $1.5tn plan to boost energy independence and strategic technologies, including next-generation nuclear power.
A roadmap under development aims to establish regulatory and technical foundations for the deployment of small modular reactors, with the goal of strengthening national energy security and attracting private capital.
EDF adjusts its 2025 nuclear production forecast to between 365 and 375 TWh, supported by the performance of its industrial programme START 2025 focused on maintenance efficiency.
The United Nations nuclear agency is urging Ukraine and Russia to establish a local ceasefire to repair damaged power lines at the Zaporizhzhia plant, which remains on alert after losing all external power supply.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.