ABO Energy cuts costs and accelerates wind project sales

ABO Energy maintains its annual targets despite a drop in half-year profit, relying on cost-cutting measures and early project sales to secure cash flow.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

German developer ABO Energy reported a net profit of €9.6mn ($10.37mn) in the first half of 2025, down from €11.4mn ($12.32mn) a year earlier. Revenue, however, rose to €206mn ($222.64mn) compared with €123mn ($132.96mn) in the same period of 2024, driven by a sharp increase in construction revenues. The company maintained its full-year earnings forecast of between €29mn and €39mn ($31.34mn to $42.14mn), supported by an expanding portfolio of projects ready for construction.

Workforce reduction and strategic repositioning

ABO Energy has launched an efficiency programme to reduce operating costs amid falling electricity prices and intensifying competition in renewable energy markets. Chief Financial Officer Alexander Reinicke said the company has halted headcount growth and is now focusing on internal redeployment. Vacant positions will not be filled, and operations will be redirected to priority projects.

At the same time, ABO Energy is continuing its strategy of exiting non-core markets. Following the sale of its Greek subsidiary and its 1.5 gigawatt portfolio completed on June 30, the company signed an agreement in July to divest a 4.4 gigawatt wind portfolio in Finland, with closing scheduled for the fourth quarter. According to management board spokesman Dr Karsten Schlageter, these transactions will strengthen the company’s ability to finance operations while sustaining development momentum.

Growth in Germany and revenue rebalancing

Germany’s contribution to ABO Energy’s revenue reached 65% in the first half, compared with 58% in 2024. This increase is mainly driven by construction revenues, which rose to €124mn ($134.02mn) from €39mn ($42.15mn) a year earlier. Planning services remained stable at around €72mn ($77.80mn).

To reduce pressure on human resources and accelerate returns on invested capital, ABO Energy plans to expand the sale of project rights before construction. This model complements its turnkey construction business, which will remain at current levels.

Global pipeline expansion despite divestments

Despite exiting Greece, ABO Energy’s global portfolio has continued to grow, reaching around 34 gigawatts under development, excluding hydrogen projects. This underscores the resilience of the company’s pipeline, even after several asset sales.

Work in progress inventory, however, declined by €15mn ($16.21mn) during the period, compared with a €64mn ($69.13mn) increase a year earlier. Total output for the half-year stood at €191mn ($206.49mn), broadly in line with €187mn ($202.33mn) recorded in the first half of 2024.

The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.

All the latest energy news, all the time

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.