Koehler and CMB Energy launch KB Renewables to target 1GW wind by 2030

Koehler Renewable Energy and CMB Energy formalise a joint venture to develop, operate and acquire wind farms targeting one gigawatt of installed capacity by 2030, with potential expansion into solar and storage.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Koehler Renewable Energy, a German company active in renewable energy, and Denmark’s CMB Energy have announced the creation of a joint venture called KB Renewables, aiming to develop and operate wind projects to build a portfolio of one gigawatt (GW) of installed capacity by 2030. Koehler Renewable Energy owns 80% of the new entity, while CMB Energy holds 20%. The company was legally established in April.

A strategy focused on expansion

KB Renewables plans to construct its own wind sites while acquiring operational or in-development assets. The approach favours long-term park management, combining value creation through new developments and targeted acquisitions. The joint venture’s leaders also indicate that future expansions could include solar energy and battery storage.

The management of KB Renewables is led by Dr Claus M. Brodersen, founder of CMB Energy, now acting as managing director. Nicolas Christoph, director of wind, solar, hydro and business development at Koehler, co-manages the company.

Supply models for Koehler Group

The joint venture intends to supply Koehler Group’s industrial activities with electricity through Power Purchase Agreements (PPA) and direct supply models. These agreements will enable the group to secure its electricity supply while stabilising costs in the long term. This approach aligns with a strategy to strengthen the energy supply chain and enhance the group’s autonomy.

According to Nicolas Christoph, the goal is to “deliver solid, profitable wind projects that make a tangible contribution to energy security and decarbonisation across Koehler Group’s operations.” KB Renewables’ model relies on the financial resources and strategic expertise of its shareholders to accelerate capacity growth.

The new joint venture is set to acquire both existing projects and develop new assets depending on market opportunities. KB Renewables’ strategy places emphasis on building a diversified and sustainable portfolio, while exploring new complementary segments within the renewable energy sector.

The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.