ASNR changes its publication practices following nuclear sector merger

The Nuclear Safety and Radiation Protection Authority (ASNR) will now publish its decisions and expert reports simultaneously, amid a controversial merger of nuclear oversight bodies.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The Nuclear Safety and Radiation Protection Authority (ASNR), created from the merger between the Nuclear Safety Authority (ASN) and the Institute for Radiological Protection and Nuclear Safety (IRSN), has announced new communication methods regarding the publication of its decisions. Starting this year, most of its decisions will be published simultaneously with the associated expert assessments, in accordance with the law passed on May 21, 2024.

A reform marked by internal tensions

This change comes in a tense context, as the merger of the two bodies, initiated by the government, faced opposition from trade unions and associations. These groups expressed concerns over a decline in transparency and the erosion of independence between technical expertise and administrative decision-making. Prior to the reform, IRSN’s expert reports were, in most cases, made public before ASN’s final decisions.

In a statement released on April 30, ASNR indicated that the new structure is intended to ensure transparency and strengthen public information. In certain specific cases, the published content will include expert reports made available before decisions are taken, particularly during public consultation phases.

Staggered publications depending on the case

For cases involving multiple successive expert reports, such as nuclear facility safety reviews, the expert opinions will be posted online within one month of finalisation. Similarly, reports not directly linked to a decision will be published separately. ASNR stressed its aim to provide continuous information through its online platform.

This procedural change is part of a reform officially designed to accelerate the administrative and technical processes in the French nuclear sector, currently undergoing expansion. ASNR now centralises all oversight, research, expertise, and training functions on behalf of the State for civil nuclear safety and radiation protection activities.

Towards centralised decision-making

The creation of this unified authority aimed to “streamline” internal processes in the sector while reinforcing the State’s ability to oversee the expansion of the nuclear fleet. The new model deviates from the former two-tiered structure, which separated scientific evaluation from administrative decision-making.

“For ASNR’s draft decisions involving a public consultation phase, the publication of expert opinions will take place when the draft decision is submitted for consultation,” the statement notes. This approach is intended to improve access to the information that forms the basis of decisions before they are finalised.

EDF launches a sovereign digital platform to secure data exchanges between nuclear stakeholders, aiming to accelerate the construction of future EPR2 reactors.
ONE Nuclear Energy publishes a virtual presentation for investors detailing its industrial vision, ahead of its merger with Hennessy Capital Investment Corp. VII expected in the first half of 2026.
A majority of Americans now back nuclear energy, with strong approval for converting coal plants into nuclear sites and increasing public investment in sector technologies.
Alfa Laval extends its cooperation with EDF to supply heat exchangers for EPR2 projects across three nuclear sites, reinforcing its position in the French nuclear sector.
Hadron Energy formalises its regulatory plan with U.S. nuclear authorities ahead of its $1.2bn merger with GigCapital7, relying on early compliance to accelerate the commercial deployment of its microreactor.
The International Atomic Energy Agency denounces the ongoing inspection blockage at several damaged Iranian nuclear facilities, where stocks of highly enriched uranium remain.
Orano is testing an artificial intelligence-equipped robot for four months at its Melox site to assess its ability to assist in sensitive and repetitive industrial operations.
The UK’s Sizewell C project reaches a key milestone with a financing boost from EDF, including a loan guaranteed by Bpifrance and backing from the National Wealth Fund, with an estimated total cost of GBP38bn ($48.19bn).
NGE, through its subsidiary Sade, has won the contract for the cooling system networks (SEC) of six EPR2 reactors in France, a key project for nuclear safety and industrial innovation.
Constellation plans to increase the nuclear capacity of Calvert Cliffs in Maryland, with projects aimed at addressing the rising energy demand and supporting the state’s economic growth.
The UK's Office for Nuclear Regulation has granted formal consent to EDF Energy to decommission the Hinkley Point B nuclear power plant in Somerset, England, following its permanent shutdown in August 2022.
Illinois and New York take significant steps to develop additional nuclear capacity, aiming to strengthen their power generation while diversifying their sources.
US company Intuitive Machines has secured an additional contract to develop compact nuclear technology for lunar missions and extended space infrastructure.
Centrales Nucleares Almaraz-Trillo has officially requested the extension of operations for reactors Almaraz I and II until 2030, challenging the original timeline for the shutdown of Spain’s nuclear fleet.
US-based Amentum has secured strategic roles on a 15-year decommissioning framework in the United Kingdom, potentially worth up to £1.4bn ($1.9bn), through multiple projects at the Sellafield site.
Finland’s Olkiluoto nuclear plant will receive a €90mn ($104mn) loan from the European Investment Bank to upgrade units I and II as part of a programme aiming to extend their operational lifespan.
Electrabel has entrusted Framatome with upgrading the control system of the Tihange 3 reactor, reinforcing Belgium’s nuclear extension strategy launched in 2023.
Hitachi joins Washington and Tokyo in strategic projects to modernise the US grid and back artificial intelligence expansion through nuclear and electrification investments.
NANO Nuclear restructures its Canadian operations under the name True North Nuclear to accelerate regulatory and industrial development of its KRONOS MMR™ microreactor.
Cameco and Brookfield have signed a strategic agreement with the US government to build new Westinghouse reactors, a project valued at a minimum of $80bn, including an unprecedented public participation mechanism.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.