GE Hitachi and Rolls-Royce SMR submit final offer in UK SMR selection process

GE Hitachi and Rolls-Royce SMR have submitted their final offer as part of the modular reactor selection process led by Great British Nuclear in the United Kingdom.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Two of the four companies shortlisted by Great British Nuclear (GBN) have confirmed they have submitted their final offer as part of the UK’s small modular reactor (SMR) technology selection process. GE Hitachi Nuclear Energy and Rolls-Royce SMR have taken a strategic step in this procedure, which is overseen by GBN, the public body tasked with developing new civilian nuclear capacity on a national scale.

Four vendors were shortlisted last September to enter negotiations: GE Hitachi, Rolls-Royce SMR, Holtec International and Westinghouse Electric Company. In February, the companies were invited to submit final offers. GBN plans to select up to three technologies, with the aim of supporting the deployment of multiple SMR units at one or more designated sites.

Proposed technologies and potential sites

The competing designs include GE Hitachi’s BWRX-300, a 300 MWe boiling water reactor, and the Rolls-Royce SMR model, a 470 MWe pressurised water reactor. Holtec is proposing the SMR-300, also a 300 MWe pressurised water reactor, while Westinghouse is promoting its AP300, with a capacity of 300 MWe/900 MWt. Each company emphasises the robustness of their technologies, derived from existing designs, and their ability to leverage modular production methods to accelerate delivery timelines.

GBN currently owns two sites identified for SMR deployment: Wylfa in North Wales and Oldbury in South West England. However, additional locations may be selected depending on the outcome of the selection phase.

Next phase of the selection process

The announcement of the selected technologies is expected before summer. GBN subsequently plans to make a final investment decision in 2029. According to Simon Bowen, Chairman of GBN, the chosen vendors may receive financial support covering the stages of design, regulatory approval, environmental permitting and site development, as well as a potential contract for equipment supply.

Recent statements from GE Hitachi and Rolls-Royce SMR highlight the industrial scope of their proposals. The process aims to enable rapid deployment of selected technologies as part of the UK’s energy diversification strategy.

Molten salt reactor developer Natura Resources has acquired Shepherd Power and partnered with NOV to scale up modular reactor manufacturing by the next decade.
China National Nuclear Corporation expects commercial operation in 2026 for its ACP100 reactor, following successful cold testing and completion of critical structures in 2025.
Start-up SEATOM has been selected to join NATO's DIANA programme with its micro nuclear reactor designed for extreme environments, reinforcing its position in dual-use marine and military energy technologies.
The Estonian Ministry of Economic Affairs has opened a tender to select a site and conduct initial environmental studies for a 600 MW nuclear power plant, marking a decisive step for the country’s energy future.
The European Commission has approved Poland's financial support plan for its first nuclear power plant, a €42bn project backed by public funding, state guarantees, and a contract for difference mechanism.
Six European nuclear authorities have completed the second phase of a joint review of the Nuward modular reactor, a key step toward aligning regulatory frameworks for small nuclear reactors across Europe.
Driven by off-grid industrial heat demand and decarbonisation mandates, the global small modular reactor market is set to grow 24% annually through 2030, with installed capacity expected to triple within five years.
US fusion energy leaders have called on the federal government to redirect public funding towards their projects, arguing that large-scale investment is needed to stay competitive with China.
Santee Cooper has approved a memorandum of understanding with Brookfield Asset Management to assess the feasibility of restarting two unfinished nuclear reactors, with a potential $2.7 billion payment and 550 MW capacity stake.
Helical Fusion has signed a landmark agreement with Aoki Super to supply electricity from fusion, marking a first in Japan’s energy sector and a commercial step forward for the helical stellarator technology.
India’s nuclear capacity is expected to grow by more than 13,000 MW by 2032, driven by ongoing heavy water reactor construction, new regional projects and small modular reactor development by the Bhabha Atomic Research Centre.
NextEra Energy has lifted its earnings estimates for 2025 and 2026, supported by power demand linked to long‑term contracts previously signed with Google and Meta to supply their artificial intelligence data centres with low‑carbon electricity.
London launches a complete regulatory overhaul of its nuclear industry to shorten authorisation timelines, expand eligible sites, and lower construction and financing costs.
Finland's Ministry of Economic Affairs extends the deadline to June 2026 for the regulator to complete its review of the operating licence for the Olkiluoto spent nuclear fuel repository.
Framatome will replace several digital control systems at the Columbia plant in the United States under a contract awarded by Energy Northwest.
The conditional green light from the nuclear regulator moves Cigéo into its final regulatory stage, while shifting the risks towards financing, territorial negotiations and industrial execution.
The drone strike confirmed by the IAEA on the Chernobyl site vault exposes Ukraine to a nuclear risk under armed conflict, forcing the EBRD to finance partial restoration while industry standards must now account for drone threats.
Deep Fission is installing a 15 MWe pressurised reactor 1.6 km underground at Great Plains Industrial Park, under the Department of Energy’s accelerated pilot programme, targeting criticality by July 4, 2026.
EDF commits to supply 33 MW of nuclear electricity to Verkor over 12 years, enabling the battery manufacturer to stabilise energy costs ahead of launching its first Gigafactory.
The full-scope simulator for the Lianjiang nuclear project has successfully passed factory acceptance testing, paving the way for its installation at the construction site in China's Guangdong province.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.