Bulgargaz and Botas renegotiate LNG contract

Bulgargaz is in talks with Botas to revise their gas agreement, essential to Bulgaria's energy diversification, in response to criticism of its efficiency.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Bulgargaz is at the heart of strategic discussions with Botas, the Turkish gas transmission company.
The aim is to renegotiate a liquefied natural gas (LNG) supply contract signed in January 2023.
This agreement, designed to reinforce Bulgaria’s energy security following the suspension of Russian supplies in 2022, is now coming under increasing criticism for its lack of relevance to the country’s energy needs.

Background and challenges

The terms of the initial agreement, hailed as a quick fix to compensate for the halt in Russian deliveries, are now being called into question.
Influential voices within the Bulgarian energy sector are denouncing the underperformance of expected deliveries, prompting parliament to mandate the Minister of Energy to renegotiate the terms of the agreement.
Critics point to a lack of flexibility and a mismatch between the volumes delivered and actual market demand in Bulgaria.
Turkey, with its regasification infrastructure and gas shipping capacity, plays a crucial role in this dynamic.
With an annual send-out capacity of 30 million tonnes, Turkey can absorb part of the Bulgarian surplus, making it easier to redirect flows towards European markets.

Negotiations and outlook

The interconnection agreement between Bulgartransgaz, the Bulgarian gas transmission system operator, and Botas, signed in January 2023, illustrates Bulgaria’s desire to secure its supply by diversifying its sources.
The Strandzha/Malkoclar crossing on the Bulgarian-Turkish border thus becomes a strategic node for gas supplies not only to Bulgaria, but to the entire region.
Current talks between Bulgargaz and Botas aim to adjust this agreement to meet market requirements, while ensuring greater stability of supply.
Against this backdrop, Bulgaria continues to broaden its supplier base, notably via imports from Azerbaijan, and via regasified LNG delivered via Greece and Turkey.
This strategy aims to further reduce the country’s historical dependence on Russian hydrocarbons.
The progress of negotiations between Bulgargaz and Botas could determine the next stage in regional energy integration.
At a time when LNG prices remain high on the spot market in the Eastern Mediterranean, this renegotiation comes at a crucial time for Bulgaria, as it seeks to establish itself as a key player in energy security in Southeast Europe.

Pakistan cancels 21 planned LNG cargoes from Eni due to a gas surplus and negotiates with Qatar for potential deferment or resale of shipments.
A $400 million natural gas pipeline connecting Israel to Cyprus, with a capacity of 1 billion cubic meters per year, is awaiting government approvals, according to Energean’s CEO.
Iran deploys 12 contracts and plans 18 more to recover 300 MMcf/d, inject 200 MMcf/d into the network, and deliver 800,000 tons/year of LPG, with an announced reduction of 30,000 tons/day of emissions.
Qatar warns it could halt its liquefied natural gas (LNG) deliveries to the European Union if the CSDDD directive is not softened, a move that reignites tensions surrounding Brussels' new sustainability regulations.
Oman LNG has renewed its long-term services agreement with Baker Hughes, including the creation of a local digital center dedicated to monitoring natural gas liquefaction production equipment.
The joint venture combines 19 assets (14 in Indonesia, 5 in Malaysia), aims for 300 kboe/d initially and >500 kboe/d, and focuses investments on gas to supply Bontang and the Malaysia LNG complex in Bintulu.
QatarEnergy has awarded Samsung C&T Corporation an EPC contract for a 4.1 MTPA carbon capture project, supporting its expansion into low-carbon energy at Ras Laffan.
The gradual ban on Russian cargoes reshapes European flows, increases winter detours via the Northern Sea Route and shifts risk toward force majeure and “change of law,” despite rising global capacity. —
Poland’s gas market remains highly concentrated around Orlen, which controls imports, production, and distribution, while Warsaw targets internal and regional expansion backed by new infrastructure capacity and demand from heat and power.
SLB OneSubsea has signed two EPC contracts with PTTEP to equip multiple deepwater gas and oil fields offshore Malaysia, extending a two-decade collaboration between the companies.
US-based CPV will build a 1,350 MW combined-cycle natural gas power plant in the Permian Basin with a $1.1bn loan from the Texas Energy Fund.
Producers bring volumes back after targeted reductions, taking advantage of a less discounted basis, expanding outbound capacity and rising seasonal demand, while liquefied natural gas (LNG) exports absorb surplus and support regional differentials.
Matador Resources signs multiple strategic transportation agreements to reduce exposure to the Waha Hub and access Gulf Coast and California markets.
Boardwalk Pipelines initiates a subscription campaign for its Texas Gateway project, aiming to transport 1.45mn Dth/d of natural gas to Louisiana in response to growing energy sector demand along the Gulf Coast.
US-based asset manager Global X has unveiled a new index fund focused on the natural gas value chain, capitalising on the growing momentum of liquified natural gas exports.
US producer Amplify Energy has announced the full sale of its East Texas interests for a total of $127.5mn, aiming to simplify its portfolio and strengthen its financial structure.
Maple Creek Energy has secured the purchase of a GE Vernova 7HA.03 turbine for its gas-fired power plant project in Indiana, shortening construction timelines with commercial operation targeted for 2029.
Talen Energy has finalised a $2.69bn bond financing to support the purchase of two natural gas-fired power plants with a combined capacity of nearly 2,900 MW.
Excelerate Energy has signed a definitive agreement with Iraq’s Ministry of Electricity to develop a floating liquefied natural gas import terminal at Khor Al Zubair, with a projected investment of $450 mn.
Botaş lines up a series of liquefied natural gas (LNG, liquefied natural gas) contracts that narrow the space for Russian and Iranian flows, as domestic production and import capacity strengthen its bargaining position. —

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.