Offshore Licensing Reform to Boost Wind Power in the U.S.

The Bureau of Ocean Energy Management's licensing reform aims to simplify regulations to support the US offshore wind industry, which is facing rising costs and delays.

Share:

Permis éolien offshore US réformé

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The US offshore wind industry faces many challenges, mainly related to a complex and inefficient permitting process. These obstacles lead to delays, cost overruns and commercial uncertainty for energy infrastructure projects. The recent publication of the Renewable Energy Modernization Rule (Mod Rule) by the Bureau of Ocean Energy Management (BOEM) marks the first major attempt to reform offshore wind regulations since their introduction in 2009.

Background and objectives of the reform

In 2009, regulations for the offshore wind industry were largely based on BOEM’s experience with the offshore oil and gas industry. With 15 years’ experience now acquired, the Mod Rule aims to adapt these regulations to the current reality of the wind energy industry. The aim is to simplify the permitting process, reduce administrative burdens and provide greater regulatory certainty for developers. These simplifications will boost the sector and enable the development of offshore wind farm infrastructures, such as the Sunrise Wind project. What’s more, some states, like Maine, are investing in the research and development of offshore wind projects to diversify their energy mix.

Expected impact on industry

The reform comes at a crucial time for the offshore wind industry, which has recently experienced significant difficulties, including price increases, contract cancellations and project delays. By streamlining the permit process, the Mod Rule should help reduce costs and encourage new investment in the sector. It could also accelerate the development of projects on hold, contributing to industry growth.

Analysis of future prospects

The implementation of the Mod Rule is expected to bring a wind of change to the industry. By reducing administrative barriers and providing greater regulatory clarity, developers will be able to better plan and execute their projects. In the long term, this could boost US competitiveness in renewable energies, particularly in the face of more mature markets such as Europe.

Final thoughts

BOEM’s permit reform is an essential step towards revitalizing the US offshore wind industry. By addressing the structural issues that have held back the sector, the Mod Rule promises to create a more favorable environment for investment and innovation. This could not only help meet national energy targets, but also position the USA as a world leader in renewable energies.

The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.

All the latest energy news, all the time

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.