US nuclear regulator recommends construction permit for Kemmerer Unit 1

The environmental review of TerraPower’s Natrium project in Wyoming has been completed, paving the way for a construction permit for this advanced nuclear reactor.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The United States Nuclear Regulatory Commission (NRC) has completed its environmental assessment of TerraPower’s Natrium project, recommending the issuance of a construction permit for the Kemmerer Unit 1 plant in Lincoln County, Wyoming.

A project backed by a public-private partnership

The Kemmerer Unit 1 project, developed by US-based TerraPower, was submitted to the regulatory authority in March 2024. This demonstration reactor is funded under the US Department of Energy’s Advanced Reactor Demonstration Program (ARDP). It features a liquid sodium-cooled design integrated with a molten salt thermal storage system.

The core of the project includes an 840 MWt pool-type sodium fast reactor, coupled with an energy storage system allowing variable net electricity output of up to 500 MWe. This technology is designed to ensure steady base load production with rapid ramp-up capabilities, a feature TerraPower claims is unique among advanced reactor designs.

A positive review across multiple criteria

The Environmental Impact Statement (EIS) evaluated the project’s effects on natural environments and local communities. It also outlines that the unit will replace coal-fired generation capacity scheduled for retirement. After weighing environmental costs against economic, technical, and social benefits, the NRC staff recommends issuing the construction permit to TerraPower’s subsidiary United States Operating (USO), unless major safety concerns arise.

TerraPower President and Chief Executive Officer Chris Levesque welcomed the regulatory step as a recognition of the team’s efforts. He stated that Kemmerer Unit 1 is now “the first advanced reactor to successfully complete an environmental impact statement with the NRC.”

Next steps for the Natrium project

The Commission also noted it has accelerated its review schedule, planning to complete the permit assessment six months ahead of the original timeline. The final safety evaluation is expected by the end of December.

This regulatory milestone places TerraPower in a strategic position as the US explores new nuclear production models. The project could become an industrial reference as conventional thermal infrastructure is gradually phased out.

A government-commissioned report proposes 47 measures to simplify nuclear regulation, reduce decommissioning costs and accelerate delivery of civilian and military projects.
The Hualong One reactor at Zhangzhou nuclear power plant has been connected to the grid, marking a major milestone in the expansion of China’s civilian nuclear programme.
Russian state nuclear group Rosatom has validated the additive manufacturing of parts for its small modular reactors, marking an industrial first for RITM-200 SMR plant equipment.
California-based Maritime Fusion, backed by Y Combinator and Trucks VC, is betting on a decentralised approach to fusion to target maritime and off-grid applications.
Bayridge Resources secures a majority stake in an advanced uranium project in Canada, strengthening its strategic presence in a geologically promising region.
A significant volume of concrete from the dismantling of the Sizewell A nuclear power plant is being transferred to support the foundations of the Sizewell C project, under a partnership between UK nuclear sector stakeholders.
Korean group KEPCO and UAE-based ENEC have signed two memorandums of understanding to expand their cooperation in civil nuclear energy, artificial intelligence, and digital technologies targeting new international markets.
The Janus programme will deploy micro nuclear power plants across nine military bases to reinforce energy autonomy for critical U.S. Army installations.
The Idaho National Laboratory has started irradiation testing on uranium-zirconium fuel samples from Lightbridge in its experimental reactor, marking a key step toward the industrial validation of advanced nuclear fuel.
NexGen Energy has opened Canadian Nuclear Safety Commission hearings for the final approval of its Rook I uranium project, following more than six years of regulatory process.
Oklo has signed a binding agreement with Siemens Energy to accelerate manufacturing of the energy conversion system for its first advanced nuclear power plant in the United States.
A security document handling incident at the nuclear power plant renews concerns about TEPCO as a key decision on restarting reactors 6 and 7 approaches in Niigata.
An initial civil nuclear cooperation agreement was signed between the United States and Saudi Arabia, prompting calls from the US Congress for strict safeguards to prevent a Middle East arms race.
The launch of the Zhaoyuan nuclear project anchors the Hualong One model inland, illustrating Beijing’s strategy of regulatory normalisation in response to Western technological restrictions.
TRISO-X has started above-ground works on the first U.S. facility dedicated to manufacturing fuel for small modular reactors, marking a key industrial milestone in the deployment of the Xe-100.
The first Russian test rig for the experimental ITER reactor has been delivered to the site in France, marking a major milestone in the international collaboration on nuclear fusion.
A strategic report reveals the industrial and energy potential of Allseas’ offshore small modular reactor, which could create up to 40,000 jobs and reduce investment in the power grid.
Niigata’s governor is expected to approve the restart of one reactor at the Kashiwazaki-Kariwa plant, inactive since the Fukushima accident, reviving a strategic asset for Japan’s energy sector.
Canadian firm Aecon and private developer Norsk Kjernekraft have signed a strategic agreement targeting the deployment of BWRX-300 small modular reactors across several potential locations in Norway.
The South African government has officially lifted the PBMR reactor out of inactivity, launching a public investment programme and transferring the strategic nuclear asset from Eskom to Necsa.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.