Trafigura abandons its 750 million AUD green hydrogen project in Australia

Trafigura terminates its green hydrogen project in Port Pirie, South Australia, following a feasibility study, highlighting current industry challenges, including high costs and limited immediate commercial interest.

Share:

Gain full professional access to energynews.pro from 4.90€/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90€/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 €/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99€/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 €/year from the second year.

The Swiss commodities trading group Trafigura has announced the abandonment of its green hydrogen plant project in Port Pirie, South Australia. The project, valued at approximately 750 million Australian dollars (around 471 million USD), was initially intended to reduce carbon emissions from the local lead smelter. The announcement follows the completion of a feasibility study jointly funded by Trafigura and the South Australian regional government. The company did not disclose specific reasons for withdrawing but confirmed it would not advance beyond the preliminary stage.

A major project halted in Port Pirie

The South Australian government clarified that the initiative never progressed beyond the preliminary evaluation phase and was not incorporated into current strategic plans. Originally, this significant project aimed to support local industry decarbonization by supplying green hydrogen, produced through water electrolysis powered by renewable electricity. The feasibility study, launched in 2021 and recently completed, assessed the economic, commercial, and technical viability of the project. The study’s outcome apparently convinced Trafigura that the conditions required for investment were not met.

Trafigura thus joins a series of companies that have canceled or suspended their green hydrogen initiatives in Australia. These successive cancellations underscore structural barriers currently limiting rapid profitability in this sector. In particular, high infrastructure costs, logistical complexity, and underdeveloped demand are hindering large-scale investments. Despite significant support from the Australian federal government, which continues to fund pilot projects and related infrastructure, the market remains cautious about short-term commercial prospects.

Industry-wide caution prevails

This decision occurs amid broader uncertainty in the international energy sector regarding green hydrogen. Several major industrial and energy groups worldwide are revising their ambitions downward or postponing investment decisions. In Australia, other similar projects have recently been paused or delayed, indicating widespread market caution.

The plant planned by Trafigura represented one of the largest private investments anticipated in South Australia’s green hydrogen sector. Its cancellation raises questions about the current economic dynamics of this emerging energy form and the realistic timing of its mass adoption by industry. This withdrawal also emphasizes the importance of thorough market analyses before committing to significant industrial projects, reminding industry stakeholders of the substantial challenges still to overcome before achieving full commercial maturity.

Electric Hydrogen announces the acquisition of Ambient Fuels and an alliance with Generate Capital to offer up to $400 mn in hydrogen project financing worldwide starting in 2026.
Hynfra PSA strengthens its presence in West Africa with a $1.5bn green ammonia project, backed by the Mauritanian government, with commercial operations expected to start by 2030.
Over 500 hydrogen projects are now under construction or operational worldwide, with total committed investments reaching USD110 billion, representing an increase of USD35 billion in one year.
From 2029, Verso Energy will supply hydrogen produced in Moselle to steel group SHS, supported by a cross-border pipeline and an industrial investment exceeding €100mn.
The success of SGN’s test on a gas pipeline converted to hydrogen confirms Terra Firma Energy’s technological choices, with sites already equipped to accommodate this type of energy investment.
Lhyfe has started supplying Essent with renewable green hydrogen under a multi-year contract, marking a major commercial debut in the Netherlands for the French producer.
The Dutch government grants major funding to RWE to develop an offshore wind-powered electrolysis facility, marking a key step in the OranjeWind project.
ScottishPower pauses its renewable hydrogen projects in the United Kingdom, despite receiving public subsidies, citing a lack of commercial viability under the HAR1 programme.
thyssenkrupp nucera has completed the purchase of key assets from Green Hydrogen Systems, strengthening its position in pressurised alkaline electrolysis for industrial hydrogen production.
GH2 Solar Ltd partners with AHES Ltd to build an electrolyzer plant in Gwalior, targeting 500 MW capacity by 2030 with $19mn government support.
A cooperation agreement, a bilateral carbon-credit mechanism and converging standards lay the ground for India→Japan hydrogen and ammonia flows, with volume targets, price-support schemes and first export projects scaling up.
Hydrogen offtake agreements are multiplying, with Germany and Japan leading, mobilizing producers and industrial buyers in a still nascent but already highly competitive market.
Vema Hydrogen mobilise des experts internationaux pour accélérer la mise sur le marché de son hydrogène minéral, alors que l’entreprise prévoit de forer ses premiers puits pilotes en Amérique du Nord d’ici la fin de l’année.
First Public Hydrogen Authority opens a request for proposals to transport gaseous and liquid hydrogen across California, with a deadline set for September 12.
US-based manufacturer Ohmium unveils a new generation of modular electrolysers integrating all production systems within a reduced footprint, aiming to lower installation and operating costs for green hydrogen.
ABO Energy and Hydropulse join forces to develop decentralised green hydrogen production units in Europe, with Spain and Finland as priority markets.
Next Hydrogen secures two separate loans, including one from its executives, to consolidate liquidity and continue operations while evaluating long-term financial solutions.
Metacon receives EUR 14.9 million from Motor Oil Hellas for the approved delivery of ten electrolysis units, marking the first stage of a strategic industrial project in Greece.
The European Union’s regulatory framework mandates green hydrogen integration in refineries, generating projected demand of 0.5 million tonnes by 2030.
Air Products transported over 50 tanker trucks to the Kennedy Space Center to fill the world’s largest liquid hydrogen tank, supporting NASA’s Artemis missions.

Log in to read this article

You'll also have access to a selection of our best content.