Sonnenberg V: major partnership for a 235 MW wind project in Saxony-Anhalt

The Sonnenberg V project marks a new milestone with the signing of a cooperation agreement between ENERTRAG and EBERT for the renewal and expansion of a 235 MW wind farm in Saxony-Anhalt. —

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The German wind industry is reaching a new stage with the Sonnenberg V project, the result of collaboration between ENERTRAG SE and EBERT Erneuerbare Energien. This partnership, formalised by a cooperation agreement in July 2025, aims to renew and expand one of the largest onshore wind farms in Germany, strengthening the role of the Saxony-Anhalt region in renewable energy production.

Partnership structure and regional involvement

The historic site, operated by ENERTRAG for nearly twenty years, includes 37 wind turbines, the majority of which will be replaced as part of this repowering operation. Since 2020, EBERT Erneuerbare Energien has established itself in the region, notably through the creation of Bürgerwindpark Groß Germersleben Planungsgesellschaft mbH & Co. KG (BEG) in partnership with local landowners. This arrangement, focused on the involvement of farmers and the municipality of Oschersleben, stands out as a model for community participation in the sector.

The project is distinguished by the establishment of a land pool of more than 400 plots, allowing landowners to benefit equally from the economic impacts. The early inclusion of the community in the planning phase ensures that local interests are considered throughout the development of the wind farm.

Technical features and operational progress

Sonnenberg V foresees the installation of 29 next-generation wind turbines, each with a capacity between 6 and 8 megawatts, for a total capacity of up to 235 megawatts. Standardisation of models and tower heights will optimise maintenance and operation. The application for authorisation under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz, BImSchG) has already been submitted.

The project also integrates a sectoral innovation component, with part of the electricity produced destined for an electrolyser under construction in Osterweddingen, near Magdeburg. This installation is part of ENERTRAG’s combined power plant system, dedicated to the production, storage, and use of renewable energies.

Organisation and economic outlook

The project’s structure is based on a clear division of roles: ENERTRAG coordinates urban planning and the approval process, while EBERT manages local planning and structures regional participation. Project rights will be distributed as follows: 73% to ENERTRAG and 27% to BEG, with one turbine reserved for a municipal or citizen entity.

Construction is scheduled to start in the second half of 2027, depending on administrative permits. The new turbines will be installed progressively, in parallel with the dismantling of the older machines, some of which remain eligible for the support scheme (EEG) until the end of 2031.

The Sonnenberg V project illustrates a shift in the governance model of German wind farms, where direct involvement of regional stakeholders is becoming a central lever of development. Tom Lange, Senior Vice President Wind & PV Germany at ENERTRAG, stated: “The project shows how regional participation, economic prospects and technical implementation can move forward together at the highest level.”

Ocean Winds has deployed a LiDAR buoy off Gippsland to collect accurate data on wind and currents, a key step in its 1.3 GW offshore wind project in Australia.
TerraWind Renewables acquires five projects totalling 255MW in northern Japan, bringing its onshore wind development capacity to 327MW and targeting first commercial operation in 2028.
A consortium led by EDF power solutions has signed a 20-year agreement with Nama PWP to develop a 120 MW wind farm in southeastern Oman, with commissioning scheduled for Q3 2027.
Microsoft expands its partnership with Iberdrola through two new power purchase agreements in Spain, reinforcing its European energy strategy while deepening the use of cloud and artificial intelligence solutions from the US group.
Casa dos Ventos awards Vestas the supply, construction and maintenance of a 184-turbine complex in the state of Piauí, with an investment exceeding $1.01bn.
Warsaw tests long-term support for offshore wind with a structured tender to maximise competition, reduce financial risk and reassure a supply chain under pressure across Europe.
TotalEnergies has sold 50% of a portfolio of wind and solar projects in Greece to Asterion Industrial Partners, valued at €508mn ($554mn), while retaining operational control and the main share of electricity marketing.
Italy’s offshore wind rollout remains at a standstill, freezing over 18 GW of pending projects and weakening national renewable energy targets.
OX2 has started construction on three new onshore wind farms in Finland, bringing its total installed capacity in the country to 750 MW, a record level for a private energy sector player.
EDF power solutions announces commercial operation of the San Kraal wind farm, the first unit of the 420MW Koruson 1 project, with full commissioning expected in early 2026.
Q ENERGY has announced the entry of three local and citizen-based partners into the capital of the Ventajou wind farm, marking its first strategic equity opening to institutional and community investors.
The Norwegian government has allocated two areas of the Utsira Nord project to the Equinor–Vårgrønn and EDF–Deep Wind Offshore consortia, launching a preparatory phase before a competitive state aid auction.
German group RWE has replaced 27 old turbines with three new high-performance units at its Muel wind farm, doubling energy output and earning ZeroWaste certification.
Synera Renewable Energy Group has signed a long-term power purchase agreement with Taiwan Smart Electricity & Energy, securing a portion of generation from the Formosa 4 wind farm.
Italian group Agsm Aim has completed the acquisition of four wind farms in Apulia totalling 52.6 MW, marking a new step in its national growth strategy in the renewable energy production sector.
Twenty-five years after the opening of the first offshore wind farm at Blyth, offshore wind now provides nearly a fifth of the United Kingdom’s electricity and supports a domestic industry employing 40,000 people.
Edison plans to launch over 500 MW of new wind and solar construction sites in Italy in 2026, backed by a €600mn ($647mn) investment, as part of its strategic growth plan in renewable energy.
GE Vernova will equip the Gurbanesti wind farm with 42 onshore 6.1 MW turbines in a second deal with Greenvolt in Romania, consolidating a combined capacity of around 500 MW.
RWE has secured contracts for four renewable energy projects totalling 68 MW in Italy, with construction set to begin in 2026, reinforcing its expansion strategy in the market.
RWE and TotalEnergies will install 66 Reef cubes® around the foundations of 11 turbines at the OranjeWind wind farm, marking one of the largest applications of artificial reefs in the North Sea.

All the latest energy news, all the time

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.