Scottish Power: New offshore wind farm in the North Sea

Scottish Power signs a £1.3 billion contract with Siemens Gamesa to supply 95 wind turbines for a North Sea offshore wind farm.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The British energy company Scottish Power, announced Wednesday a contract of 1.3 billion pounds (1.5 billion euros) with the Spanish-German group Siemens Gamesa. The project involves supplying 95 wind turbines for an offshore wind farm in the North Sea.

The turbines of the “East Anglia three” park, which will be installed about 70 kilometers from the coast in southeast England, “will have a combined capacity of 1,400 megawatts. This is enough production “to meet the annual demand of 1.3 million homes,” Scottish Power said in a statement.

According to the energy company, this is the largest contract it has ever awarded. It will allow the construction of the second largest wind farm in the world. In addition, it will generate more than 2,300 jobs during construction. British Finance Minister Jeremy Hunt assured a parliamentary committee on Wednesday that the UK is a “world leader in offshore wind energy”, adding that “nearly 40% of (the country’s) electricity comes from renewable sources”.

Indeed, Hunt said the government was looking at possible measures to help the UK remain “competitive” with massive green subsidies in the US. However, we will have to wait for the fall budget presentation to know the details.

The Danish wind turbine manufacturer doubled its net profit in the third quarter despite complex market conditions, supported by increased onshore deliveries and order growth.
Danish offshore wind giant Ørsted reported a net loss of 1.7 billion kroner in the third quarter, despite a $9.4 billion recapitalisation aimed at strengthening its balance sheet and stabilising operations.
Norway's energy regulator has rejected an application to build a wind farm in the northern Finnmark region due to potential environmental impacts and threats to Indigenous Sami culture.
Danish Ørsted has signed an agreement with Apollo to sell a 50% stake in its Hornsea 3 offshore wind farm in the UK, in a strategic transaction valued at approximately DKK 39 billion ($5.43bn).
Eneco takes over Prowind’s wind project development business in the Netherlands, adding 260 MW to its portfolio. Prowind refocuses on the German market, where demand is growing rapidly.
The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.