QatarEnergy expands fleet by 104 LNG vessels

QatarEnergy expands its fleet with 104 new LNG vessels, completing the expansion of its conventional fleet and strengthening its global transport capacity.

Share:

QatarEnergy achat 19 navires LNG

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

National oil and gas company QatarEnergy has signed contracts with international companies for the operation of a further 19 LNG vessels, bringing the total number of vessels added to its fleet over the next few years to 104. This expansion, the largest ever in the LNG sector, includes agreements with CMES LNG Carrier Investment, Shandong Marine Energy (Singapore), and MISC Berhad, all with vessels built by Samsung Heavy Industries in South Korea.

Key partnerships and construction in progress

The remaining four vessels will be operated by a joint venture between Kawasaki Kisen Kaisha (K-Line) and Hyundai Glovis, and built at Hanwha Ocean in South Korea. These new additions follow an agreement with Qatari gas carrier Nakilat for the operation of 25 vessels, underlining the importance of such partnerships in fleet expansion.

Global strategy and export capability

With these 104 new vessels, QatarEnergy is supporting its ambitions to increase its LNG production capacity to 142 million tonnes per year by 2030, from the current 77 million. This expansion will play a part in meeting QatarEnergy’s growing global demand and strategic objectives.

Market impact and outlook

Qatar’s ability to sign new contracts is key to achieving its expansion objectives. However, the increase in LNG supply capacity expected between 2025 and 2027 could lead to periods of oversupply, influencing prices. Platts’ recent valuation already indicates a price decline, with a May JKM of $9.51/MMBtu.

The significant expansion of QatarEnergy’s fleet marks an important milestone in the evolution of the LNG industry, posing both challenges and opportunities for the global energy market. This ambitious strategy reflects Qatar’s determination to strengthen its leadership position while navigating a dynamic and changing market.

Dana Gas signed a memorandum of understanding with the Syrian Petroleum Company to assess the revival of gas fields, leveraging a legal window opened by temporary sanction easings from European, British and US authorities.
With the commissioning of the Badr-15 well, Egypt reaffirms its commitment to energy security through public investment in gas exploration, amid declining output from its mature fields.
US-based Venture Global has signed a long-term liquefied natural gas (LNG) export agreement with Japan’s Mitsui, covering 1 MTPA over twenty years starting in 2029.
Natural Gas Services Group reported a strong third quarter, supported by fleet expansion and rising demand, leading to an upward revision of its full-year earnings outlook.
The visit of Kazakh President Kassym-Jomart Tokayev to Moscow confirms Russia's intention to consolidate its regional energy alliances, particularly in gas, amid a tense geopolitical and economic environment.
CSV Midstream Solutions launched operations at its Albright facility in the Montney, marking a key milestone in the deployment of Canadian sour gas treatment and sulphur recovery capacity.
Glenfarne has selected Baker Hughes to supply critical equipment for the Alaska LNG project, including a strategic investment, reinforcing the progress of one of the largest gas infrastructure initiatives in the United States.
Gas Liquids Engineering completed the engineering phase of the REEF project, a strategic liquefied gas infrastructure developed by AltaGas and Vopak to boost Canadian exports to Asia.
Kuwait National Petroleum Company aims to boost gas production to meet domestic demand driven by demographic growth and new residential projects.
Chinese group Jinhong Gas finalises a new industrial investment in Spain, marking its first European establishment and strengthening its global strategy in the industrial gas sector.
Appalachia, Permian and Haynesville each reach the scale of a national producer, anchor the United States’ exportable supply and set regional differentials, LNG arbitrage and compliance constraints across the chain, amid capacity ramp-ups and reinforced sanctions.
AltaGas finalises a $460mn equity raise linked to the strategic retention of its stake in the Mountain Valley Pipeline, prompting credit outlook upgrades from S&P and Fitch.
TotalEnergies has tasked Vallourec with supplying tubular solutions for drilling 48 wells as part of its integrated gas project in Iraq, reinforcing their ongoing industrial cooperation on the Ratawi field.
The Japanese energy group plans to replace four steam turbines at its Sodegaura site with three combined-cycle gas turbines, with full commissioning targeted for 2041.
Petrus Resources recorded a 7% increase in production in the third quarter of 2025, along with a reduction in net debt and a 21% rise in cash flow.
Venture Global has signed a liquefied natural gas sales agreement with Atlantic-See LNG Trade S.A., a newly formed Greek joint venture, to supply 0.5 million tonnes annually starting in 2030, reinforcing regional energy security.
INNIO and KMW partner to construct a 54 MW modular gas power plant in Mainz, designed to stabilise the grid and ensure supply to the future Green Rocks data centre.
ExxonMobil joins a Greek energy consortium to explore a gas field in the Ionian Sea, strengthening its presence in the Eastern Mediterranean after Chevron, amid post-Russian energy diversification efforts.
Pembina Pipeline Corporation and PETRONAS have signed a long-term agreement securing 1 million tonnes per year of liquefaction capacity at Canada's Cedar LNG terminal, reinforcing their positions in the global liquefied natural gas market.
NG Energy boosts its gas production in Colombia to 40 MMcf/d, with projected sales above $11.00 per MMBtu and expected profitability in Q4 2025.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.