Northvolt cuts 3,300 jobs in Sweden following bankruptcy filing

Swedish battery manufacturer Northvolt will lay off more than half its workforce while partially maintaining operations during the bankruptcy process initiated in March.

Share:

Comprehensive energy news coverage, updated nonstop

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

7-Day Pass

Up to 50 articles accessible for 7 days, with no automatic renewal

3 €/week*

FREE ACCOUNT

3 articles/month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 30,000 articles • 150+ analyses per week

Northvolt AB, the Swedish company specialising in batteries for electric vehicles, has announced the elimination of more than 3,300 positions out of a total workforce of around 5,000. The move comes as part of the bankruptcy procedure launched in Sweden on 12 March, according to statements from court-appointed administrator Mikael Kubu, reported by Swedish news agency TT.

Founded in 2016, the company had positioned itself as a central player in Europe’s industrial strategy to rival Asian and North American markets in battery cell production. Faced with high levels of debt, Northvolt was forced to file for bankruptcy in a Swedish court. The proceedings are currently being overseen by Mikael Kubu in his role as judicial administrator.

Staff reduction and continued operations

Of Northvolt’s 5,000 employees, only 1,700 will remain in post during the period of judicial administration. Mr Kubu indicated that this substantial reduction is essential to preserve the company’s assets and facilitate a potential full or partial acquisition by an investor. Redundancy notices will begin to be issued to staff from Tuesday.

The main production site in Skellefteå, northern Sweden, will retain 1,200 employees out of the original 3,000. This site, central to Northvolt’s industrial plans, had already seen its expansion paused in September, when 1,600 job cuts were first announced.

Parallel proceedings in the United States

In addition to the proceedings in Sweden, Northvolt secured legal protection in the United States in November by filing under Chapter 11 of the US Bankruptcy Code. This measure was intended to restructure the company’s debt and reorganise its operations in the North American market. No buyer has yet been identified, and discussions are ongoing according to the most recent updates.

Mr Kubu emphasised that maintaining partial operational activity will be key in talks with potential acquirers, adding that the company’s valuation will depend largely on its ability to continue production.

US-based startup Base Power secures $1bn in Series C funding to boost domestic energy equipment production and expand its distributed storage platform nationwide.
Clean Energy Technologies has signed a letter of intent to lead multiple battery energy storage system projects across New York State, with each site planned for 5 MW of capacity.
The Hagersville Energy Storage Park, led by Boralex and SNGRDC, was awarded for its planned 300 MW capacity, making it Canada’s largest battery storage site.
Nala Renewables strengthens its position in Finland with the acquisition of a battery energy storage portfolio exceeding 250 MW from Swiss developer Fu-Gen AG.
The Japanese group has started construction of a 20MW battery energy storage system in Hokkaido, aiming for commissioning in 2027 with support from PowerX and Kyocera Communication Systems.
Nightpeak Energy has launched commercial operations of Bocanova Power, a 150 MW battery storage facility near Houston, to meet rapidly growing energy demand in Texas.
Neoen has launched construction of its first long-duration battery in Muchea and commissioned the second stage of Collie Battery, bringing its storage capacity in Western Australia to 3,145 MWh.
Ottawa invests CAD22mn ($16.1mn) to support eight technology initiatives aimed at strengthening innovation, local production, and competitiveness in the country's battery supply chain.
Neoen begins construction of its first six-hour discharge battery in Western Australia and commissions the second phase of Collie, surpassing 3 GWh of storage capacity in the State.
Transgrid plans to contract up to 5 GW of grid-forming batteries to strengthen the stability of New South Wales’ electricity network during the energy transition.
The US energy storage market set a quarterly record with 5.6 GW installed, driven by utility-scale projects despite ongoing regulatory uncertainty.
Storage provider HiTHIUM will supply 2GWh of batteries to Solarpro for multiple large-scale projects across the Balkans and Central Europe.
The three Japanese groups announced two new high-voltage battery projects in Shizuoka and Ibaraki prefectures, bringing their joint portfolio to four facilities with a combined capacity of 180MW.
EVE Energy seals a 500MWh strategic agreement with CommVOLT in Europe for commercial and industrial storage at Solar & Storage Live UK 2025, as its five MWh direct current system enters deployment.
Energy Vault Holdings has secured $50mn in debenture financing, complementing a $300mn preferred equity investment, to support the development of its large-scale energy storage projects.
Grenergy reported €86mn in EBITDA in the first half of 2025 and raised its investments to €421mn, supported by increased energy sales and major storage operations.
The 400 MWh energy storage system installed by RWE in Limondale becomes the longest-duration grid-connected battery in Australia, with full commissioning expected by the end of the year.
A steel site in Taizhou now hosts Jiangsu’s largest behind-the-meter energy storage system, with 120 MW of output and 240 MWh of capacity, developed by Jingjiang Taifu New Energy.
Braille Energy Systems will directly integrate the distribution of its lithium battery line for drag racing, previously managed by Tony Christian Racing, consolidating its motorsport operations starting October 1.
NorthX Climate Tech commits $1.6mn to three Canadian energy storage firms, supporting the development of localised grid solutions in British Columbia and Alberta.

All the latest energy news, all the time

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

7 DAY PASS

Up to 50 items can be consulted for 7 days,
without automatic renewal

3€/week*

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.