NASA Receives Largest Delivery of Plutonium-238 in Decades

NASA celebrates the receipt of a record quantity of plutonium-238, a key element for its space missions, marking a major milestone in space exploration.

Share:

Puissance nucléaire révolutionne l'exploration spatiale

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

NASA’s recent receipt of a significant quantity of plutonium-238, announced by the space agency, represents a major turning point in the history of space exploration. Plutonium-238, a rare and crucial isotope, is at the heart of the power generation systems on NASA’s space probes and rovers, particularly for missions where solar power is not viable.

Importance of plutonium-238 for space missions

This delivery of 0.5 kilograms of plutonium-238, the largest since the resumption of U.S. production over ten years ago, underlines the crucial importance of this isotope for space missions. Plutonium-238 is essential for NASA’s Radioisotope Power Systems (RPS), which convert the natural heat emitted by plutonium decay into electricity. Among these systems is the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG), which has been used to power recent Mars rovers, including Perseverance.

Challenges and advances in plutonium-238 production

The need to restart plutonium-238 production is explained by the gradual reduction in stocks. The latter is a by-product of the manufacture of nuclear weapons. With the reduction in the need for new nuclear weapons, reserves of this isotope have dwindled. In 2010, the US Department of Energy submitted a report to Congress aiming to achieve an average production of 1.5 kilograms per year by 2015. However, this target will not be met until 2026. Despite this, small quantities of this fuel have been delivered in recent years, some of which were used for the Perseverance rover.

Future prospects for space exploration with plutonium-238

RTGs remain the only option for deep space missions, according to NASA. Two potential technologies for a more efficient use of plutonium-238, the Advanced Stirling Radioisotope Generator (ASRG) and the Improved MMRTG, have been abandoned due to technical, scheduling and cost issues. Nevertheless, NASA is exploring new avenues with its next-generation RTGs, which it claims will produce more than double the power of an MMRTG with significantly less power degradation over time.

This breakthrough represents a major step forward for NASA in the use of nuclear energy to help future missions explore space. The Department of Energy’s Oak Ridge National Laboratory delivered this large shipment of plutonium-238 to NASA’s Los Alamos National Laboratory. It should be noted that this plutonium is not identical to that used in nuclear weapons and would not be ideal as fuel for a reactor. Although half a kilogram may not seem like much, this is the largest quantity of plutonium-238 distributed in recent years.

This historic delivery of plutonium-238 to NASA marks an essential milestone in space exploration, underlining the importance of this rare isotope for future missions, particularly in extreme environments where alternatives such as solar power are impractical.

First Hydrogen begins research with the University of Alberta to identify molten-salt mixtures simulating nuclear fuels for SMR prototypes.
Framatome has completed the manufacturing of the first nuclear fuel assemblies for the Barakah power plant, marking a key milestone in the supply agreement signed with Emirates Nuclear Energy Company in July.
A government-commissioned report proposes 47 measures to simplify nuclear regulation, reduce decommissioning costs and accelerate delivery of civilian and military projects.
The Hualong One reactor at Zhangzhou nuclear power plant has been connected to the grid, marking a major milestone in the expansion of China’s civilian nuclear programme.
Russian state nuclear group Rosatom has validated the additive manufacturing of parts for its small modular reactors, marking an industrial first for RITM-200 SMR plant equipment.
California-based Maritime Fusion, backed by Y Combinator and Trucks VC, is betting on a decentralised approach to fusion to target maritime and off-grid applications.
Bayridge Resources secures a majority stake in an advanced uranium project in Canada, strengthening its strategic presence in a geologically promising region.
A significant volume of concrete from the dismantling of the Sizewell A nuclear power plant is being transferred to support the foundations of the Sizewell C project, under a partnership between UK nuclear sector stakeholders.
Korean group KEPCO and UAE-based ENEC have signed two memorandums of understanding to expand their cooperation in civil nuclear energy, artificial intelligence, and digital technologies targeting new international markets.
The Janus programme will deploy micro nuclear power plants across nine military bases to reinforce energy autonomy for critical U.S. Army installations.
The Idaho National Laboratory has started irradiation testing on uranium-zirconium fuel samples from Lightbridge in its experimental reactor, marking a key step toward the industrial validation of advanced nuclear fuel.
NexGen Energy has opened Canadian Nuclear Safety Commission hearings for the final approval of its Rook I uranium project, following more than six years of regulatory process.
Oklo has signed a binding agreement with Siemens Energy to accelerate manufacturing of the energy conversion system for its first advanced nuclear power plant in the United States.
A security document handling incident at the nuclear power plant renews concerns about TEPCO as a key decision on restarting reactors 6 and 7 approaches in Niigata.
An initial civil nuclear cooperation agreement was signed between the United States and Saudi Arabia, prompting calls from the US Congress for strict safeguards to prevent a Middle East arms race.
The launch of the Zhaoyuan nuclear project anchors the Hualong One model inland, illustrating Beijing’s strategy of regulatory normalisation in response to Western technological restrictions.
TRISO-X has started above-ground works on the first U.S. facility dedicated to manufacturing fuel for small modular reactors, marking a key industrial milestone in the deployment of the Xe-100.
The first Russian test rig for the experimental ITER reactor has been delivered to the site in France, marking a major milestone in the international collaboration on nuclear fusion.
A strategic report reveals the industrial and energy potential of Allseas’ offshore small modular reactor, which could create up to 40,000 jobs and reduce investment in the power grid.
Niigata’s governor is expected to approve the restart of one reactor at the Kashiwazaki-Kariwa plant, inactive since the Fukushima accident, reviving a strategic asset for Japan’s energy sector.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.