KLN advances on WHPA offshore gas project in Libya worth HK$10bn

KLN strengthens its industrial project portfolio with progress on the WHPA platform in Libya, a major offshore site valued at over HK$10bn ($1.28bn), aimed at supporting regional gas supply.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

KLN Logistics Group Limited, through its KLN Project division, has announced significant progress on the construction of the Wellhead Platform A (WHPA) in the Bahr Essalam offshore gas field in Libya. As consortium leader appointed by Mellitah Oil & Gas Company, KLN is steering this engineering, procurement, construction and installation (EPCI) initiative, one of the largest in the Mediterranean, with a contract value exceeding HK$10bn ($1.28bn).

Targeting 2027 for operational launch

Launched in 2024, the project reached a key technical milestone between June and July 2025 with the beginning of fabrication for essential modules: the topside, jacket structure and living quarters. These components, totalling 20,000 tonnes of steel structures, are currently under assembly, keeping the project on track for its planned 2027 commissioning.

KLN is responsible for full project oversight, procurement of specialised technical equipment and coordination of offshore installation phases. Its integrated approach ensures operations remain on schedule, with strict adherence to quality and logistics standards, despite the complexities associated with large-scale offshore construction.

Growth lever for KLN’s industrial division

Marco Oriolo, Chief Executive Officer of Global Industrial Projects at KLN Project, stated that “the progress made over the past two years on the WHPA project reflects our ability to deliver critical offshore platforms with operational discipline and precision”. He added that the consortium remained aligned to deliver infrastructure vital to regional energy stability.

Active across energy infrastructure projects in Europe, the Middle East, Africa and Asia, KLN Project continues its strategic expansion. The WHPA project aligns with the company’s commitment to long-term industrial investments, addressing the rising demand for gas production infrastructure. The group’s industrial project business is expected to be a key revenue growth driver in the coming years.

Japanese power producer JERA will deliver up to 200,000 tonnes of liquefied natural gas annually to Hokkaido Gas starting in 2027 under a newly signed long-term sale agreement.
An agreement announced on December 17, 2025 provides for twenty years of deliveries through 2040. The package amounts to 112 billion new Israeli shekels (Israeli shekels) (NIS), with flows intended to support Egyptian gas supply and Israeli public revenues.
Abu Dhabi’s national oil company has secured a landmark structured financing to accelerate the development of the Hail and Ghasha gas project, while maintaining strategic control over its infrastructure.
U.S.-based Sawgrass LNG & Power celebrates eight consecutive years of LNG exports to The Bahamas, reinforcing its position in regional energy trade.
Kinder Morgan restored the EPNG pipeline capacity at Lordsburg on December 13, ending a constraint that had driven Waha prices negative. The move highlights the Permian’s fragile balance, operating near the limits of its gas evacuation infrastructure.
ENGIE activates key projects in Belgium, including an 875 MW gas-fired plant in Flémalle and a battery storage system in Vilvoorde, to strengthen electricity supply security and grid flexibility.
Hungary has signed a contract with US company Chevron to import 400mn m³ of LNG per year, while maintaining a structural dependence on Russian gas through a long-term agreement with Gazprom.
Chevron Australia awards Subsea7 a major contract for subsea installation on the Gorgon Stage 3 project, with offshore operations scheduled for 2028 at 1,350 metres depth.
Ovintiv has entered into an agreement with Pembina Pipeline Corporation to secure 0.5 million tonnes per annum of LNG liquefaction capacity over 12 years, strengthening its export outlook to Asian markets.
TotalEnergies has completed the sale of a minority stake in a Malaysian offshore gas block to PTTEP, while retaining its operator role and a majority share.
The European Union will apply its methane emissions rules more flexibly to secure liquefied natural gas supplies from 2027.
Venezuela has ended all energy cooperation with Trinidad and Tobago after the seizure of an oil tanker carrying crude by the United States, accusing the archipelago of participating in the military operation in the Caribbean.
National Fuel has secured $350mn in a private placement of common stock with accredited investors to support the acquisition of CenterPoint’s regulated gas business in Ohio.
GTT appoints François Michel as CEO starting January 5, separating governance roles after strong revenue and profit growth in 2024.
The United States is requesting a derogation from EU methane rules, citing the Union’s energy security needs and the technical limits of its liquefied natural gas export model.
Falcon Oil & Gas and its partner Tamboran have completed stimulation of the SS2-1H horizontal well in the Beetaloo Sub-basin, a key step ahead of initial production tests expected in early 2026.
Gasunie Netherlands and Gasunie Germany have selected six industrial suppliers under a European tender to supply pipelines for future natural gas, hydrogen and CO₂ networks.
The ban on Russian liquefied natural gas requires a legal re-evaluation of LNG contracts, where force majeure, change-in-law and logistical restrictions are now major sources of disputes and contractual repricing.
The US House adopts a reform that weakens state veto power over gas pipeline projects by strengthening the federal role of FERC and accelerating environmental permitting.
Morocco plans to commission its first liquefied natural gas terminal in Nador by 2027, built around a floating unit designed to strengthen national import capacity.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.