Internal Crisis at the French Nuclear Safety Authority: Issues and Implications

Faced with a controversial reform project, staff representatives at the French Nuclear Safety Authority are voicing their discontent and calling for greater transparency and involvement.

Share:

Réforme ASN tensions dialogue avenir incertain

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

In the French nuclear sector, a reform is causing great tension within the French Nuclear Safety Authority (ASN). Staff representatives, notably from UNSP-FO, the only representative union, expressed their frustration at the lack of information and transparency concerning this reform project. This situation was revealed at a social board meeting.

The ASN-IRSN Merger Project: Context and Controversy

The reform in question envisages merging the ASN with the Institut de Radioprotection et de Sûreté Nucléaire (IRSN), a project supported by ASN Chairman Bernard Doroszczuk. At a time when France is undergoing a nuclear revival, this bill raises important questions about the effectiveness and independence of the future merged authority.

The Impact of the Reform Project on ASN Employees

The concerns of ASN employees are many and varied. According to a recent survey of the Authority’s 500 employees, more than a third took part, revealing that 54% of respondents were opposed to the reform. The main concerns raised were potential disorganization, loss of agility and increased complexity of the resulting structure.

Employee Concerns and the Call to Action

Kalilou Thiam, representing UNSP-FO, also highlighted salary concerns, in particular regarding the provisions of the bill favoring IRSN employees to the detriment of ASN civil servants. Indeed, this situation has led to growing discontent among employees, with calls for concrete action. The Ministry of Energy Transition is planning meetings to discuss these issues.
In addition, IRSN’s inter-union group, representing nearly 1,800 employees, shares this sense of reluctance, as do some experts and elected representatives. Their opposition is rooted in the fear of a loss of independence in nuclear expertise, a fundamental principle established in the wake of the Chernobyl disaster.

The current crisis within the ASN reveals the crucial issues at stake in the reform of nuclear safety in France. The tension between the need for structural reform and the preservation of independence and operational efficiency underlines the complexity of the balance to be struck. The forthcoming discussions and decisions will be decisive for the future of nuclear regulation in France.

The full-scope simulator for the Lianjiang nuclear project has successfully passed factory acceptance testing, paving the way for its installation at the construction site in China's Guangdong province.
A coalition of Danish industry groups, unions and investors launches a platform in support of modular nuclear power, aiming to develop firm low-carbon capacity to sustain industrial competitiveness.
The United Kingdom and TAE Technologies create a joint venture in Culham to produce neutral beams, a key component of fusion, with strategic backing from Google.
Texas-based developer Natura Resources receives new federal funding to test key components of its 100-megawatt modular reactor in partnership with Oak Ridge National Laboratory.
Reactor Doel 2 was taken offline, becoming the fifth Belgian reactor to cease operations under the country’s gradual nuclear phase-out policy.
Rolls-Royce SMR has expanded its partnership with ÚJV Řež to accelerate the deployment of small modular reactors, targeting the construction of several units in the Czech Republic and abroad.
The Indian government aims to amend legislation to allow private companies to participate in civil nuclear development, a move positioned as critical to achieving the country’s long-term energy targets.
The VVER-1200 nuclear reactor at Xudabao 4 in China has completed installation of its final passive water tank, marking the end of modular construction for the second phase of the project.
Ottawa and Edmonton commit to a nuclear production roadmap by 2050, through a memorandum of understanding also covering carbon capture and an Indigenous-led pipeline project.
Niamey asserts control over its uranium resources by authorising open market sales of Somaïr’s production, formerly operated by France’s Orano, amid ongoing legal disputes.
Equinix has signed a strategic agreement with French start-up Stellaria to reserve 500 MWe of advanced nuclear capacity to power its future European AI data centres starting in 2035.
Bishkek plans to host a RITM-200N small modular reactor supplied by Rosatom to address electricity shortages and deepen energy ties with Moscow, despite the risks posed by Western sanctions.
The Niigata prefectural assembly will vote on the restart of Unit 6, potentially marking TEPCO’s first reactor relaunch since the 2011 Fukushima disaster.
The Norwegian government has initiated a consultation with neighbouring countries on its modular nuclear power plant project in Aure and Heim, in accordance with the Espoo Convention.
Türkiye and South Korea have signed a memorandum of understanding to jointly explore nuclear power plant projects, marking a strategic step in the long-term development of Türkiye's energy infrastructure.
Asian Development Bank has amended its energy policy to enable funding for civil nuclear projects in developing member countries across the Asia-Pacific region.
First Hydrogen begins research with the University of Alberta to identify molten-salt mixtures simulating nuclear fuels for SMR prototypes.
Framatome has completed the manufacturing of the first nuclear fuel assemblies for the Barakah power plant, marking a key milestone in the supply agreement signed with Emirates Nuclear Energy Company in July.
A government-commissioned report proposes 47 measures to simplify nuclear regulation, reduce decommissioning costs and accelerate delivery of civilian and military projects.
The Hualong One reactor at Zhangzhou nuclear power plant has been connected to the grid, marking a major milestone in the expansion of China’s civilian nuclear programme.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.