French nuclear safety reform: A controversial project

Members of parliament and trade unionists sharply criticize France's nuclear safety reform, denouncing haste and lack of clarity.

Share:

Réforme nucléaire contestée

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The reform of nuclear safety in France, currently in the formal consultation phase, is raising major concerns among experts and trade unionists alike. This reform provides for the merger of the Autorité de sûreté nucléaire (ASN) and the Institut de radioprotection et de sûreté nucléaire (IRSN) by January 1, 2025. This project was already rejected by Parliament last May, but is still on the government’s agenda.

Union and political opposition

François Jeffroy of the CFDT, representing the IRSN inter-union group, voiced his concerns at a press conference at the French National Assembly. It criticizes the speed of the consultation process, believing that the government is seeking to

“merge at all costs

The bill, unveiled on November 6, requires opinions from the various commissions by November 30, leaving little time for in-depth evaluation.

Concerns surrounding the ASN/IRSN merger

The Unsa-Spaen and SNPTES-Unsa unions on the Conseil national de l’enseignement supérieur et de la recherche (CNESER) have also expressed their dismay at this hasty decision. They point to the lack of informed deliberation, calling into question the effectiveness of this consultation. In addition, Gérard Leseul, Member of Parliament for Seine-Maritime, spoke of the uncertainties raised by this bill, particularly concerning the future involvement of private players in the operation of small nuclear reactors.

Lack of clarity and consultation

Névéna Latil-Querrec, CGT representative on the IRSN intersyndicale, emphasized the lack of clarity on the objectives and expected results of this merger. In fact, it also highlighted the grey areas concerning the public information mission of the future nuclear safety entity.

The Importance of Independent Expertise

The IRSN trade union, supported by experts and elected representatives, is firmly opposed to this reform. In addition, they defend the independence of expertise, a pillar of the ASN/IRSN dual system inherited from the lessons of Chernobyl. These criticisms were relayed during a meeting with the cabinet of the Minister for Energy Transition.

This nuclear safety reform, characterized by its speed and lack of clarity, is facing strong, well-argued opposition. Experts, trade unionists and elected representatives point to the potential risks to the independence of nuclear expertise and public safety. The situation calls for a thorough reassessment and more inclusive consultation to ensure an informed and responsible decision.

The Idaho National Laboratory has started irradiation testing on uranium-zirconium fuel samples from Lightbridge in its experimental reactor, marking a key step toward the industrial validation of advanced nuclear fuel.
NexGen Energy has opened Canadian Nuclear Safety Commission hearings for the final approval of its Rook I uranium project, following more than six years of regulatory process.
Oklo has signed a binding agreement with Siemens Energy to accelerate manufacturing of the energy conversion system for its first advanced nuclear power plant in the United States.
A security document handling incident at the nuclear power plant renews concerns about TEPCO as a key decision on restarting reactors 6 and 7 approaches in Niigata.
An initial civil nuclear cooperation agreement was signed between the United States and Saudi Arabia, prompting calls from the US Congress for strict safeguards to prevent a Middle East arms race.
The launch of the Zhaoyuan nuclear project anchors the Hualong One model inland, illustrating Beijing’s strategy of regulatory normalisation in response to Western technological restrictions.
TRISO-X has started above-ground works on the first U.S. facility dedicated to manufacturing fuel for small modular reactors, marking a key industrial milestone in the deployment of the Xe-100.
The first Russian test rig for the experimental ITER reactor has been delivered to the site in France, marking a major milestone in the international collaboration on nuclear fusion.
A strategic report reveals the industrial and energy potential of Allseas’ offshore small modular reactor, which could create up to 40,000 jobs and reduce investment in the power grid.
Canadian firm Aecon and private developer Norsk Kjernekraft have signed a strategic agreement targeting the deployment of BWRX-300 small modular reactors across several potential locations in Norway.
The South African government has officially lifted the PBMR reactor out of inactivity, launching a public investment programme and transferring the strategic nuclear asset from Eskom to Necsa.
The French Court of Auditors values EDF’s grand carénage at over €100bn, while EPR2 reactors already exceed €67–75bn. The State simultaneously directs regulation, financing, and industrial strategy, raising the risk of conflict of interest.
Belarus commits major public investment to add a third reactor at the Ostrovets plant and initiates studies for a second nuclear site to support national energy demand.
Framatome’s accident-tolerant fuel prototype has completed a second 24-month cycle in a commercial nuclear reactor in the United States, paving the way for a third phase of industrial testing.
The Wylfa site in Wales will host three Rolls-Royce small modular reactors from 2026, marking a strategic investment in the UK’s nuclear expansion.
EDF confirmed that the Flamanville EPR has reached a major milestone, while planning a nearly year-long shutdown in 2026 for extensive regulatory inspections and key component replacement.
EDF is opening access to its long-term nuclear supply contracts to companies consuming more than 7 GWh per year, an adjustment driven by the gradual end of the Arenh mechanism.
South Korean authorities have approved the continued operation of the Kori 2 reactor for an additional eight years, marking a key milestone in the national nuclear strategy.
A public-private consortium is developing a 5 MW thermal microreactor designed to operate without refuelling for ten years, marking a strategic step in Brazil's nuclear innovation efforts.
EDF has announced that the Flamanville EPR reactor is now operating at 80% of its capacity. The target of reaching full output by the end of autumn remains confirmed by the utility.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.