French nuclear safety reform: A controversial project

Members of parliament and trade unionists sharply criticize France's nuclear safety reform, denouncing haste and lack of clarity.

Share:

Réforme nucléaire contestée

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The reform of nuclear safety in France, currently in the formal consultation phase, is raising major concerns among experts and trade unionists alike. This reform provides for the merger of the Autorité de sûreté nucléaire (ASN) and the Institut de radioprotection et de sûreté nucléaire (IRSN) by January 1, 2025. This project was already rejected by Parliament last May, but is still on the government’s agenda.

Union and political opposition

François Jeffroy of the CFDT, representing the IRSN inter-union group, voiced his concerns at a press conference at the French National Assembly. It criticizes the speed of the consultation process, believing that the government is seeking to

“merge at all costs

The bill, unveiled on November 6, requires opinions from the various commissions by November 30, leaving little time for in-depth evaluation.

Concerns surrounding the ASN/IRSN merger

The Unsa-Spaen and SNPTES-Unsa unions on the Conseil national de l’enseignement supérieur et de la recherche (CNESER) have also expressed their dismay at this hasty decision. They point to the lack of informed deliberation, calling into question the effectiveness of this consultation. In addition, Gérard Leseul, Member of Parliament for Seine-Maritime, spoke of the uncertainties raised by this bill, particularly concerning the future involvement of private players in the operation of small nuclear reactors.

Lack of clarity and consultation

Névéna Latil-Querrec, CGT representative on the IRSN intersyndicale, emphasized the lack of clarity on the objectives and expected results of this merger. In fact, it also highlighted the grey areas concerning the public information mission of the future nuclear safety entity.

The Importance of Independent Expertise

The IRSN trade union, supported by experts and elected representatives, is firmly opposed to this reform. In addition, they defend the independence of expertise, a pillar of the ASN/IRSN dual system inherited from the lessons of Chernobyl. These criticisms were relayed during a meeting with the cabinet of the Minister for Energy Transition.

This nuclear safety reform, characterized by its speed and lack of clarity, is facing strong, well-argued opposition. Experts, trade unionists and elected representatives point to the potential risks to the independence of nuclear expertise and public safety. The situation calls for a thorough reassessment and more inclusive consultation to ensure an informed and responsible decision.

The French Court of Auditors values EDF’s grand carénage at over €100bn, while EPR2 reactors already exceed €67–75bn. The State simultaneously directs regulation, financing, and industrial strategy, raising the risk of conflict of interest.
Belarus commits major public investment to add a third reactor at the Ostrovets plant and initiates studies for a second nuclear site to support national energy demand.
Framatome’s accident-tolerant fuel prototype has completed a second 24-month cycle in a commercial nuclear reactor in the United States, paving the way for a third phase of industrial testing.
The Wylfa site in Wales will host three Rolls-Royce small modular reactors from 2026, marking a strategic investment in the UK’s nuclear expansion.
EDF confirmed that the Flamanville EPR has reached a major milestone, while planning a nearly year-long shutdown in 2026 for extensive regulatory inspections and key component replacement.
EDF is opening access to its long-term nuclear supply contracts to companies consuming more than 7 GWh per year, an adjustment driven by the gradual end of the Arenh mechanism.
South Korean authorities have approved the continued operation of the Kori 2 reactor for an additional eight years, marking a key milestone in the national nuclear strategy.
A public-private consortium is developing a 5 MW thermal microreactor designed to operate without refuelling for ten years, marking a strategic step in Brazil's nuclear innovation efforts.
EDF has announced that the Flamanville EPR reactor is now operating at 80% of its capacity. The target of reaching full output by the end of autumn remains confirmed by the utility.
The accelerated approval of the Aurora facility’s nuclear safety plan marks a strategic milestone in rebuilding a domestic nuclear fuel production line in the United States.
The Industrikraft consortium will invest SEK400mn ($42.2mn) to become a shareholder in Videberg Kraft, marking a new phase in Sweden’s nuclear project led by Vattenfall on the Värö Peninsula.
MVM Group has signed an agreement with Westinghouse to secure VVER-440 fuel supplies from 2028, reducing its reliance on Russia and strengthening nuclear cooperation between Budapest and Washington.
The delivery of nuclear fuel by Russian subsidiary TVEL to the Da Lat research reactor marks a key step in strengthening the nuclear commercial partnership between Moscow and Hanoi.
US supplier X-energy has formalised a graphite supply contract with Japan's Toyo Tanso for the construction of its first four small modular reactors, in partnership with Dow and backed by the US Department of Energy.
US-based Enveniam has signed an agreement with LIS Technologies Inc. to oversee the design and construction of a new laser-based uranium enrichment facility on American soil.
Faced with shorter approval timelines, several European nuclear firms, including Newcleo, Orano and Urenco, are considering relocating key industrial investments to the United States.
A consortium led by Swedish giants such as ABB, SSAB and Volvo will invest SEK400mn to support the development of small modular nuclear reactors through a strategic partnership with Vattenfall.
Russia and India are preparing an expanded agreement for the construction of VVER-1200 reactors and modular nuclear power plants, while accelerating work at the strategic Kudankulam site.
Fusion Fuel Cycles has begun work on its UNITY-2 facility, a unique test bench designed to validate the full tritium fuel cycle under fusion conditions, marking a key step toward fusion energy.
Framatome will produce TRISO fuel at Romans-sur-Isère as part of a pilot project for advanced nuclear reactors, in partnership with actors such as Blue Capsule Technology.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.