France: Nuclear revival rejected after amendment error

The French National Assembly’s Economic Affairs Committee mistakenly rejects a crucial article on France's nuclear strategy, causing significant parliamentary confusion and casting doubt on the country’s energy targets.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

A poorly formulated amendment has unexpectedly led to the rejection of a strategic article intended to revive nuclear energy in France by the Economic Affairs Committee of the National Assembly. The article explicitly aimed to set ambitious targets: the installation of an additional 27 gigawatts (GW) of nuclear capacity by 2050. Initially, it laid out precise interim milestones, notably achieving 10 GW by 2026, including the construction of six European Pressurized Reactor (EPR2) units. The accidental removal of these interim milestones through an amendment proposed by Socialist MP Marie-Noëlle Battistel resulted in the complete rejection of the article.

An amendment at the heart of confusion

Socialist MP Marie-Noëlle Battistel acknowledged to her colleagues that she had made a material error in drafting her amendment, stating that she intended to target another provision of the text. The adopted amendment ultimately eliminated the interim targets, which specifically defined the necessary steps for implementing new nuclear capacities. The text’s rapporteur, Antoine Armand, had warned about the major impact this change would have on the overall coherence of the bill. Despite his warnings, maintaining this amendment automatically led to the rejection of the entire article.

The session witnessed heated exchanges, revealing a clear divide between MPs from the presidential majority, supporters of nuclear revival, and those from the Socialist opposition, some of whom supported the amendment. Antoine Armand criticized this as a political move aimed at slowing French nuclear development, while Socialist MPs justified their vote as a clear statement of disagreement with the ambitions initially proposed. This political disagreement further intensifies existing tensions surrounding national energy decisions.

Immediate implications for the industry

This rejection places the text in a precarious situation ahead of debates scheduled for the plenary session on June 16. MPs must quickly decide whether to reintroduce the interim objectives via amendments or completely rethink the formulation of the article to ensure legislative coherence. The resulting legal and political uncertainty could temporarily influence investment decisions by major companies in the French nuclear sector.

The entire French and international energy sector is closely watching the legislative aftermath of this incident, aware that upcoming parliamentary decisions will directly impact the medium-term strategies of the businesses involved. Economic stakeholders must now navigate unexpected instability arising from a purely technical error within an already sensitive energy context.

French nuclear reactor developer Newcleo has submitted its lead-cooled small modular reactor design to Euratom, initiating the first regulatory phase to integrate nuclear non-proliferation safeguards at the European level.
French state utility EDF has increased the maximum estimated cost for building six new nuclear reactors to €72.8 billion ($85.29 billion), representing a 40% rise over the original figure.
US-based Holtec has signed a memorandum of understanding with Hungary’s energy group MVM to assess the deployment of its SMR-300 technology, strengthening bilateral nuclear cooperation and opening prospects for a new market in Central Europe.
California-based startup Radiant has secured $300mn to build its first factory in Tennessee and prepare for the mass production of miniature nuclear reactors for off-grid applications.
Terra Innovatum has increased its interactions with the Nuclear Regulatory Commission to advance licensing of its SOLO™ micro-modular reactor, despite the partial shutdown of the US federal government.
The US nuclear regulator has extended the operating licences of three Illinois reactors by 20 years, strengthening Constellation's long-term industrial outlook for the Clinton and Dresden sites.
The SATURNE Industrial Chair aims to develop innovative uranium extraction methods, with joint funding from Orano and the National Research Agency over a four-year period.
US-based X-energy has signed a reservation agreement with South Korea's Doosan Enerbility to secure key components for its small modular nuclear reactors.
Niger expands its mining alliances with Uranium One to develop new sites, while the Dasa project continues seeking financing despite clear political backing.
Samsung Heavy Industries has received Approval in Principle for a floating nuclear plant featuring two SMART100 reactors, marking a step toward the commercialisation of offshore small modular reactors.
The Indian government proposes a unified legal framework for nuclear energy, aiming to boost private investment and increase installed capacity to 100 GW by 2047.
Samsung C&T strengthens its presence in modular nuclear energy in Europe by signing an agreement with Synthos Green Energy to develop up to 24 SMRs in Poland and several Central European countries.
Israeli firm nT-Tao and Ben-Gurion University have developed a nonlinear control system that improves energy stability in fusion plasmas, strengthening the technical foundation of their future compact reactors.
The Indian government has introduced a bill allowing private companies to build and operate nuclear power plants, ending a state monopoly in place for over five decades.
Natura Resources enters a new regulatory phase for its molten salt reactor MSR-1, following the signing of a framework agreement with the US Department of Energy under the Reactor Pilot Program.
Norwegian Nuclear Decommissioning is surveying 22 localities to assess their interest in hosting storage facilities for radioactive waste from the country’s former research reactors.
Electricité de France's Flamanville 3 reactor has reached full power for the first time, marking a key industrial milestone in the deployment of EPRs in Europe, despite cost overruns reaching EUR23.7bn ($25.7bn).
GE Vernova Hitachi’s BWRX-300 small modular reactor has passed a key regulatory hurdle in the United Kingdom, opening the door to potential commercial deployment, despite no current plans for construction.
Molten salt reactor developer Natura Resources has acquired Shepherd Power and partnered with NOV to scale up modular reactor manufacturing by the next decade.
China National Nuclear Corporation expects commercial operation in 2026 for its ACP100 reactor, following successful cold testing and completion of critical structures in 2025.

All the latest energy news, all the time

Annual subscription

8.25£/month*

*billed annually at 99£/year for the first year then 149,00£/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2£/month*
then 14.90£ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.