European Energy wins two CRE tenders for its agrivoltaic projects in Saint-Voir
European Energy France has secured two wins in tenders issued by the French Energy Regulatory Commission for its agrivoltaic parks in Saint-Voir, with a combined capacity of 14.3 MWp and commissioning expected by late 2027.
| Sector | Énergie Solaire, Agrivoltaïsme |
|---|---|
| Theme | Développement de projets, Annonce |
The two agrivoltaic projects developed by European Energy France in Saint-Voir, located in the Allier department, have been named winners in two tenders launched by the French Energy Regulatory Commission (Commission de régulation de l’énergie – CRE). These projects amount to a total installed capacity of 14.3 megawatt-peak (MWp) and are expected to generate 2 gigawatt-hours (GWh) annually. Construction permits were granted in August 2024, with the parks scheduled to begin operations by the end of 2027.










Comments
Sign in to leave a comment.