EDP Renewables installs its first battery energy storage project

EDP Renewables announces its first stand-alone battery energy storage project in the UK. This strategic initiative aims to strengthen the power grid, support renewable energies and mitigate the impact of intermittency on energy resources.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

EDP Renewables, the world’s fourth-largest producer of renewable energy, plans to install its first stand-alone battery energy storage system (BESS) in the UK. This strategic initiative will optimize resources and improve overall energy performance. The project will add around 50 MW to the power grid, providing 2 hours of storage capacity.

EDP Renewables and the importance of long-term energy storage

This asset will play a crucial role in power grid management, increasing flexibility and supporting the government’s renewable energy strategy. It will be located in Kent, England, and has been acquired from Tupa Energy. The company specializes in power generation and battery storage technologies for utilities. The project should be operational by the end of 2024.

“The integration of storage systems will play a crucial role in the energy mix of the future, helping to meet the challenge of intermittency. By mitigating the impact of external factors that can affect availability, these systems are key to overcoming one of the main limitations facing renewable energies in Europe, while producing zero emissions,” says Miguel Stilwell d’Andrade, CEO of EDPR.

The UK, an advanced market for battery storage

EDPR attaches great importance to energy storage as part of its long-term strategy. The company anticipates significant growth in this segment, notably through various initiatives planned in the UK. The country appears to be the most advanced market in Europe for the development of battery storage assets, benefiting from a comprehensive regulatory framework offering a fixed 15-year tariff floor.

EDP Renewables’ commitment to global energy efficiency

The country currently has 2.2 GW of grid-connected battery projects, with 2 GW under construction. EDP Renewables is targeting over 500 MW of storage capacity in its 2023-2026 Business Plan. The majority will come from co-located assets, with a few recently acquired stand-alone assets. In addition, EDPR has nearly 200 MW of storage under contract in North America and more than 4 MW under construction in Asia-Pacific.

The group has won a strategic project with operator Amprion to deploy five 50 MW batteries to ease pressure on the German power grid and optimise electricity transmission.
Vena Energy has begun construction of a 408 MWh battery energy storage system in Tailem Bend, marking a new phase in the deployment of its infrastructure in Australia.
The explosion of battery storage applications in Germany is causing grid congestion and pushing Berlin to revise its regulatory framework to prevent market saturation.
The collapse in storage costs positions batteries as a key lever for dispatchable solar, but dependence on Chinese suppliers creates growing tension between competitiveness and supply chain security.
JA Solar has launched a microgrid combining 5.2 MW of solar and 2.61 MWh of storage at an industrial site in Sicily, marking its first application of the "PV+Storage+X" model in Italy.
Sinexcel has installed a 2MW/8MWh energy storage system in Matsusaka, marking a breakthrough in a regulated market after five years of technical partnerships and gradual deployment in Japan.
Inlyte Energy has successfully completed factory validation testing of its first full-scale iron-sodium battery, witnessed by Southern Company, paving the way for a pilot installation in the United States in early 2026.
Neoen begins construction of a new 305 MW stage in Australia, raising its total battery storage capacity in the country to 2 GW, and signs two additional virtual battery contracts with ENGIE.
ENGIE has awarded NHOA Energy the contract for a 320 MWh battery energy storage system in Drogenbos, marking a new step in their industrial partnership in Belgium.
Stardust Power has completed an independent review of its lithium refinery project in Muskogee, confirming technical feasibility and compliance with industry standards for its initial production phase.
California-based battery manufacturer South 8 Technologies has secured $11mn to boost production of its LiGas cells, targeting military and space applications under extreme conditions.
Samsung SDI will supply LFP cells for energy storage systems in the United States starting in 2027, under a multi-year deal valued at $1.53bn.
Bitzero Holdings launches a new 70 MW expansion phase in Namsskogan, Norway, targeting a total capacity of 110 MW and an upgrade of its high-performance computing capabilities.
Remixpoint and Nippon Chikudenchi have formalised a partnership to develop seven 2MW/8MWh BESS facilities by October 2026 through a newly established joint venture.
UK-based Ray Systems has selected Beam Global to supply tailored battery systems for its new autonomous underwater drones, aiming to extend mission duration without compromising stealth or manoeuvrability.
Sungrow has started construction on a 200 MW/400 MWh battery storage system for ENGIE, aimed at strengthening grid stability in a state heavily reliant on renewable energy.
Blue Current secures over $80mn in funding led by Amazon to industrialise its silicon solid-state batteries for large-scale mobility and stationary applications.
AGL has begun construction of a 500 MW battery storage system in Tomago, a project valued at AUD800mn ($530.8mn), in the Hunter region, with commissioning expected in 2027.
Real estate group JALCO Holdings diversifies its activities by investing in a 2 MW/8.1 MWh battery energy storage system developed by Taoke Energy in Narita, Chiba Prefecture.
BKW is conducting feasibility studies on four sites to assess the profitability and development conditions for large-scale battery storage installations in Switzerland.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.